HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0153.2017 (9).ARBK0153-2017-ARBK_BuildingComments_1 Page:1 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Revise fireplace registration form to note which models go where. FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf (35) Page:1 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Perspective A on the cover sheet appears to depict a fire pit and hot tub. Provide a site plan. Provide installation instructions for the fire pit giving required clearances to combustibles and demonstrate compliance by dimensioning your site plan. Provide a cut sheet for your spa demonstrating that it is CEC or APSP-14 listed otherwise include it in your REMP worksheet. Page:13 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:Fire Area Author:nickt Color: Provide a fire area floor plan measuring the fire area of the building. Fire area, as defined by 2015 IBC section 202, is measured to the inside of exterior walls but also includes exterior usable areas that are covered such as your trellises. Page:13 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Coordinate your snowmelt total. A-2.1 shows 4892.84 sqft, building description form shows 4996, REMP worksheet shows 4998.86, mechanical sheets don't show any. Also, you may elect to exempt each 9 sqft snowmelted window well from REMP per Ordinance 40, 2016. David Johnston Architects 119 Spring StSuite 203Aspen, CO 81611(970)925-3444roger@djarchitects.com OWNER STRUCTURAL ENGINEEREvolve Structural DesignSteve R Edmiston, P.E. , S.E.1040 main StCarbondale, CO 81623(206)910-7766 LIGHTING DESIGNER TBD David Johnston ARCHITECT CIVIL ENGINEERWoody Creek Engineering, LLCJosh RiceWoody Creek ,CO 81656 (970) 429-8297 josh@woodycreekengineering.com 033 LBBRK ER VISION ROOM 100 1 PROJECT DIRECTORY CONCRETE STONE FRAME WALL BRICK PLYWOOD BATT INSULATION FINISHED WOOD RIGID INSULATION PERSPECTIVE A Revise fireplace registration form to notewhich models go where. David Johnston Architects 119 Spring StSuite 203Aspen, CO 81611(970)925-3444roger@djarchitects.com OWNER STRUCTURAL ENGINEEREvolve Structural DesignSteve R Edmiston, P.E. , S.E.1040 main StCarbondale, CO 81623(206)910-7766 LIGHTING DESIGNERTBD AUDIO / VISUAL DESIGNERTBDDavid Johnston ARCHITECT Aspen Extreme II, L.L.C. CIVIL ENGINEERWoody Creek Engineering, LLCJosh RiceWoody Creek ,CO 81656(970) 429-8297josh@woodycreekengineering.com 033 LBB GENERAL A-1.1 TITLE SHEET SURVEY CIVIL C100 COVER SHEET C200 BASINS C300 G&D OVERVIEW C301 G&D NORTH C302 G&D SOUTH C400 PIPE PROFILES C500 DETAILS C600 EROSION & SEDIMENT CONTROL C700 UTILITIES C800 EROSION & SEDIMENT CONTROL ZONING Z.01 ZONING SUMMARY Z.02 SITE PLAN – BUILDING FOOTPRINT Z.03 FAR DIAGRAMS AND CALCS Z.04 FAR DIAGRAMS AND CALCS – OVERHANGS Z.05 HEIGHT OVER TOPOGRAPHY ARCHITECTURAL A-2.1 SNOWMELT PLANS A-3.1 CRAWL SPACE PLAN – 3/16” A-3.2 LOWER LEVEL PLAN – 3/16” A-3.3 MAIN LEVEL PLAN – 3/16” A-3.4 UPPER LEVEL PLAN – 3/16” A-3.5 ROOF PLAN – 3/16” A-3.6 LOWER LEVEL RCP – 3/16” A-3.7 MAIN LEVEL RCP – 3/16” A-3.8 UPPER LEVEL RCP – 3/16” A-3.9 EXTERIOR LIGHTING SPEC SHEETS A-4.1 EXTERIOR ELEVATION - NORTH A-4.2 EXTERIOR ELEVATION – EAST A-4.3 EXTERIOR ELEVATION – SOUTH A-4.4 EXTERIOR ELEVATION – WEST A-4.5 EXTERIOR ELEVATIONS – MISCELLANEOUS A-4.6 EXTERIOR ELEVATIONS - MISCELLANEOUS A-5.1 BUILDING SECTIONS A-5.2 BUILDING SECTIONS A-5.3 BUILDING SECTIONS A-6.1 ½” WALL SECTIONS A-6.2 ½” WALL SECTIONS A-6.3 ½” WALL SECTIONS A-6.4 ½” WALL SECTIONS A-6.5 ½” PLANS AND SECTIONS – STAIR ‘A’ A-6.6 ½” PLANS AND SECTIONS – STAIR ‘B’ A-7.1 FLOOR ASSEMBLIES A-7.2 FLOOR DETAILS A-7.3 WALL ASSEMBLIES A-7.4 WALL ASSEMBLIES & DETAILS A-7.5 ROOF ASSEMBLIES AND DETAILS A-7.6 ROOF DETAILS A-7.7 ROOF DETAILS A-7.8 WINDOW DETAILS A-7.9 DOOR DETAILS A-10.1 DOOR SCHEDULE A-10.2 DOOR LEGEND A-10.3 WINDOW SCHEDULE A-10.4 WINDOW LEGEND IRRIGATION IR-1.0 IRRIGATION LEGEND & NOTES IR-2.0 IRRIGATION PLAN IR-2.1 IRRIGATION PLAN - ROOFTOP IR-3.0 IRRIGATION DETAILS STRUCTURAL S0.01 GENERAL NOTES & TYP DETAILS S1.01 FOUNDATION PLAN S1.02 CRAWL SPACE FRAMING PLAN S1.11 MAIN FLOOR FRAMING PLAN S1.21 LOW ROOF & UPPER FLOOR FRAMING PLAN S1.31 UPPER ROOF FRAMING PLAN S5.01 FOUNDATION DETAILS S5.02 FRAMING & FOUNDATION DETAILS S5.03 FRAMING DETAILS S5.04 ROOF FRAMING DETAILS MECHANICAL M-001 MECHANICAL LEGEND SPEC’S & SEQUENCE M-110 CRAWL SPACE HVAC PLAN M-111 BASEMENT HVAC PLAN M-112 1ST FLOOR HVAC PLAN M-113 2ND FLOOR HVAC PLAN M-120 BASEMENT MECHANICAL PIPING PLAN M-121 1ST FLOOR MECHANICAL PIPING PLAN M-122 2ND FLOOR MECHANINCAL PIPING PLAN M-122 2ND FLOOR MECHANINCAL PIPING PLAN M-601 MECHANICAL SCHEDULES ELECTRICAL E-001 ELECTRICAL LEGEND SPEC’S & SEQUENCE E-501 ELECTRICAL ONE LINE & LOAD CALCS E-601 ELECTRICAL PANEL SCHEDULES LOCATION ......................................................................................... 395 Thunderbowl Ln, Aspen Highlands, CO SUBDIVISION ................................................................................ Aspen Highlands Village PUD Block: A Lot: 7 OCCUPANCY GROUP ............................................................................................................................................. R-30 CONSTRUCTION .............................................................................................................................................. Type V-B EXISTING FAR ................................................................................................................................. Vacant Lot = 0 SF ADDITIONAL FAR .................................................................................................................... TBD S.F. ADDITIONAL LAND USE ZONE ....................................................................................................................................................... TBD LOT SIZE 69 Acres ROOM 100 1 T. O. RIDGE BEAM123'-6 1/2" PROJECT INFORMATION PROJECT INDEX PROJECT DIRECTORY TION OD TION LOT 7 THUNDERBOW PERSPECTIVE A PERSPECTIVE B 8 Perspective A on thecover sheet appears todepict a fire pit and hottub. Provide a siteplan. Provideinstallation instructionsfor the fire pit givingrequired clearances tocombustibles anddemonstratecompliance bydimensioning your siteplan. Provide a cutsheet for your spademonstrating that it isCEC or APSP-14 listedotherwise include it inyour REMP worksheet. SCALE: 1/16"3 UPPE Provide a fire area floor planmeasuring the fire area of thebuilding. Fire area, as defined by2015 IBC section 202, ismeasured to the inside of exteriorwalls but also includes exteriorusable areas that are coveredsuch as your trellises. DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COSHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS A-2.1 SNOWMELT PLANS 07/13/201705/18/2017 SHEET No. DNDN DN DNDN DN BUILDING FOOTPRINT EXTERIOR PATIO ENTRY AUTOCOURT EXTERIOR PATIO 1,550.27 sq ft 2,809.01 sq ft 126.91 sq ft SCALE: 1/16" = 1'-0"2 MAIN LEVEL AND SITE PLAN - SNOWMELT DIAGRAMSCALE: 1/16" = 1'-0"4 ROOF PLAN - SNOWMELT DIAGRAM SNOWMELT CALCULATION: 2809.01+ 126.91 + 1550.27 + 379.65 + 9 + 9 + 9TOTAL = 4,892.84 SF Coordinate your snowmelt total. A-2.1shows 4892.84 sqft, building descriptionform shows 4996, REMP worksheet shows4998.86, mechanical sheets don't showany. Also, you may elect to exempt each 9sqft snowmelted window well from REMPper Ordinance 40, 2016. Response: See attached revised form Response: Title Sheet has been revised with perspective that does not show fire pit hot tub ...etc. Response: SHEET 'Z.06 - FIRE AREA CALCULATIONS' HAS BEEN ADDED TO SET Response: SNOWMELT HAS BEEN REMOVED FROM PERMIT APPLICATION. SHEET A2.1 HAS BEEN ELIMINATED FROM SET. 1/16/18 Page:15 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: There appears to be a separate dwelling unit in the basement. It has its own entrance, mechanical room, kitchen and dining. As a separate dwelling, it must be separated from the main dwelling by 1 hour fire and STC/IIC 45 rated fire partition walls and horizontal assemblies. Doors between units must be fire rated. The fire partition walls must extend to the underside of the floor sheathing above with no framing interruptions (alternatively, the basement ceiling must be 1 hour rated throughout the entire building). Each unit must have its own electric panel and mechanical systems or have constant access to its panel and mechanical systems. Provide sections, details, listed assemblies, and revised structural and MEP plans to demonstrate compliance. (2015 IRC R302.3) Page:15 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Provide access to the under floor space north of the basement guest suite bedroom. (2015 IRC R408.4) Page:15 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Revise A3.2 to show all laundry equipment (washers and dryers) in the laundry room. If there is more than one dryer or the total exhaust exceeds 200cfm, you will need to provide makeup air on the mechanical plans per 2015 IMC 504.6. Page:16 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Provide a site plan showing all exterior hardscaping, stairs, railings, hot tubs, fire pits, etc. Provide a foundation plan for the patio areas; they must be protected from frost if they are attached to the building. DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COSHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS 119 S Spring StSuite 203Aspen, CO 81611 970-925-3444 All ideas, designs, arrangements and plansindicated or represented by this drawing are A-3.2 LOWER LEVEL PLAN -3/16" owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC. X:\Project s \ A s p e n \ ' 1 6 P r o j e c t s \ 1 6 0 5 - L o t 7 T h u n d e r b o w l \ D W G \ 1 6 0 5 - LOT 7 TH U N D E R B O W L - C U R R E N T P L A N S - C U R R E N T T O P O . p l n | 8 :30 PM | W e d n e s d a y , J u l y 1 2 , 2 0 1 7 07/13/201705/18/2017 SHEET No. 02 01 03 005 004 008 022 007 020 013 021 016 023 024 006 019 018 002 011 010 009 017 015 014 003 2A-6.5 11'-101/4" 14'-4" 1 6 ' - 5 " 8 ' - 0 1/2" 7'-8" 1 6 ' - 3 " 3 ' - 1 1 1/4" 4'-11/4" 56'-5" 26'-2" 86'-91/2" 86'-91/2" 86'-91/2" 91'-11" 86'-91/2" 86'-91/2" 89'-31/2" 89'-31/2" 89'-31/2" TEMPERED GLASSSHOWER ENCLOSURE TEMPERED GLASSSHOWER ENCLOSURE TEMPERED GLASSSHOWER ENCLOSURE LADDER LADDER LADDER W14 W11 W11 W11 W11 W11 W11 W11 W11 W11 W11 W14 W14 W14 W14 W14 W14 W11 W11 W11 W11 W11W11 W11 W11 W11 W11 W11 W11 W11 W11 W4 W4 W7 W4 W7W7 W7 W7 W7 W7 W4 W7 W7W4 W2 W2 W7W7 W7 W7W4W7 W7W4 W4 W4 W7 W7 W7 W4W4 W4 W7 W4 W4 W7 W7 W2 W7 W4 W7 W7 W7W7 W7 W7 W7 W7 W7W7W7 W4 W7 W7 W7W7 W4 W4 36" X 36" MIN CLR 36" X 36" MIN CLR 36" X 36" MIN CLR +/-150BOTTLES +/-150BOTTLES +/-150BOTTLES+/-150BOTTLES +/-150BOTTLES+/-150BOTTLES