HomeMy WebLinkAboutFile Documents.355 Silverlode Dr.0092.2019 (4).ARBKAJAX ROOFING COMPANY
CONSTRUCTION MANAGEMENT PLAN
355 Silverlode
ASPEN, CO
1. General
1.1 Total Project Demo – 3,081 SF of roofing materials
1.2 Table of Contents
2. Project Introduction
2.1 No soil disturbance is anticipated
2.2 See Attachment for Project Vicinity Map
2.3 Description of work
Includes removal of existing wood roof. Install new roof.
3. Project Documentation
3.1 Permits
Roof Permit Only
3.2 Project Notification
A letter/email of explanation of the project will be given to all neighbors
including two phone numbers if issues arise by the HOA Manager.
3.3 Project Sign
Project will last less than 30 days so no sign is required
3.4 Contact List
Roof Contractor – Ajax Roofing Company
Jay Salle 618-3169
Lyle Cox 970-901-1762
4. Project Implementation
4.1 Dates of Construction
Start approximately May 15th
4.2 Hours of Construction
8am – 5pm Monday through Friday
9am – 5pm Saturday (although no Saturday work is anticipated)
4.3 Construction Schedule
Removal of Existing Roof:10 working day
New Roof:10 working day
4.4 Site Fencing
Site fencing around the area on our plan for materials disposal and toilet.
4.5 Site Map for Trees – N/A
4.6 Park Issues – N/A
04/29/2019
AJAX ROOFING COMPANY
5. Project Management
5.1 Parking Request w/ Site Plan
We will park in paid parking on the street and pay for it with the parking
dept.
5.2 Emergency Vehicle Access
5.3 Construction Parking Details
5.4 Staging Area
See plan. Materials will be on the roof. Old materials will be in storage
area on plan and taken to the dump daily
5.5 Construction Trailer, Materials Storage, Waste Management
Temp toilet in fenced area.
6. Traffic Control – Not Applicable
7. Pedestrian Protection – Not Applicable
8. Sediment and Erosion Control – Not Applicable
9. Fugitive Dust Control – Not Applicable
10. Emissions - Agreed
11.Noise Suppression
The only tools we will be using are hand tools. No electric or gas tools will be
used.
04/29/2019