ASBESTOS INSPECTION REPORT
CLIENT:Tardie Brent
ADDRESS:315 Dean Street
Aspen Colorado. 891611
EMAIL: btardie@aspenconstructors.com
PHONE:970-948-8798
ECOS JOB NUMBER G-18-493-AT
PROJECT LOCATION: 315 Dean Street
Aspen Colorado. 891611
DATE OF INSPECTION:9-11-2018
ECOS Environmental – Glenwood Springs
6690 Hwy 82
Glenwood Springs, CO 81601
Office – (970) 945-4407
2
SUMMARY
ECOS Environmental & Disaster Restoration (ECOS) was retained to conduct an asbestos inspection at
the above location in reference to determining if there is asbestos containing material (ACM), in
building materials that are located in the CHEF CLUB restaurant. The inspection was performed in
accordance with the Standards of Practice of the Colorado Regulation 8 Part B in effect at the time of this
Inspection. This inspection is not intended to be technically exhaustive. The inspection included all
accessible building materials in the CHEF CLUB restaurant, however, should any additional building
materials be discovered during demolition, those materials must be sampled and analyzed prior to
continuing with the work. Twelve (12) samples were collected of all suspect materials throughout the
CHEF CLUB restaurant, as listed in the Lab Data Table located on Page 9 of this report.
The Inspector has prepared this written asbestos Inspection Report for the sole use and benefit of the
client. The asbestos inspection report shall identify, report, and make recommendations for future
evaluation. Client agrees to read the entire asbestos inspection report when received and shall promptly
call the inspector with questions or concerns regarding the report. The use of this report and
information contained herein by others, in whole or in part, is not authorized without the written
mutual consent of the client and ECOS Environmental.
INSPECTOR QUALIFICATIONS
This inspection was performed by Yuri Rivera, Colorado State Department of Public Health and
Environment Certification Number 24317.
SAMPLE ANALYSIS PROCEDURE
ECOS collected bulk samples of the homogenous materials in a random and representative manner, as
determined by the Inspector. A minimum of one composite core samples that included all layers within
the suspect material was obtained from each homogenous area. Samples of soft friable materials were
obtained by removing a small portion using wetting techniques. The sampler cleaned equipment
following collection of each sample to minimize cross-contamination between samples. The sampler
assumed that materials in inaccessible locations were similar to those in accessible locations, in order to
limit destruction during the sampling process. All samples were placed in sealed, labeled containers,
and the sample descriptions and locations were recorded. Samples were delivered under a chain of
custody for analysis to Aerobiology Laboratory in Denver, CO. Samples were analyzed by Polarized
Light Microscopy.
Performance of this asbestos inspection is intended to reduce, but not eliminate, uncertainty regarding
the presence of ACBM in connection with the above referenced property. No guarantee is expressed or
implied that all ACBM was identified in the inspection. Therefore, ECOS Environmental cannot be held
accountable for restrictions placed on us by the client, conditions or information that remained
unknown, or areas that were inaccessible at the time of the inspection.
3
TRANSMITTAL OF BUILDING
One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted
by the building/structure owner as follows:
•One copy of the completed asbestos survey shall be sent by the owner or their agent to the local
government entity charged with issuing a permit for such demolition, renovation, remodeling or
repair work under applicable State or local laws.
•The completed asbestos survey shall be kept on the construction site with the asbestos
notification and variance, if required, throughout the duration of the asbestos project and any
associated demolition, renovation, remodeling or repair project.
BUILDING/STRUCTURE ASBESTOS SURVEY INFORMATION
The asbestos survey shall, at a minimum, identify and assess with due diligence, the locations,
quantities, friability and conditions of all building material types at the affected portion of the
building/structure. The certified asbestos inspector is responsible for identification and assessment of
all type within the affected portion of the building/structure.
All building materials visually assessed shall be assumed to be asbestos containing building material
(ACBM), unless bulk sampling is conducted as per standard EPA and OSHA accepted methodologies.
The subsequent analysis is performed by a laboratory that meets the requirements and the analyses
satisfies both CO STATE ELAP and federal requirements, including multi- layered sample analyses, to
document non-asbestos containing material.