SD CD CD SD FD FD 1A-4.2 1A-4.3 1A-4.4 3A-4.54A-4.5 6A-4.5 1A-5.2 2A-5.1 1A-5.1 2A-5.2 2A-5.2 1A-5.3 1A-5.3 025 012 44 33 22 11 55 66 99 1010 88 77 1A-6.6 LAUNDRY CHUTE GLASS CEILINGABOVE36" HT GLASSGUARDRAIL - CONT.34" HT HANDRAILW/ RETURN TO FLOOR -TYP MONTIGO P52DFGAS FIREPLACE 24" X 24" CRAWLSPACE ACCES HATCH 48" HT X 36" W CRAWLSPACE ACCESS HATCH 24" X 24" CRAWLSPACE ACCES HATCHELECTRICAL PANELS W11 W11 W4 W4 W8 W8 W8 W7 DEN010 BAR011 BATHROOMRM 007A GUEST SUITEBEDROOMRM 007 LAUNDRYRM 006 LIVING RM015 HALLWAY013 BEDROOMRM 016 LIGHTWELL MECHANICALRMRM 002 FP BATHROOM016 AWINESTORAGERM 008 BATHROOM012 TUB SHOWER016 C TLT016 B ELEV CLOSETRM006A LIGHT WELL LIGHT WELL CRAWLSPACE/STORAGE RM 001 STORAGE /MECHANICAL ROOMRM 017 SHELVES SHELVES SHELVES CLOSET016 D DININGRM 015A EXERCISEROOM014 BUILT-INSBUILT-INS KITCHENETTERM 015B UP BENCH PANELSRM 003 LINEN CLOSETRM 004 UP BENCHHALLWAYRM 005 CLSTRM007B STAIRNICHERM 009 STAIR B EQUIPMENTSTORAGE014ASTAIR A CARPET CARPET FLR: PORCELAINTILES FLR: WD FLR: WD FLR: PORCELAINTILES FLR: CONCFLR: CONC FLR: CONC FLR: WD FLR: WD FLR: WD FLR: WD FLR: PORCELAINTILES FLR: WD FLR: PORCELAINTILES FLR: CRPT FLR: CRPT FLR: WD FLR: WD FLR: WD FLR: CONC T.O. PLY T.O. PLY T.O. PLY T.O. PLY T.O. PLY 11 RISERS @7.27"10 TREADS @1 1 " 12 RISERS@ 7 . 2 7 " 11 TREADS@ 1 1 " T.O. SLAB T.O. SLAB T.O. SLAB T.O. SLAB NICHE 1A-6.5 1A-6.5 1A-4.52A-4.5 5A-4.5 3'-5" 2'-9" 8'-61/2"2'-6" 22'-11" 7'-10" 21'-61/4"2'-91/4"13'-13/4"19'-21/2"104'-7" 1A-5.2 2A-5.1 1A-5.1 ADEIJKGFCHB ADEIJKGFCHB SCALE: 3/16" = 1'-0"1LOWER LEVEL PLAN - 3/16" SCALE There appears to be a separatedwelling unit in the basement. Ithas its own entrance, mechanicalroom, kitchen and dining. As aseparate dwelling, it must beseparated from the main dwellingby 1 hour fire and STC/IIC 45 ratedfire partition walls and horizontalassemblies. Doors between unitsmust be fire rated. The fire partitionwalls must extend to the undersideof the floor sheathing above withno framing interruptions(alternatively, the basement ceilingmust be 1 hour rated throughoutthe entire building). Each unit musthave its own electric panel andmechanical systems or haveconstant access to its panel andmechanical systems. Providesections, details, listed assemblies,and revised structural and MEPplans to demonstrate compliance.(2015 IRC R302.3) 03 005 004 008 007 013 006 011 010 009 01 003 86'-91/2" 86'-91/2"89'-31/2" TEMPERED GLASSSHOWER ENCLOSURE TEMPERED GLASSSHOWER ENCLOSURE LADDER W14 W11 W11 W11 W11 W11 W11 W11 W11 W11 W11 W11 W4 W4 W7 W4 W7 W7 W7 W7 W7 W7 W4 W7 W7 W4 W7 W7 W7 W7W4W7 W7 W4 W4 W4 W7 W7 W7 W4 W7 W7 36" X 36" MIN CLR +/-150BOTTLES+/-150BOTTLES+/-150BOTTLES+/-150BOTTLES +/-150BOTTLES+/-150BOTTLES CDSD 1A-4.4 3A-4.54A-4.5 1A-5.3 012 4 5 6 9 10 8 7 LAUNDRY CHUTE GLASS CEILINGABOVE36" HT GLASSGUARDRAIL - CONT. 34" HT HANDRAILW/ RETURN TO FLOOR -TYP MONTIGGAS F W11 W8 W8 W8 DEN010 BAR011 BATHROOMRM 007A GUEST SUITEBEDROOMRM 007 LAUNDRYRM 006 LIGHTWELL WINESTORAGERM 008 ELEV CLOSETRM006A SHELVES SHELVES SHELVESBUILT-INS UP LINEN CLOSETRM 004 BENCHHALLWAYRM 005 CLSTRM007B STAIRNICHERM 009 STAIR A CARPET CARPET FLR: PORCELAINTILES FLR: WD FLR: WD FLR: PORCELAINTILES FLR: WD FLR: WD FLR: WD T.O. PLY T.O. PLY 11 RISERS @7.27"10 TREADS @11"T.O. SLAB NICHE 1A-6.5 3'-5" 2'-9" 8'-61/2"2'-6" 22'-11" 7'-10" 21'-61/4" 104'-7" 1A-5.2 2A-5.1 EIJKGFH Provide access to theunder floor spacenorth of the basementguest suite bedroom.(2015 IRC R408.4)\Projects\Aspen\'16 Projects\1605 - Lot 7 Thunderbowl\DWG\1605 - LOT 7 THUNDERBOWL - CURRENT PLANS - CURRENT TOPO.pln | 8:30 PM | Wednesday, July 12, 201703 005 004 008 022 007 020 013 021 016 023 024 006 019 018 002 011 010 009 017 015 014 003 2A-6.5 86'-91/2" 86'-91/2" 86'-91/2" 91'-11" 86'-9 8 89'-31/2" TEMPERED GLASSSHOWER ENCLOSURE TEMPERED GLASSSHOWER ENCLOSURE TEMPERED GLASSSHOWER ENCLOSURE LADDER W14 W11 W11 W11 W11 W11 W11 W11 W11 W11 W11 W11 W11 W11 W11W11 W11 W11 W11 W11 W11 W11 W11 W11 W4 W4 W7 W4 W7 W7 W7 W7 W7 W7 W4 W7 W7W4 W2 W2 W7W7 W7 W7W4W7 W7 W4 W4 W4 W7 W7 W7 W4 W4 W4 W7 W4 W4 W7 W7 W2 W7 W4 W7 W7 W7W7 W7 W7 W7 W7 W7W7W7 W7 W7 W7 W7 W4 W4 36" X 36" MIN CLR +/-15 0 BOTTL E S +/-150 BOTT L E S +/-150BOTTLES+/-150BOTTLES +/-150BOTTLES+/-150BOTTLES SD CD CD SD FD FD 1A-4.3 1A-4.4 3A-4.54A-4.5 6A-4.5 1A-5.2 2A-5.1 1A-5.1 2A-5.2 1A-5.3 025 012 4 3 2 1 5 6 9 10 8 7 LAUNDRY CHUTE GLASS CEILINGABOVE36" HT GLASSGUARDRAIL - CONT.34" HT HANDRAILW/ RETURN TO FLOOR -TYP MONTIGO P52DFGAS FIREPLACE 24" X 24" CRAWLSPACE ACCES HATCH 48" HT X 36" W CRAWLSPACE ACCESS HATCH 24" X 24" CRAWLSPACE ACCES HATCHELECTRICAL PANELS W11 W11 W4 W4 W8 W8 W8 W7 DEN010 BAR011 BATHROOMRM 007A GUEST SUITEBEDROOMRM 007 LAUNDRYRM 006 LIVING RM015 HALLWAY013 BEDRRM LIGHTWELL MECHANICALRMRM 002 FP BATHROOM016 A WINESTORAGERM 008 BATHROOM012 TUB SHOWER016 C TLT016 B ELEV CLOSETRM006A CRAWLSPACE/STORAGE RM 001 STORAGE /MECHANICAL ROOMRM 017 SHELVES SHELVES SHELVE S CLOS016 R EXERCISEROOM014 BUILT-INSBUILT-INS KITCHENRM 0 UP BENCH PANELSRM 003 LINEN CLOSETRM 004 BENCHHALLWAYRM 005 CLSTRM007B STAIRNICHERM 009 EQUIPMENTSTORAGE014ASTAIR A CARPET CARPET FLR: PORCELAINTILES FLR: WD FLR: WD FLR: PORCELAINTILES FLR: CONC FLR: CONC FLR: CONC FLR: WD FLR: WD FLR: WD FLR: WD FLR: PORCELAINTILES FLR: WD FLR: PORCELAINTILES FLR: FLR: C FLR: FLR: WD FLR: CONC T.O. PLY T.O. P T.O. T.O. PLY T.O. PLY 11 RISERS @7.27"10 TREADS @11"T.O. SLAB T.O. SLAB NICHE 1A-6.5 1A-6.5 1A-4.52A-4.5 5A-4.5 3'-5" 2'-9" 8'-61/2"2'-6" 22'-11" 7'-10" 21'-61/4"2'-91/4"13'-13/4"19'-21/2" 104'-7" 1A-5.2 2A-5.1 1A-5.1 DEIJKGF CH B DEIJKGF CH B SCALE: 1 LOW Revise A3.2 to showall laundry equipment(washers and dryers)in the laundry room. Ifthere is more than onedryer or the totalexhaust exceeds200cfm, you will needto provide makeup airon the mechanicalplans per 2015 IMC504.6. 