Loading...
HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0153.2017 (39).ARBKDRAWING ISSUELOT 7 THUNDERBOWL Aspen, COSHEET No.CONCEPTUAL DESIGNDRAWN BY:PROJECT No: 1113MTEPERMIT SET418 East Cooper AveSuite 206Aspen, CO 81611 970-925-3444 970-920-2186All ideas, designs, arrangements and plansindicated or represented by this drawing areTELFAX2.3SITE PLAN (PROPOSED)(1" = 10'-0")2/10/17owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC.X:\Projects\Aspen\'16 Projects\1605 - Lot 7 Thunderbowl\DWG\1605 - LOT 7 THUNDERBOWL - CURRENT PLANS.pln | 9:27 AM | Monday, April 24, 20173/06/17SHEET No.FR O N T SE T B A C K DN DW DW STRETCH BREAKFAST NOOK 12" STRETCH FIRE PLACE ELEVATION 12" SPEED OVEN ABOVE 30" OVEN COFFEE UNIT OR STEAM OVEN ABOVE 30" OVEN A 18" PANTRY UNIT 18" WINE UNIT C 30" REF DRWS ? PREP SINK PLOTTER/ PRINTER B DSTRETCHBREAKFAST NOOK12"BUTLERS PANTRY CHILDRENS TOYS/ TRANSITIONAL EXPANDED PANTRY MEDIUM TALL OPEN STORAGE SERVING UNIT AREA ELEVATOR POWDER ROOM PANTRY SUGGESTED CLOUD ABOVE ISLAND W/ PERIMETER LIGHT DETAIL & DOWN LIGHTING GH JKI CL BREAKFAST NOOK/ DOOR OPENING/ SHUTTER UNIT IN PANTRY FIREPLACE BUILDING ENVELOPELOT 8 LOT 6 EDGE OF PAVEMENTBUILDI N G ENVEL O P E 10' ACTIVITY EASEMENT10' ACTIVITY EASEMENT PROPERY BOUNDARYPROPERY BOUNDARY5' ACTIVITY ENVELOPEPROPERY BOUNDARYBUILDING ENVELOPEUT I L I T Y EA S EM EN T TELEPHONE RISERCABLE RISERELECTRIC TRANSFORMER 8234 8236 8238 8240 8242 8244 8246 8248 8250 8252 8254 8256 8258 8260 8262 THUNDERBOWL LANE5' ACTIVITY ENVELOPEBUILDING ENVELOPELOT 7 0.693 ACRES PRIVATE SKI EASEM E N T NFOUND NO. 5 REBAR WITHYELLOW PLASTIC CAP MARKEDL.S. #20133ELEV = 8,232.43'FIRE HYDRANT POOL FIREPIT OUTDOOR LOUNGE DN BBQ DN DN DN SPA BENCH WATER FEATURE SITE 8,244' = ARCH 100'-0"Appendix E: Site Plan ET B 66 Track Pad30' x 14' 8 8254 8256 8258 8 IVITY NTEASEMENT823436IVIT836 Excavation Spoil PileParkingNTNT Parallel Parking alongThunderbowl DriveSilt FenceEDGE OF TPAVEMENTOWBOWParallel Parking alongThunderbowl DriveSilt FenceSilt FenceParking3' Project FenceSilt Fence 82 082508' x 30' Job SiteOffice(2) Temp ToiletsTypical - Allow for 15'-0" of clearancearound the foundation from any stockpiledsoil for equipment and access3' Project FenceOn SiteTowerCraneDumpster,Recycling, andBear ProofContainersConcreteWashoutSilt FenceBUILDING ENVELOPEYTEASEMENT8240 8242 BUIY8238 Material LaydownMaterial LaydownNOTE - Boom from TowerCrane not to exceed propertyline at any locationExcavation Spoil PileTemp PowerNOTE - All site walls will be excavatedand poured after the house foundationhas been backfilledNOTE - Allow for 15'-0" ofclearance around the foundationfrom any stockpiled soil forequipment and access 8248ConcreteWashout8 Silt Fence1/16/18