The building/structure asbestos survey shall also include the building/structure name, address, the
building/structure owner’s name and address, the name and address of the owner's agent, the name of
the firm performing the asbestos survey and a copy of the firm’s current asbestos handling license, the
names of the certified inspector(s) performing the survey and a copy of the current asbestos handling
certificate for each inspector utilized, the dates of the asbestos survey, a listing of homogeneous areas
identifying which ones are ACBM, all laboratory analysis reports for bulk samples collected, and copies
of the appropriate certifications for the laboratory used for analysis of samples taken during the asbestos
survey.
REMOVAL REQUIREMENT
If the building/structure asbestos survey finds that the portion of the building/structure to be
demolished, renovated, remodeled, or have repair work contains asbestos containing building material
(ACBM), which is impacted by the work, the owner or the owner’s agent shall conduct, or cause to have
conducted, asbestos removal performed by a licensed asbestos abatement contractor in conformance
with all standards set forth.
All ACBM impacted by the demolition, renovation, remodeling or repair project shall be removed, prior
to access or disturbance by other uncertified trades or personnel. No demolition, renovation, remodeling
or repair work shall be commenced by any owner or the owner’s agent prior to the completion of the
4
asbestos abatement in accordance with the notification requirements. For multi-phased work, the access
restriction for uncertified trades or personnel applies to each intermediate portion of the entire project.
Upon completion of the intermediate portion of the asbestos project, other trades, or personnel may
access that portion of the work site. For demolition projects that are exempt from asbestos survey
requirements due to being structurally unsound, the demolition is considered an asbestos project.
All building/structure owners and asbestos abatement contractors on a demolition, renovation,
remodeling, or repair project shall inform all trades on the work site about the ACBM at the work site.
UNIDENTIFIED AND UNASSESSED ASBESTOS
When any construction activity, such as demolition, remodeling, renovation or repair work, reveals
suspect ACBM that has not been identified by the asbestos survey, or has not been identified by other
inspections as per current OSHA or EPA requirements, all activities shall cease in the area where the
suspect ACBM is found. Unassessed suspect miscellaneous ACBM shall be treated and handled as
ACBM and assumed to be ACBM, unless proven otherwise by standard EPA and OSHA accepted
methods. To document non-asbestos containing material, analysis must be performed by a laboratory
that meets the requirements of the DOH; and the analysis satisfies both CO STATE ELAP and federal
requirements.
ASBESTOS PROJECTS
An asbestos project is any work that involves the removal, encapsulation, enclosure, repair or
disturbance of friable or non-friable asbestos, or any handling of asbestos material that may result in the
release of asbestos fibers. For the purpose of compliance an asbestos project shall include any
disturbance of asbestos fibers, and the planning, asbestos survey, design, background air sampling,
inspection, air sampling and oversight of abatement work, cleanup, and the handling of all asbestos
material subject to abatement, as well as the supervising of such activities. An asbestos project starts
with Phase I when the planning, asbestos survey, and design work begins or is required to begin. The
project shall not be considered completed until Phase II D is complete. (See Table 1 below).
Phase I
(Prior to Asbestos
Abatement Contractor)
Phase II
Start -> Abatement -> End
A B A B C D
Asbestos
survey,
planning,
and design
Background
air sampling
Regulated
abatement
work area(s)
preparation
and enclosure
construction
Asbestos
handling
including gross
removal or
abatement, initial
cleans, and waste
Final
cleaning
and
clearance
air samples
Final waste
removal
from site
Start -> Asbestos Project ->Final Clearance
5
ASBESTOS RESULTS FLOW CHART
ASBESTOS PROJECT SIZE
Large asbestos project: An asbestos project involving the removal, disturbance, enclosure,
encapsulation, repair or handling of 160 square feet or more of ACBM, or 260 linear feet or more of
ACBM.
Small asbestos project: An asbestos project involving the removal, encapsulation, enclosure, repair,
disturbance or any handling of more than 10 and less than 160 square feet of ACBM or more than 25 and
less than 260 linear feet of ACBM.
Minor asbestos project: An asbestos project involving the removal, disturbance, repair, encapsulation,
enclosure or handling of 10 square feet or less of ACBM or 25 linear feet or less of ACBM.