29 28 1521 1622 17 181920 23 127 31 26 252430 100' 100' 1A-4.1 3A-4.54A-4.5 6A-4.5 W1 W3 W1 W6 1A-5.2 2A-5.1 27 128 11 10 09 12 107 108 13 14 126 5A-4.5 FLOATING CABINET TEMPERED GLASSSHOWER ENCLOSUREMONTIGO P38DFGAS FIREPLACE ISOKERNMAGNUM 72"FULL MASONRYFIREPLACEW/ GAS LOG SET W1 W1 W1W3 W6 W3 W1 W2 W2W2 2" TH. X 20" DEEP STONEHEARTH EXTENSION - EDGESTO EXTEND 12" MIN. BEYONDEACH SIDE OF THE F.P.OPENING SITTINGRM 106 FP LIVINGRM 102 OUTDOOR DINING MASTERBATHROOMRM 121A FP FP BARRM103A BREAKFASTNOOKRM 105 STEAMSHOWERRM 121C TUB OUTDOORSHOWER TOWELS / LINENS BENCH BENCH OVERHANG ABOVE (SHOWN DASHED)OVERHANG ABOVE (SHOWN DASHED)OVERHANG ABOVE (SHOWN DASHED)T.O. PLYWD FLR: WD FLR: WD FLR: STONE FLR: PORCELAIN TILE1/8"/FT MIN1/8"/FT MINELEC RANGE REFDRAWERS WALL PREPSINK COFFEEUNIT PANTRYUNIT DININGRM 103 PATIO DN EXTERIOR PATIO DN 3'-2" 2'-9" 8'-6 1/2" 2'-6 3/8" 22'-10 5/8" 7'-10" 21'-6 1/8" 2'-9 1/4" 13'-1 5/8" DEIJKGF CH B Provide a siteplan showing allexteriorhardscaping,stairs, railings,hot tubs, fire pits,etc. Provide afoundation planfor the patioareas; they mustbe protected fromfrost if they areattached to thebuilding. Response: THE AREA THAT'S REFERENCE IS NOT A SEPARATE DWELLING UNIT. IT IS A PLAYROOM WITH A WET BAR. THE WET BAR DOES NOT HAVE A COOKING APPLIANCE NOR DOES IT HAVE ANY PROVISIONS FOR ONE TO BE ADDED Response: THIS AREA HAS BEEN REVISED TO A FULL HEIGHT CLOSET WITH AN 8'-0 HT DOOR Response: THE LAUNDRY ROOM HAS BEEN REVISED TO SHOW 2 DRYERS AND 2 WASHING MACHINES. THE MECHANICAL PLANS HAVE BEEN UPDATED TO SHOW MAKE UP AIR Response: THERE ARE NO HOT TUBS OR FIRE PITS PROPOSED IN THIS PERMIT APPLICATION. THE EXTERIOR STAIRS DO NOT REQUIRE RAILS BECAUSE THEY'RE LESS THAN 30" HEIGHT. THE FOUNDATION PLAN HAS BEEN UPDATED TO SHOW FOOTING AT LANDSCAPE ELEMENTS SEE SHEET: A3.2 SEE SHEET: A3.2 SEE SHEET: A3.2 AND MECHANICAL SET SEE SHEET: S1.01 1/16/18 Page:16 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:Exterior door landings and thresholds Author:nickt Color: At all exterior doors, including upper level decks, provide the elevation of the landing on each side of the door and the height of the threshold above the landings (this can be spot elevations and/or details). Doors may not swing over a greater than 1 1/2" threshold. Distance from exterior landing to top of threshold may be a max of 7 3/4" if door does not swing over the step. (2015 IRC R311.3) Page:16 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Provide dimensioned enlarged plan and section details of the living room Isokern fireplace demonstrating compliance with the manufacturer's instructions for clearance to combustibles (1.5" to framing, 3" to insulation) and support of fireplace and hearth extension completely by non-combustible materials. Page:16 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Door 110 from the master closet to the study appears to be blocked by built in cabinets. Page:17 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Provide an emergency escape and rescue opening from bedroom 204 complying with 2015 IRC R310. Page:18 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: A-3.5 shows 12 PV panels at 30kW total sloped at 45 degrees. REMP worksheet shows 28.8kW total (dropped down to 25.6 by inverters) sloped at 35 degrees. Coordinate and provide cutsheets of panels and inverters to verify the ratings. DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COSHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS 119 S Spring StSuite 203Aspen, CO 81611 970-925-3444 All ideas, designs, arrangements and plansindicated or represented by this drawing are A-3.3 MAIN LEVEL PLAN - 3/16" owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC.X:\Projects\Aspen\'16 Projects\1605 - Lot 7 Thunderbowl\DWG\1605 - LOT 7 THUNDERBOWL - CURRENT PLANS - CURRENT TOPO.pln | 8:30 PM | Wednesday, July 12, 201707/13/201705/18/2017 SHEET No. 29 28 124 PLOTTER/ PRINTER I 152116221718192023127 31 45 46 47 26252430 32 50 49 48 11'-10 1/8" 1 4 ' - 3 7 / 8 " 1 6 ' - 5 " 8 ' - 1 / 2 " 7 ' - 8 " 6 ' - 4 " 9 ' - 1 1 " 3 ' - 1 1 1 / 4 " 4 ' - 1 1/4" 100'100' 100' 99'-6" 100' 100' 100' 100' 100' 1A-4.1 1A-4.2 1A-4.3 1A-4.4 3A-4.54A-4.5 6A-4.5 W1 W3 W1 W1 W1 W1 W6 W1 W8 W16 W16 CDSD 1A-5.2 1A-5.2 2A-5.1 2A-5.1 1A-5.1 1A-5.1 2A-5.2 2A-5.2 1A-5.3 1A-5.3 373635 27 128 33 34129 08 111009 06050407125 54A 54B 54C 5312 110 116115 117 109 102 107 112 104 106 118 105 108 104103 111 39 44123 8788 1314126 4 3 2 1 5 6 9 10 8 7 RF38 122 120 121 8584 3A-6.5 2A-6.6 1A-6.5 1A-6.5 1A-4.52A-4.5 5A-4.5 LAUNDRY CHUTE FLOATING CABINETTEMPERED GLASSSHOWER ENCLOSURE 36" HT GLASS GUARDRAIL-CONT.34" HT HANDRAIL W/ RETURN -TYP MONTIGO P38DFGAS FIREPLACE ISOKERNMAGNUM 72"FULL MASONRYFIREPLACEW/ GAS LOG SET MONTIGO H38CRGAS CORNERFIREPLACE TRELLIS ABOVE(SHOWN DASHED) TRELLIS ABOVE(SHOWN DASHED) W3 W1 W3 W3 W1 W3 W3 W3 W3 W3 W3 W3 W1 W3 W6 W3 W3 W3 W1 W1 W1W3 