Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.328 W Main St.0167.2017.ARBK
ESTIMATE Proposal Date:6/2/2016 Proposal #:1692 Bill To: 328 MAIN Job Address: Job Name: Safe, quality, clean, quick and courteous. Phone: (970) 274-0212 E-mail gordon@twomancrew.net Total Description Qty U/M Rate Total Fire escape stairway removal and replacement. MANAGEMENT General Contractor 40 hr 65.00 2,600.00 Project Manager 40 hr 45.00 1,800.00 Aspen Building Permit SUBMITTAL ISSUANCE - Plan Check Fee - Const Mit Fee 50% - Zoning and Res - Aspen Zoning RES - Const Mit Fee 50% - Aspen Building Permit Fee - $25.57 per $1k -County USE Tax Deposit. - 42% of overall fee. - $36.03 Per $1k. - 58% of overall fee. 50 $1K 80.08 4,004.00 Plans copies 97.50 97.50 Subtotal 8,501.50 SCAFFOLDING Master Carpenter 16 hr 52.50 840.00 Carpenter 16 hr 45.00 720.00 Scaffolding Section Per Week 15 13.88 208.20 Scaffolding Plank Per Week 15 9.72 145.80 Subtotal 1,914.00 ENGINEERING Engineer 10 250.00 2,500.00 Subtotal 2,500.00 DEMO Master Carpenter 16 hr 52.50 840.00 Carpenter 16 hr 45.00 720.00 Landfill construction debris 3 ton 85.15 255.45 Subtotal 1,815.45 CONCRETE Concrete pier 10"sono, 18" foot, (2)#460 rebar, EPB66, 42" depth, 6" above grade. Include excavation. Exclude 20" or greater rocks, to be T&M. 6 ea 390.00 2,340.00 Subtotal 2,340.00 Page 1 City of Aspen Received 07/28/17 Building Department ESTIMATE Proposal Date:6/2/2016 Proposal #:1692 Bill To: 328 MAIN Job Address: Job Name: Safe, quality, clean, quick and courteous. Phone: (970) 274-0212 E-mail gordon@twomancrew.net Total Description Qty U/M Rate Total FRAME Master Carpenter 20 hr 52.50 1,050.00 Carpenter 20 hr 45.00 900.00 Fir 2x4 Lf bracing. 60 Lf 0.73 43.80 Fir 6x6 Lf 72 7.28 524.16 Deck Trex 5/4 x 6 Fir structure with 50% plus modifier 2nd & third floor 111 sqft 107.25 11,904.75 Fir 2x12 Lf 48 Lf 2.80 134.40 RAIL Master Carpenter 40 hr 52.50 2,100.00 Carpenter 40 hr 45.00 1,800.00 Fir 4x4 Lf 48 Lf 4.20333 201.76 Cedar 2x8 Lf R/S 48 5.00 240.00 Cedar 2x4 Lf R/S 96 Lf 2.40 230.40 2x2-8' Spruce 45 ea 3.97 178.65 Machine Bolt 1/2" x 6-1/2" Box 25 1 ea 31.23 31.23 Washers and nuts 19.50 19.50 Screws Exterior 2-1/2" Box 350 1 ea 38.45 38.45 Subtotal 19,397.10 PAINT Painters 60 hr 45.50 2,730.00 A 100 Exterior Paint Satin 3 gl 55.58 166.74 Paint Sundries 65.00 65.00 Subtotal 2,961.74 Subtotal 39,429.79 Contingency 10% - There are many unknowns related to remodeling & most of these unknowns impact the schedule. - Variables include weather, price changes, shipping, taxes, clerical errors. Unseen behind wall / floor - electric, drain, supply, vent, sprinkler system, alarm, phone, cable, cat5, radiant heat, sound board or structural, rot, insects, mold, gypcrete, unlevel /plumb conditions, etc. 10.00%3,942.98 Page 2 $43,372.77 City of Aspen Received 07/28/17 Building Department