Homogenous areas sampling requirement: SF= Square Footage. LF= Linear Footage
Asbestos Test
0% -Non Detect
No Action
Required
< 1%
OSHA
Requirements
NO Permit
Required
ECOS provides
clearance (NOT
required)
>1%
Reg. 8
Requirements
Permit
Clearance Testing
Manifested
Disposal at
Approved Landfill
Additional Reg. 8
Requirements
>3,000 SF
Project Design
Project Manager
Oversight
6
HOMOGENOUS MATERIAL TYPE QUANTITIES MINIMUM # OF SAMPLES
SURFACING MATERIAL
0 TO < 1,000 SF 3
1,000 TO 5,000 SF 5
>5,000 SF 7
THERMAL SYSTEM INSULATION EACH MATERIAL 3
PATCH < 6 SF, LF 1
MISCELLANEOUS MATERIALS EACH MATERIAL 2
ASBESTOS REMOVAL CATEGORIES
Category I Non-Friable ACBM: NESHAP classification - Asbestos-containing packings, gaskets, resilient
floor covering, and asphalt roofing products, containing more than one percent (1%) asbestos, that when
dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Category II Non-Friable ACBM: NESHAP classification - Any material, excluding Category I Non-
Friable ACM, containing more than one percent (1%) asbestos that, when dry, cannot be crumbled,
pulverized, or reduced to powder by hand pressure.
Class I Asbestos Work: OSHA term meaning activities involving the abatement of Thermal Systems
Insulation (TSI) and surfacing ACBM and PACM.
Class II Asbestos Work: OSHA term meaning activities involving the abatement of ACBM which is not
TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing
wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics.
Class III Asbestos Work: OSHA term meaning Repair and Maintenance operations, where no more than
a minor quantity of ACM, including TSI and surfacing ACBM and PACM, is likely to be disturbed.
Class IV Asbestos Work: OSHA term meaning Maintenance and Custodial Activities during which
employees contact but do not disturb ACBM or PACM and activities to clean up non-ACBM dust, waste
and debris resulting from Class I, II and III activities.
7
DEFINITIONS
Abatement: Procedures to control fiber release from asbestos material. This includes removal,
encapsulation, enclosure, repair, and disturbance of friable asbestos or any handling of asbestos material
that may result in the release of asbestos fibers.
Amosite: An Asbestiform mineral of the amphibole group containing approximately
50% silicon and 40% Iron (II) Oxide, and is made up of straight brittle fibers, light gray to pale brown in
color.
Amphibole: One of the two major groups of minerals from which the Asbestiform minerals are derived,
distinguished by their chain-like crystal structure and chemical composition.
Asbestos: A generic name given to a number of naturally occurring hydrated mineral silicates that
possess a unique crystalline structure, are incombustible in air, and are separable into fibers. Asbestos
includes the asbesti-form varieties of chrysotile (serpentine); crocidolite
(riebeckite); amosite (cummington-grunerite); anthophyllite; and actinolite.
Asbestos Project: Work undertaken by a contractor which at any time involves any aspect of the
removal, encapsulation, enclosure or disturbance of friable asbestos, or any handling of asbestos
material that may result in the release of asbestos fiber, except work in an owner-occupied single-family
dwelling performed by the owner of such dwelling. An asbestos project shall include the planning,
design, monitoring, inspection, and air sampling of abatement work, as well as the supervising of such
activities.
Building Owner: The person in whom legal title to the premises is vested unless the premises are held
in land trust, in which instance building owner means the person in whom beneficial title is vested.
Electron Microscopy: A method of asbestos sample analysis which utilizes an electron beam to
differentiate between fibers.
Emergency: An unexpected, unanticipated or unforeseen occurrence, including but not limited to, a
steam, chemical, gas or water line rupture, a boiler failure, or a building collapse, which poses (a) an
imminent danger to the health and safety of the public, the response to which will constitute an asbestos
project; or (b) an asbestos- related risk to the health and safety of the public from exposure to asbestos
fibers.
Friable Asbestos: Any materials that contain asbestos and can be crumbled, pulverized, or reduced to
powder by hand pressure.
HEPA Filter Vacuum Equipment: Vacuuming equipment with a high efficiency particulate air filtration
system. This filter is capable of trapping and retaining 99.97 percent of asbestos fibers greater than 0.3
microns equivalent aerodynamic diameter.
Homogenous: Evenly mixed and similar in appearance and texture throughout.
NESHAP: National Emission Standard for Hazardous Air Pollutants
OSHA: Occupational Safety and Health Administration
8
Operations and Management Plan (OMP): Specific procedures and practices developed for the interim
control of asbestos-containing materials in buildings until it is removed.
