Loading...
HomeMy WebLinkAboutFile Documents.387 Silverlode Dr.0035.2019 (10).ARBKZoning Comments 1_387 Silverlode Dr_0035.2019.ARBK 3-19-2019 Page Label: A0.3 OOF DEMOLITION CALCULATIONS Page Index: 3 Author: sophiev File Name: 387 Architecturals.pdf Please check that table and diagrams correspond. An example of the numbers being off would be Wall B. 387 Architecturals.pdf (4) Page Label: A1.0 EXISTING / DEMO LOWER LEVEL FLOOR PLAN Page Index: 4 Author: sophiev File Name: 387 Architecturals.pdf Is this retaining wall still being removed? Page Label: A1.1 EXISTING / DEMO MAIN LEVEL FLOOR PLAN Page Index: 5 Author: sophiev File Name: 387 Architecturals.pdf Please lighten this shading. The writing is illegible. Page Label: A1.4 MAIN LEVEL REFLECTED CEILING PLAN Page Index: 8 Author: sophiev File Name: 387 Architecturals.pdf Will any exterior lighting be added or changed? If so, please provide exterior lighting plan and cutsheets.If not, please provide note stating that no exterior lighting is in the scope of this permit. Page Label: 1 Page Index: 1 Author: sophiev File Name: 387 Silverlode Drive Approved RDS Checklist.pdf Please provide stamped RDS plans that correspond with this checklist. 387 Silverlode Drive Approved RDS Checklist.pdf (1) Page Label: 10 Page Index: 9 Author: sophiev File Name: City of Aspen Building Permit Application_201901071056513870_REVISED BG.pdf Please have contractor sign Zoning Compliance Verification Policy. City of Aspen Building Permit Application_201901071056513870_REVISED BG.pdf (1) EXISTING WALL TO REMAIN WALL AREA TO BE REMOVED AREA REDUCED FOR FENESTRATION A B I M 6.8 SF 12.6 SF 55.4 SF Demolition CalculationsCity of Aspen Zoning Submission Wall Demolition Wall LabelABCDEFGHIJKLM Wall Surface Area Total (SF)Area Reduced for Fenstration (SF)Area used for Demo Calc (SF)Wall Surface Area to be Removed (SF) Demolition TotalsRoof + Wall Area Used for Demo Calcs (SF)Surface Area to be Removed (SF)Total 2,886.5 + 3,043122 + 1 5,929.50123.002.07% Individual Wall Area(SF)460.0059.00784.00227.5028.5063.5028.50695.00965.0054.0057.00799.5055.50 4,277.00 1,234.003,043.00 122.00 Area Reduced for Fenestration(SF)69.0023.50327.50136.00 32.00 347.50149.0023.5023.5090.0012.50 Area of Wall to be Removed(SF) 3.5015.50 103.00 Please check thattable and diagramscorrespond. Anexample of thenumbers being offwould be Wall B. WINDOW REMOVE EXISTING RETAINING WALL. REF. A0.1 FOR LANDSCAPE PLAN Is this retaining wall still being removed? DN3R @ 6" DN 113'-0" 111'-0" 114'-6" PREP EXISTING BUILT-INFOR NEW FINISH. HALL#200 DINING#203 KITCHEN#204 M. BEDROOM#206 LIVING ROOM#205 M. DECK#207 REMOVE DECKASSEMBLYTO SHEATHING DEMO WALL ABOVEFOR NEW CLERESTORYWINDOWSM. CLST.#210 M. BATH#209 HALL#208 OUTDOORLIVING#210 INSPECT/SCOPEINTERNAL DRAIN REMOVE EXISTINGGAS APPLIANCE,MINIMIZE DEMOEXTENTS, EXSTGFINISHES TO REMAINEXCEPT AT MANTLE 2 2 2 2 Please lighten thisshading. The writingis illegible. Will any exterior lighting be added or changed? If so, please provide exterior lighting plan and cutsheets.If not, please provide note stating that no exterior lighting is in the scope of this permit. Please provide stamped RDS plans that correspond with this checklist. CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) ______________________________ understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: ___________________________________________ Date: ________________________________________________________ August 2017 Please havecontractor signZoning ComplianceVerification Policy.