W6 W3 W1 W7 W7 W7W7W7 W7 W7 W7 W7 W7 W7 W7 W7 W7 W7 W3 W8 W8W3 W2 W2W2 W2W2 W2W2 W3 W3 W7W7W7 W7 W7 W7 W7 W7 W7W82" TH. X 20" DEEP STONEHEARTH EXTENSION - EDGESTO EXTEND 12" MIN. BEYONDEACH SIDE OF THE F.P.OPENINGSITTINGRM 106 PANTRYRM 107 POWDERRM 109 MUDROOMRM 112 HALLWAYRM 110 STAIR A FP LIVINGRM 102 BATHROOMRM 120CCLOSETRM 120A MASTERCLOSETRM 121D MASTER FOYERRM 121E MASTERBEDROOMRM 121 OUTDOOR DINING MASTER PATIO GARAGERM 113 MASTERBATHROOMRM 121A AUTO COURT FP UPDN FP BARRM103A BREAKFASTNOOKRM 105 KITCHENRM 104 STEAMSHOWERRM 121C TUB COVERED ENTRY OUTDOORSHOWER KID'S TOYSTORAGE COATSRM 112 SKI PATIO STUDYRM 121E ELEVATOR ENTRYRM 101 OFFICERM 120 SHOES / BAGS TOWELS / LINENS W / D(ELECTROLUX- 15 MINCYCLE) COUNTER/STORAGE BENCH/STORAGE COUNTER/STORAGE BENCH BENCH COATSRM 111A (SOUND PROOF ROOM) GLASS FLOOR FINISH TOWELS /LINENSPREP AREARM 113B STORAGE/ BUILT-INSRM 113A TABLE DN ENTRY NICHERM 111 CLOSETRM 120B TOILETRM 121B STAIR B BUTLERSPANTRY OVERHANG ABOVE (SHOWN DASHED) OVERHANG ABOVE (SHOWN DA S H E D) OVERHANG ABO V E (SHOWN DASHED)OVERHANG ABO V E (SHOWN DASHED) OVERHANG ABOVE (SHOWN DASHED)T.O. PLYWD FLR: WD FLR: WD FLR: STONEFLR: STONE FLR: STONEFLR: STONE FLR: STONE FLR: CONC FLR: END GRAIN WD FLR: PORCELAIN TILE FLR: CARPET FLR: CARPET FLR: CARPET FLR: CARPET FLR: CARPET T.O. PLYWD T.O. PLYWD T.O. SLAB T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD 11RISERS @7 . 2 7 " 10TREADS @ 1 1 " 11RISERS @7. 2 7 " 10TREADS @1 1 " 11RISERS @ 7 . 2 7 "10TREADS @11"10 RISERS @7.27"9 TREADS @11" 12 RISERS @7 . 2 7 " 11 TREADS @ 1 1 "OVERHANG ABOVE (SHOWN DASHED) OVERHANG ABOVE (SHOWN DASHED)OVERHANG ABOVE (SHOWN DASHED) 1/8"/FT MIN1/8"/FT MIN 1/8"/FT MIN1/8"/FT MIN1/8"/FT MIN SINK ELEC RANGEREFDRAWERS REF FREEZER WALLOVENPREPSINKWINEUNIT COFFEEUNITPANTRYUNIT DWDW DININGRM 103 PATIO DNDN EXTERIOR PATIO DN 3'-2" 2'-9" 8'-6 1/2" 2'-6 3/8" 22'-10 5/8" 7'-10" 21'-6 1/8" 2'-9 1/4" 13'-1 5/8" 19'-2 1/2"ADEIJKGFCHB SCALE: 3/16" = 1'-0"1 MAIN LEVEL PLAN - 3/16" SCALE At all exterior doors,including upper leveldecks, provide theelevation of the landingon each side of thedoor and the height ofthe threshold abovethe landings (this canbe spot elevationsand/or details). Doorsmay not swing over agreater than 1 1/2"threshold. Distancefrom exterior landing totop of threshold maybe a max of 7 3/4" ifdoor does not swingover the step. (2015IRC R311.3) DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COSHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS 119 S Spring StSuite 203Aspen, CO 81611 970-925-3444 All ideas, designs, arrangements and plansindicated or represented by this drawing are A33 MAIN LEVEL PLAN - 3/16" owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC. 6 Proj e c t s \ 1 6 0 5 - L o t 7 T h u n d e r b o w l \ D W G \ 1 6 0 5 - L O T 7 T H U N D E R B O WL - C U R R E N T P L A N S - C U R R E N T T O P O . p l n | 8 : 3 0 P M | W e d n e s d a y , July 1 2 , 2 0 1 7 07/13/201705/18/2017 SHEET No. 29 28 124 PLOTTER/ PRINTER I 1521162217 181920 23 127 31 45 46 47 26252430 32 50 49 48 11'-10 1/8" 14'-3 7/8" 16'-5" 8'-1/2" 7'-8" 6'-4" 9'-11" 3'-11 1/4" 4'-1 1/4"100' 100' 100' 99'-6" 100' 100' 100' 100' 100' 1A-4.1 1A-4.21A-4.4 3A-4.54A-4.5 6A-4.5 W1 W3 W1 W1 W1 W1 W6 W1 W8 W16 W16 CDSD 1A-5.2 2A-5.1 1A-5.1 2A-5.2 2A-5.2 1A-5.3 1A-5.3 27 128 33 34129 08 111009 06050407125 54A 54B 54C 5312 110 116115 117 109 102 107 112 104 106 118 105 108 104103 111 39 44123 8788 1314 126 4 3 2 1 5 6 9 10 8 7 R F 38 122 120 121 8584 3A-6.5 2A-6.6 1A-6.5 1A-6.5 1A-4.52A-4.5 5A-4.5 LAUNDRY CHUTE FLOATING CABINETTEMPERED GLASSSHOWER ENCLOSURE 36" HT GLASS GUARDRAIL-CONT.34" HT HANDRAIL W/ RETURN -TYP MONTIGO P38DFGAS FIREPLACE ISOKERNMAGNUM 72"FULL MASONRYFIREPLACEW/ GAS LOG SET MONTIGO H38CRGAS CORNERFIREPLACE TRELLIS ABOVE(SHOWN DASHED) TRELLIS ABOVE(SHOWN DASHED) W3 W1 W3 W3 W1 W3 W3 W3 W3 W3 W3 W1 W3 W6 W3 W3 W3 W1 W1 W1W3 W6 W3 W1 W7 W7 W7 W7 W7 W7 W7 W7 W7 W7 W7 W7 W7 W7 W7 W3 W8 W8W3 W2 W2W2 W2W2 W2W2 W3 W3 W7 W7 W7 W7 W7 W7 W7 W7 W7 W8 2" TH. X 20" DEEP STONEHEARTH EXTENSION - EDGESTO EXTEND 12" MIN. BEYONDEACH SIDE OF THE F.P.OPENINGSITTINGRM 106 PANTRYRM 107 POWDERRM 109 MUDROOMRM 112 HALLWAYRM 110 STAIR A FP LIVINGRM 102 BATHROOMRM 120C CLOSETRM 120A MASTERCLOSETRM 121D MASTER FOYERRM 121E MASTERBEDROOMRM 121 OUTDOOR DINING MASTER PATIO GARAGERM 113 MASTERBATHROOMRM 121A AUTO COURT FP UPDN FP BARRM103A BREAKFASTNOOKRM 105 KITCHENRM 104 STEAMSHOWERRM 121C TUB COVERED ENTRY OUTDOORSHOWER KID'S TOYSTORAGE COATSRM 112 SKI PATIO STUDYRM 121E ELEVATOR ENTRYRM 101 OFFICERM 120 SHOES / B A G S TOWELS / LINENS W / D(ELECTROLUX- 15 MINCYCLE)COUNTER/STORAGEBENCH/STORAGECOUNTER/STORAGEBENCH BENCH COATSRM 111A (SOUND PROOF ROOM) GLASS FLOOR FINISH TOWELS /LINEN S PREP AR E A RM 113BSTORAGE / BUILT-INS RM 11 3 A TABLE DNENTRY NICHERM 111 CLOSETRM 120B TOILETRM 121B STAIR B BUTLERSPANTRY OVERHANG ABOVE (SHOWN DASHED) OVERHA N G ABOVE (SHOWN DA S HED)OVERHANG ABOVE (SHOWN DASHED)OVERHANG ABOVE (SHOWN D A S H E D )OVERHANG A B O V E (SHOWN DASHED)T.O. PLYWD FLR: WD FLR: WD FLR: STONE FLR: STONE FLR: STONE FLR: STONE FLR: STONE FLR: CONC FLR: END GRAIN WD FLR: PORCELAIN TILE FLR: CARPET FLR: CARPET FLR: CARPET FLR: CARPET FLR: CARPET T.O. PLYWD T.O. PLYWD T.O. SLAB T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD11RISERS @7.27"10TREADS @11"11RISERS @7.27"10TREADS @11"11RISERS @7.27"10TREADS @11"10 RISERS @7.27"9 TREADS @11"12 RISERS @7.27"11 TREADS @11"OVERHANG ABOVE (SHOWN DASHED)OVERH A N G ABOVE (SHOWN DASHED)OVERHANG ABOVE (SHOWN DASHED)1/8"/FT MIN1/8"/FT MIN 1/8"/F T M I N 1/8"/FT MIN1/8"/FT M I N SINK ELEC RANGE REFDRAWERS REF FREEZER WALLOVEN PREPSINK WINEUNIT COFFEEUNIT PANTRYUNIT DWDW DININGRM 103 PATIO DNDN EXTERIOR PATIO DN 3'-2" 2'-9" 8'-6 1/2" 2'-6 3/8" 22'-10 5/8" 7'-10" 21'-6 1/8" 2'-9 1/4" 13'-1 5/8" 19'-2 1/2" ADEIJKGFCHB Provide dimensioned enlargedplan and section details of theliving room Isokern fireplacedemonstrating compliance withthe manufacturer's instructionsfor clearance to combustibles(1.5" to framing, 3" to insulation)and support of fireplace andhearth extension completely bynon-combustible materials. DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COPERMIT SETDRB SET ASPEN STAMPS All ideas, designs, arrangements and plansindicated or represented by this drawing areowned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC. 07/13/201705/18/2017 124 15 16 17 18 45 46 47 50 49 48 14'-3 7/8" 16'-5" 8'-1/2" 7'-8" 6'-4" 9'-11" 3'-11 1/4" 4'-1 1/4" 100' 100' 100' 100' 100' 1A-4.2 6A-4.5 W1 W1 W1 W6 W16 W16 CDSD 2A-5.2 1A-5.3 54A 54B 54C 5312 110 109 102 107 104 106 105 108 104103 111 44 123 13 14 126 4 3 5 6 9 10 8 7 2A-6.6 1A-4.5 FLOATING CABINET TEMPERED GLASSSHOWER ENCLOSURE ISOKERNMAGNUM 72"FULL MASONRYFIREPLACEW/ GAS LOG SET MONTIGO H38CRGAS CORNERFIREPLACE W3 W6 W3 W3 W3 W1 W1W3 W3 W3 W7 W7 W7 W7 W7 W7 W7 W7 W7 W8 2" TH. X 20" DEEP STONEHEARTH EXTENSION - EDGESTO EXTEND 12" MIN. BEYONDEACH SIDE OF THE F.P.OPENING FP LIVINGRM 102 BATHROOMRM 120C CLOSETRM 120A MASTERCLOSETRM 121D MASTER FOYERRM 121E MASTERBEDROOMRM 121 MASTERBATHROOMRM 121A AUTO COURT FP STEAMSHOWERRM 121C TUB COVERED ENTRY OUTDOORSHOWER STUDYRM 121E NTRYM 101 OFFICERM 120 SHOES / BAGSTOWELS / LINENS COUNTER/STORAGEBENCH/STORAGECOUNTER/STORAGEBENCH BENCH (SOUND PROOF ROOM) OOR FINISH TOWELS /LINENSDNCLOSETRM 120B TOILETRM 121B STAIR BOVERHANG ABOVE (SHOWN DASHED)FLR: WD D GRAIN WD FLR: PORCELAIN TILE FLR: CARPET FLR: CARPET FLR: CARPET FLR: CARPET FLR: CARPET T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD 10 RISERS @7.27"9 TREADS @11"12 RISERS @7.27"11 TREADS @11" (SHOWN DASHED)OVERHANG ABOVE (SHOWN DASHED)1/8"/FT MIN1/8"/FT MINDoor 110 from themaster closet to thestudy appears to beblocked by built incabinets.X:\Projects\Aspen\'16 Projects\1605 - Lot 7 Thunderbowl\DWG\1605 - LOT 7 THUNDERBOWL - CURRENT PLANS - CURRENT TOPO.pln | 8:30 PM | Wednesday, July 12, 20172625 64 626563 59614960211 76 78 82 81 80 79 83 212 208 207 206 7475 7372 71 70 69 204 66 67 68 77 203 205 113'-4" 113'-4" 113'-4" 112'-101/2"113'-4" 112'-10 1/2" 1A-5.2 2A-5.1 2A-5.2 1A-5.3 W7W7 W1 W7 W7 W1 W1 W8 W1 W1 W7 W7W7 W7W1 W1 W7 W1 W1 W2 W3 W8 W7 W6 W8 T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD CD CDSD SD 8788 89 209 213 201 202210 86 8584 1A-6.5 1A-6.5 4A-6.5 TEMPERED GLASSSHOWER ENCLOSURE TEMPEREDGLASSSHOWERENCLOSURE 36" HT GLASS GUARDRAIL-CONT.34" HT HANDRAIL W/ RETURN -TYP MONTIGO P38DFGAS INSERTFIREPLACE MONTIGO P38DFGAS INSERT FIREPLACE 36" HT GLASS GUARDRAIL W7 W3 W7 W10 W10 W3 W7 W7 W7 W7 W3 W6 W3 W3 W3 W3 W3 BEDROOMRM 204 ELEVATOR BEDROOMRM 203FP OPEN TUB /SHOWER FP ROOF DECK BUILT-INS CLOSET204A FLEXRM 202 BALCONY GREEN ROOF GREEN ROO F BATHROOMRM 203A DN BATHROOM204B OPEN BUILT-INS LINENSRM 203C TLTRM203B LANDING/HALLWAYRM 201 TLT204C GREEN ROOF GREEN ROOF MEMBRANEROOF GRAVEL GRAVEL GRAVELSTAIR A FLR: CARPET FLR: CARPETFLR: PORCELAINTILE FLR: CARPET FLR: CARPET FLR: CARPET FLR: CARPET FLR: WD 11RISERS @7.27"10TREADS @11"11RISERS @7.27"10TREADS @11"SITTING ROOMRM 201 OVERH A N G A B O V E (SHOWN DASHED)OVERHANG ABOVE (SHOWN DASHED)OVERHANG ABOVE (SHOWN DASHED)OVERH A N G A B O V E (SHOW N D A S H E D ) OVERHANG ABOVE (SHOWN DASHED) OVERHANG ABOVE (SHOWN DASHED) LINE OF WALL BELOW(SHOWN DASHED)LINE OF WALL BELOW(SHOW N D A S H E D ) LINE OF WALL BELOW(SHOWN DASHED) LINE OF WALL BELOW(SHOWN DASHED) 6' X 4' SKYLIGHT 1 Provide an emergencyescape and rescueopening from bedroom204 complying with2015 IRC R310.- Lot 7 Thunderbowl\DWG\1605 - LOT 7 THUNDERBOWL - CURRENT PLANS - CURRENT TOPO.pln | 8:30 PM | Wednesday, July 12, 20171A-5.2 2A-5.2 1A-5.3 125'-0" 125'-0" 125'-0" 113'-5" 117'-113/8" 112'-101/2" 112'-101/2" 125'-0"125'-0" OR 8269'-0" 127'-61/2" OR 8271'-61/2" PV SOLAR PANELS = 30KWSOUTH FACING AT 45DEG, 6"ABOVE ROOF TO. PLY 1 4 3 2 1A-6.5 1A-6.5 127'-27/8" OR 8271'-27/8" 125'-01/2" 127'-61/2" OR 127'-61/2" 127'-27/8" OR 8271'-27/8"TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY (BALCONY BELOW) 1:12 SLOPE 1:12 SLOPETO. PLYTO. PLY TO. PLY 412SLOPE412SLOPEPV SOLAR ARRAY PV SOLAR ARRAY TO. PLY (ROOF DECK BELOW) GREEN ROOF GREEN ROOF GREEN ROOFGREEN ROOF GREEN ROOFBALLASTGRAVEL BALLAST BALLAST STANDINGSEAM METAL GRAVEL GRAVELGRAVELSTEELCHIMNEYCAP STEELCHIMNEYCAP LINE O F W A L L B E L O W (SHOWN DASHED)LINE OF WALL BELOW(SHOWN DASHED)LINE OF WALL BELOW(SHOWN DASHED) LINE OF WALL BELOW(SHOWN DASHED)LINE OF WALL BELOW(SHOWN DASHED)A-3.5 shows 12 PVpanels at 30kW totalsloped at 45 degrees.REMP worksheetshows 28.8kW total(dropped down to 25.6by inverters) sloped at35 degrees.Coordinate andprovide cutsheets ofpanels and inverters toverify the ratings. Response: THE PLANS HAVE BEEN REVISED TO SHOW SPOT ELEVATIONS AT