Polarized Light Microscopy (PLM): An optical microscopic technique used to distinguish between
different types of asbestos fibers by their shape and unique optical properties.
Repair: Corrective action using required work practices to control fiber release from damaged asbestos
material.
TSI: Thermal Systems Insulation
ACBM: Asbestos containing building material
Surfacing Material – material that is sprayed on, troweled on, or otherwise applied to surfaces,
such as acoustical plaster on ceilings and fireproofing materials on structural members, or other
materials on surfaces for acoustical, fireproofing, or other purposes.
Thermal System Insulation – material applied to pipes, fittings, boilers, breeching, tanks,
ducts, or other interior structural components to prevent heat loss or gain, or water
condensation, or for other purposes.
Miscellaneous Materials – interior building material on structural components, structural
members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or
thermal system insulation.
9
HOMOGENOUS AREAS SAMPLED DURING INSPECTION
Sample Material
LOCATION DETECT? % ACBM Friability Condition POT. FOR DIST. # OF SAMPLES APPR. SF A-1 Joint compound,
tape, texture, paint
and drywall.
Ceiling main entry N F G L 5 2500SF
A-2 Joint compound,
tape, texture, paint
and drywall.
Ceiling kitchen exit N F G L
A-3 Joint compound,
tape, texture, paint
and drywall.
Wall kitchen entry N F G L
A-4 Joint compound,
tape, texture, paint
and drywall.
Hostess/computer Closet N F G L
A-5 White/tan drywall
with white paint
Wall next to emergency exit N F G L
B-1 Compound,
texture, paint
Snowflake decoration on celling N F G L 2 10
B-2 Paper, compound,
paint, resinous
material.
Snowflake decoration on celling N F G L
K-1 Yellow ceiling tile,
white coating
Drop down ceiling tiles kitchen entry N F G L 3 1800sf
K-3 Yellow ceiling tile,
white coating
Drop down ceiling tiles kitchen N F G L
K-2 Yellow ceiling tile,
white coating
Drop down ceiling tiles kitchen N F G L
G-1 White resinous
material
Log cover N F G L 2 485lf
G-2 White resinous
material
Log cover N F G L
10
KEY:
CONDITION
G= NO VISIBLE DAMAGE
D= VISIBLE DAMAGE <10% OVER ENTIRE MATERIAL OR 25% LOCALIZED
SD= VISIBLE DAMAGE >10% OVER ENTIRE MATERIAL OR 25% LOCALIZED
FRIABLE CATEGORY
F= FRIABLE MATERIAL; MATERIALS THAT CAN CRUMBLE OR BE REDUCED TO POWDER BY HAND PRESSURE
NFI= CATEGORY I NON-FRIABLE MATERIAL; MATERIALS THAT CANNOT BE CRUMBLED OR REDUCED TO
POWDER BY HAND PRESSURE THAT DO NOT INCLUDE CATEGORY I NON-FRIABLE MATERIALS.
POTENTIAL FOR DISTURBANCE
L= LOW POTENTIAL FOR DAMAGE
D= POTENTIAL FOR DAMAGE
SD= POTENTIAL FOR SIGNIFICANT DAMAGE
INVENTORY SAMPLELOCATION/FUNCTIONAL SPACES INCLUDED IN
HOMOGENOUS AREA
DESCRIPTION
A DRYWALL CEILING AND WALLS TROWEL TEXTURE
B SNOWFLAKES DECORATIORM CELING RESTAURANTE TEXTURE/PAINT
K DROOP DOWN CEILING TEXTURE/INSOLATION
G LOG PANELING WOOD/GROUT
CONCLUSION
Visual inspection was completed of building materials in the CHEF CLUB restaurant before emodeling
of building materials in a restaurant. Twelve (12) samples were collected and sent to Aerobiology
Laboratories in Golden, CO, for analysis using Polarized Light Microscopy (PLM). The samples came
back non-detect for asbestos.
11
LAB RESULTS AND COC
12
13
14
15
CERTIFICATIONS
16
43
17
PHOTOS
18
19
20
21
FINAL NOTES
This report represents the opinion of the reporting asbestos inspector at the time of the asbestos
assessment survey. If you have any further questions, or if additional information is needed please do
not hesitate to call.
Sincerely,
Yuri Rivera
Colorado State EPA Asbestos Inspector #24317
ECOS Environmental & Disaster Restoration, Inc.
(970) 945-4407