Loading...
HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0153.2017.ARBK The permit processing time is stopped on this review and will not begin again until all issues from all review agencies are addressed and the corrections are approved for resubmittal. At that time, your resubmittal will re-placed in the queue with other permits being processed. Sent via e-mail Date: 10.25.2017 To: David Johnston Email: David@djarchitects.com Phone: 970-925-3444 From: Claude Salter, Zoning Officer, City of Aspen Phone 970/429-2752, Fax 970/920-5439, Claude.Salter@cityofaspen.com Permit Coordinators: Ben Chase 970-429-2763 Project Name: Address: 395 Thunderbowl Lane Permit Number: 0153.2017.ARBK Owner’s Name: ASPEN EXTREME LLC Zone District: R-30/PD These design documents have been reviewed for conformance with the Land Use Code as adopted and amended by the City of Aspen. All referenced code sections are from the City of Aspen Land Use Code unless noted otherwise. You can find a copy of all adopted codes on our website. The attached comments must be addressed. Please revise and redraw the plans to clearly respond to the attached comments. Plan corrections cannot be made on the blueprints (i.e., red-lined). All changes must be made to the originals prior to making prints. Revised drawings must clearly show code compliance. In addition, please resubmit this comment letter with your written response to each comment. Your response should indicate which detail or specification page shows the required information. Responses such as “will comply with code” are not adequate. Finally, please provide both a physical copy and a digital file of your resubmission. The comment letter should be a Word document. If you have any questions specifically regarding the comments below, please feel free to contact me directly. If you have questions regarding the status of other review agencies' comments, the status of your permit in the queue, or general permitting questions, please contact your Permit Coordinator. (See above for phone numbers.) IMPORTANT NOTE: Zoning plan check is only one part of the often complex process by which projects are reviewed for approval. These parts are interrelated and are sometimes conflicting. Because we are issuing these first review round comments prior to the time that all review agencies have completed their work, you are receiving incomplete comments from the City as a whole. It is ultimately the applicant’s responsibility to respond to the requirements of ALL review agencies. If you choose to begin 04/24/2018 The permit processing time is stopped on this review and will not begin again until all issues from all review agencies are addressed and the corrections are approved for resubmittal. At that time, your resubmittal will re-placed in the queue with other permits being processed. updating plans and responding to comments prior to receiving feedback from ALL review agencies, you assume any and all risks associated with needing to adjust, update, modify, or otherwise redo your work. When you have received and addressed ALL items from ALL review agencies, please call 970-920- 5090 to schedule a required appointment for re-submittal with your Permit Coordinator. You will be required to bring a copy of this letter, along with ALL other staff comment letters, with ALL responses and required documentation. If all items listed have not been addressed, the resubmittal will be deemed incomplete, and will not be accepted. ZONING PLAN REVIEW COMMENTS AND CORRECTIONS In General: Please update Z.02 Site Plan RESPONSE: The site plan (Z.02) is up to date and included in the set. For clarity, the planting and hydrozones are shown on sheet Z.02A ZCV policy sheets : • Height sheets: A4.1 – A4.5 elevations, Z.05 Height over Topography • Survey by TSS dated 7/11/2017 and site plan Z.02 • Site verification: Z08 Chart for elements close to envelope, and updated site plan Z.02 04/24/2018