Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.320 W Bleeker St.0188.2017 (27).ARBK
RIVERDANCE ESTIMATED SCHEDULE OF VALUES DIVISION 1 GENERAL REQUIREMENTS DIVISION 2 SITE CONSTRUCTION MICRO PILING 250000 DIVISION 3 CONCRETE DIVISION 4 MASONRY DIVISION 5 METALS DIVISION 6 WOOD & PLASTICS DIVISION 7 THERMAL & MOISTURE DIVISION 8 DOORS & WINDOWS DIVISION 9 FINISHES DIVISION 10 SPECIALTIES DIVISION 11 EQUIPMENT DIVISION 12 FURNISHINGS DIVISION 13 SPECIAL CONSTRUCTION DIVISION 14 CONVEYING SYSTEMS DIVISION 15 MECHANICAL WATER STORAGE TANK 40000 DIVISION 16 ELECTRICAL EL LINE TO SITE 25000 SUBTOTAL 315000 CONTRACTOR FEE, 10% TOTAL COST 1 City of Aspen Received 8/15/17 Building Department 0188.2017.ARBK % $268,380.00 540540 12 $246,015.00 495495 11 $0.00 142000 $268,380.00 540540 12 $223,650.00 450450 10 $89,460.00 180180 4 $290,745.00 585585 13 $111,825.00 225225 5 $178,920.00 360360 8 $111,825.00 225225 5 $12,300.00 24775 0.55 $27,061.00 54504 1.21 $78,277.00 157657 3.5 $19,681.00 39640 0.88 $14,760.00 29730 0.66 $116,298.00 234234 5.2 $0.00 0 $178,920.00 360360 8 $0.00 0 0 $2,236,497.00 2551497 100 $223,649.70 $2,460,146.70 2 City of Aspen Received 8/15/17 Building Department