EACH SIDE OF DOORS AND THRESHOLDS Response: SHEET 'A7.10 - FIREPLACE (ISOKERN) ENLARGED PLAN AND SECTION' HAS BEEN ADDED TO PERMIT APPLICATION SET Response: THERE IS A PASS THROUGH THE CABINET TO GET TO DOOR 110 - PLAN HAS BEEN REVISED TO SHOW CLEARLY Response: A DOOR HAS BEEN ADDED AT BEDROOM 204 SEE SHEET: A3.3, A3.4 SEE SHEET: A7.10 SEE SHEET: A3.3 SEE SHEETS: A3.4, A10.1, A4.2, A4.5 SEE SHEET: A3.5 Response: PV PANELS HAVE BEEN REMOVED FROM PERMIT APPLICATION 1/16/18 Page:18 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:Secondary roof drains Author:nickt Color: Show all roof drains. Provide secondary drains or scuppers where the roof perimeter could trap water if the primary drains clog. Secondary drains must be above the primary drain inlet but below window and door thresholds. Secondary drains require separate plumbing and a termination location above grade that can be observed by occupants. Show the location of the primary drains and the secondary drains and their outlet terminations. (2015 IPC 1108) Page:31 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: You appear to have called out F3, which references a fire rated assembly, arbitrarily on you sections. Revise sections to reference the correct assemblies. Page:32 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:Foundation height above grade Author:nickt Color: Revise all drawings (architecturals, structurals, civils) so grade is 6” or more below the top of each foundation wall per 2015 IRC R404.1.6 (4" at stone veneers). Alternatively, the City will accept a lesser distance if all of the following are provided. Note this requirement at all applicable wall sections and details: 1.All wood materials within 6” of grade to be protected from decay per R317.1 5. 2.Waterproof membrane extending up wall a minimum of 6” above grade. 3.Capillary break separating concrete from wood materials. Page:33 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Provide detail of attachment, glass materials, and structural load verification for the glass floor in the entryway. DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COSHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS 119 S Spring StSuite 203Aspen, CO 81611 970-925-3444 All ideas, designs, arrangements and plansindicated or represented by this drawing are A-3.5 ROOF PLAN - 3/16" owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC.X:\Projects\Aspen\'16 Projects\1605 - Lot 7 Thunderbowl\DWG\1605 - LOT 7 THUNDERBOWL - CURRENT PLANS - CURRENT TOPO.pln | 8:30 PM | Wednesday, July 12, 201707/13/201705/18/2017 SHEET No.1A-5.2 1A-5.1 2A-5.2 2A-5.2 1A-5.3 1A-5.3 125'-0" 125'-0" 112'-33/4" 113'-91/8" 116'-41/2" 125'-0" 113'-5" 117'-113/8" 110'-71/2" 112'-101/2" 112'-101/2" 125'-0"125'-0" OR 8269'-0" 127'-61/2" OR 8271'-61/2" 116'-61/8" 113'-10" PV SOLAR PANELS = 30KWSOUTH FACING AT 45DEG, 6"ABOVE ROOF TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY 1 4 3 2 4 3 2 1 5 6 9 10 8 7 1A-6.5 1A-6.5 127'-27/8" OR 8271'-27/8" 125'-01/2" 113'-10" 127'-61/2" OR 127'-61/2" 115'-17/8"115'-23/4" 116'-61/8" 113'-10" 121'-81/2" OR 8265'-81/2" 127'-27/8" OR 8271'-27/8"SNOWSTOP SNOWSTOP TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY TO. PLY (BALCONY BELOW) 1:12 SLOPE 1:12 SLOPETO. PLYTO. PLY TO. PLY 4:12 SL O P E 4:12 SLOP E TO. PLY TO. PLY PV SOLAR ARRAY PV SOLAR ARRAY TO. PLY (ROOF DECK BELOW) GREEN ROOF GREEN ROOF GREEN ROOF GREEN ROOFTO. PLY GREEN ROOFGREEN ROOF GREEN ROOFBALLASTGRAVEL BALLAST BALLAST MEMBRANEROOF STANDINGSEAM METAL STANDINGSEAM METAL STANDINGSEAM METAL GRAVEL GRAVEL GRAVEL GRAVEL MEMBRANEROOF GRAVEL GRAVEL GRAVELGRAVEL 6' X 4' SKYLIGHTSTEELCHIMNEYCAP STEELCHIMNEYCAP STEELCHIMNEYCAP LINE OF W A L L B E L O W (SHOWN DASHED)LINE OF W A L L B E L O W (SHOW N D A S H E D ) LINE OF WALL BELOW(SHOWN DASHED) LINE OF WALL BELOW(SHOWN DASHED)LINE OF WALL BELOW(SHOWN D A S H E D ) 5 1A-5.2 1A-5.1 ADEIJKGFCHB SCALE: 3/16" = 1'-0"1 ROOF PLAN - 3/16" SCALE SHEET NOTES:1. ALL ROOF PITCHES = 1/8"/FT MIN., U.O.N.2. SEE SHEET 3.4 "UPPER LEVEL PLAN AND LOWER ROOFS" FORLOWER LEVEL ROOF DRAIN LAYOUT AND ROOF PITCHES3. ALL ROOF ASSEMBLIES = CLASS A Show all roof drains. Provide secondary drainsor scuppers where the roof perimeter could trapwater if the primary drains clog. Secondarydrains must be above the primary drain inlet butbelow window and door thresholds. Secondarydrains require separate plumbing and a termination location above grade that can beobserved by occupants. Show the location ofthe primary drains and the secondary drainsand their outlet terminations. (2015 IPC 1108) DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COSHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS 119 S Spring StSuite 203Aspen, CO 81611 970-925-3444 All ideas, designs, arrangements and plansindicated or represented by this drawing are A-5.3 BUILDING SECTIONS owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC. X:\Proj e c t s \ A s p e n \ ' 1 6 P r o j e c t s \ 1 6 0 5 - L o t 7 T h u n d e r b o w l \ D W G \ 1 6 0 5 - LOT 7 T H U N D E R B O W L - C U R R E N T P L A N S - C U R R E N T T O P O . p l n | 8 :30 PM | W e d n e s d a y , J u l y 1 2 , 2 0 1 7 07/13/201705/18/2017 SHEET No. B 3A-6.4 80'-31/2"CRAWL SPACE LEVEL 80'-31/2"CRAWL SPACE LEVEL 86'-91/2"LOWER LEVEL 86'-91/2"LOWER LEVEL 100'-0"MAIN LEVEL 100'-0"MAIN LEVEL 113'-4"UPPER