HomeMy WebLinkAboutFile Documents.312 S Mill St.0042.2019.ACBK5.2.2019
Bosq Restaurant
312 S. Mill Street
Aspen, CO, 81611
RE: CMP
1.0 General
Total SF - 555 SF
2.0 Project Introduction
2.1 To re-erect the deck at Bosq, 312 S. Mill St, on the leasable mall area.
We will cover 555 SF of mall space, our leasable amount from the city.
2.2 Vicinity map - Drawings attached.
2.3 This development is temporary trex deck that sits on the mall.
3.0 Project Documentation
3.1 Permit types – permit not issued yet
3.2 n/a
3.3 Project sign – n/a
3.4 Contact List
Owner - Barclay Dodge 970.618.7019 barclay@bosqaspen.com
Contractor – Dan Coleman 970.948.3195 dan.cbcllc@earthlink.net
Site Supervisor - Barclay Dodge 970.618.7019 barclay@bosqaspen.com
Dan Coleman 970.948.3195 dan.cbcllc@earthlink.net
Safety Officer – n/a
Traffic Officer – n/a
Erosion Control – n/a
4.0 Project Implementation
4.1 Dates of Construction – approximately May 18th, final date from the City
Clerk’s Office has not been given, but is around this time.
4.2 Hours of Construction - this is roughly a 5 hour job that will be executed
between the hours of 9am – 5pm.
4.3 Construction Schedule – 1 day TBD by mall lease
4.5 n/a
4.6 n/a
4.7 n/a
5.0 Site Management
We will park an 18 ft. trailer in the alley behind Bosq and unload the deck by
hand. No dumpsters are necessary. Materials include trex decking and
concrete bricks.
05/10/2019
APPROVED AS Noted
JF 5/24/19
Contractor to limit alley
to minimum amount as possible.
No disruption to trash or
deliveries. Call dispatch
920-5310 at beginning and end
of closure so EMS knows the
alley is blocked.Unload
trailer immediately and remove
from alley.
6.0 Traffic Control – n/a
8.0 Sediment Erosion Control - n/a
9.0 Fugitive Dust Control – n/a
10.0 Emissions – n/a
11.0 Noise Suppresion – n/a
Summation: In the alley behind Bosq, we will be unloading the pre-fabricated deck
and handrails from a 18” trailer by hand, hand-carry them to the site on the mall we
lease from the city, construct the deck with a drill and 3” deck screws. Total time
needed to erect the deck is roughly 5 hours. No waste removal is needed and no
heavy equipment will be used.
05/10/2019
APPROVED AS Noted
JF 5/24/19
Contractor to limit alley
to minimum amount as possible.
No disruption to trash or
deliveries. Call dispatch
920-5310 at beginning and end
of closure so EMS knows the
alley is blocked.Unload
trailer immediately and remove
from alley.