The permit processing time is stopped on this review and will not begin again until all issues from all review agencies
are addressed and the corrections are approved for resubmittal. At that time, your resubmittal will re-placed in the
queue with other permits being processed.
Sent via e-mail
Date: 10.25.2017
To: David Johnston
Email: David@djarchitects.com
Phone: 970-925-3444
From: Claude Salter, Zoning Officer, City of Aspen
Phone 970/429-2752, Fax 970/920-5439, Claude.Salter@cityofaspen.com
Permit Coordinators: Ben Chase
970-429-2763
Project Name:
Address: 395 Thunderbowl Lane
Permit Number: 0153.2017.ARBK
Owner’s Name: ASPEN EXTREME LLC
Zone District: R-30/PD
These design documents have been reviewed for conformance with the Land Use Code as adopted and
amended by the City of Aspen. All referenced code sections are from the City of Aspen Land Use
Code unless noted otherwise. You can find a copy of all adopted codes on our website.
The attached comments must be addressed. Please revise and redraw the plans to clearly respond to the
attached comments. Plan corrections cannot be made on the blueprints (i.e., red-lined). All changes
must be made to the originals prior to making prints. Revised drawings must clearly show code
compliance. In addition, please resubmit this comment letter with your written response to each
comment. Your response should indicate which detail or specification page shows the required
information. Responses such as “will comply with code” are not adequate. Finally, please provide
both a physical copy and a digital file of your resubmission. The comment letter should be a
Word document.
If you have any questions specifically regarding the comments below, please feel free to contact me
directly. If you have questions regarding the status of other review agencies' comments, the status of
your permit in the queue, or general permitting questions, please contact your Permit Coordinator. (See
above for phone numbers.)
IMPORTANT NOTE:
Zoning plan check is only one part of the often complex process by which projects are reviewed for
approval. These parts are interrelated and are sometimes conflicting. Because we are issuing these
first review round comments prior to the time that all review agencies have completed their work,
you are receiving incomplete comments from the City as a whole. It is ultimately the applicant’s
responsibility to respond to the requirements of ALL review agencies. If you choose to begin
04/24/2018
The permit processing time is stopped on this review and will not begin again until all issues from all review agencies
are addressed and the corrections are approved for resubmittal. At that time, your resubmittal will re-placed in the
queue with other permits being processed.
updating plans and responding to comments prior to receiving feedback from ALL review
agencies, you assume any and all risks associated with needing to adjust, update, modify, or
otherwise redo your work.
When you have received and addressed ALL items from ALL review agencies, please call 970-920-
5090 to schedule a required appointment for re-submittal with your Permit Coordinator. You will
be required to bring a copy of this letter, along with ALL other staff comment letters, with ALL
responses and required documentation. If all items listed have not been addressed, the
resubmittal will be deemed incomplete, and will not be accepted.
ZONING PLAN REVIEW COMMENTS AND CORRECTIONS
In General:
Please update Z.02 Site Plan
RESPONSE: The site plan (Z.02) is up to date and included in the set. For clarity, the planting
and hydrozones are shown on sheet Z.02A
ZCV policy sheets :
• Height sheets: A4.1 – A4.5 elevations, Z.05 Height over Topography
• Survey by TSS dated 7/11/2017 and site plan Z.02
• Site verification: Z08 Chart for elements close to envelope, and updated site plan Z.02
04/24/2018