LEVEL 113'-4"UPPER LEVEL 127'-27/8"125'-0"28'-0" HT FROM EXISTING GRADE 28'-0" HT FROM PROPOSED GRADE28'-0" HT FROM EXISTING GRADE 28'-0" HT FROM PROPOSED GRADE EXISTING GRADE EXISTING GRADE PROPOSED GRADE PROPOSED GRADE BEDROOM CLOSET KITCHEN LIVING ROOM MASTER BATH MASTERBEDROOM BEDROOM DENDEN BATHROOM CRAWLSPACE T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. PLYWD T.O. SLAB T.O. SLAB T.O. PLYWD T.O. PLYWD T.O. PLYWD BATHROOM TLT R3 R2 R4 R1 R3 F2F3F1F12F12 F2 F3 F3 F3 F2F3F1F11F3F2 F8 BEDROOMTLTBATHROOM K JI H G F E D C A SCALE: 3/16" = 1'-0"1 BUILDING SECTION 'E' You appear to havecalled out F3, whichreferences a fire ratedassembly, arbitrarilyon you sections.Revise sections toreference the correctassemblies. DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COSHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS Aspen, CO 81611 970-925-3444 All ideas, designs, arrangements and plansindicated or represented by this drawing are A-6.1 1/2" WALL SECTIONS owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC. 07/13/201705/18/2017 SHEET No. 116'-61/8" GLASS DOOR - SEE DOOR SCHEDULE FOR INFO. WINDOW - SEE WINDOW SCHEDULE FOR INFO. DROPPED CEILING FRAMING ROOF FRAMING - S.S.D. DROPPED CEILING FRAMING FLOOR FRAMING - S.S.D. FURRING WALL CONCRETE FOUNDATION WALL - S.S.D. EXISTING GRADE MASTERBEDROOM MASTERPATIO BEDROOM F2 F2 F8 17.4TYP. 100'-0"MAIN LEVEL 113'-4"UPPER LEVEL 86'-91/2" LOWER LEVEL 80'-31/2"CRAWL SPACE LEVEL SCALE: 1/2" = 1'-0"01 WALL SECTION A Revise all drawings (architecturals, structurals, civils) so grade is 6” or morebelow the top of each foundation wall per 2015 IRC R404.1.6 (4" at stoneveneers). Alternatively, the City will accept a lesser distance if all of the followingare provided. Note this requirement at all applicable wall sections and details:1.All wood materials within 6” of grade to be protected from decay per R317.1 5.2.Waterproof membrane extending up wall a minimum of 6” above grade.3.Capillary break separating concrete from wood materials. 112'-33/4" WINDOW - SEE SCHEDULE FOR INFO. WINDOW - SEE SCHEDULE FOR INFO. FLOOR FRAMING - S.S.D. DROPPED CEILING FRAMING FURRING WALL CONCRETE FOUNDATION WALL - S.S.D. CONCRETE SLAB - S.S.D. EXTERIOR WALL EXISTING GRADE LIVING RM ENTRY DEN T.O. PLY R1 F1 ROOF FRAMING - S.S.D. GLASS FLOOR F1 Provide detail ofattachment, glassmaterials, andstructural loadverification for theglass floor in theentryway. Response: ROOF PLANS HAVE BEEN REVISED TO SHOW ALL DRAINS AND SCUPPERS SEE SHEET: A3.4, A3.5 SEE SHEET: A5.1, A5.2, A5.3, FOR CALLOUTS AND REVISED ASSEMBLIES ON A-7.1 Response: SECTIONS AND REFERENCES TO ASSEMBLIES HAVE BEEN REVISED. ASSEMBLIES HAVE BEEN REVISED SEE SHEET: A7.12, S1.01 Response: GRADE HAS BEEN REVISED TO 6" OR MORE BELOW THE TOP OF EACH FOUNDATION WALL Response: GLASS FLOOR HAS BEEN REMOVED FROM THE PERMIT APPLICATION SEE SHEET: A3.3, A5.1, A6.2 1/16/18 Page:36 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:Glass guards Author:nickt Color: Glass guards must comply with one of the following: Have a top cap supported by at least 3 panes of glass; have a top cap supported independent of the glass; or in the case of no top cap, be at least two plies of equal thickness glass laminated together. Provide details demonstrating compliance with one of the above as well as method of attachment and support. Must support a point load of 200lbs. Please note that many glass support manufacturers require a top cap; if you exceed their design you will need a stamped engineered design. (Ordinance 40, 2016) Page:38 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: F3/A-7.1 does not comply with the listing of GA file no FC 5310 or UL L508 which require 4x10 or doubled 2x10 joists, 1 1/8" T&G decking, and furring channels. Page:39 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:Air sealing general note Author:nickt Color: Indicate in your sections and details how you will accomplish the air sealing requirements of 2015 IECC table R402.4.1.1. Indicate the continuity of the air barrier and where it is located throughout the building. Note locations that require caulking, sealing, taping, etc. Note which components are included in the air barrier such as spray foam, gypsum, housewrap, and/or exterior insulation. You may have all of the above but you need to pick one continuous barrier and stick to it. It needs to follow the thermal barrier. The better detail you provide, the easier it will be for the contractor and inspector to be successful. This is a new 2015 code requirement in lieu of a blower door test. Please contact me to go over this. DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COSHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS 119 S Spring StSuite 203Aspen, CO 81611 970-925-3444 All ideas, designs, arrangements and plansindicated or represented by this drawing are A-6.5 1/2" PLANS AND SECTION- STAIR 'A' owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC. X:\Pro j e c t s \ A s p e n \ ' 1 6 P r o j e c t s \ 1 6 0 5 - L o t 7 T h u n d e r b o w l \ D W G \ 1 6 0 5 - LO T 7 T H U N D E R B O W L - C U R R E N T P L A N S - C U R R E N T T O P O . p l n | 8 :30 PM | W e d n e s d a y , J u l y 1 2 , 2 0 1 7 07/13/201705/18/2017 SHEET No. 86'-91/2"LOWER LEVEL 100'-0"MAIN LEVEL 113'-4"UPPER LEVEL 9'-63/4" 10'-41/4"7 1/4" -T Y P . 11 - TYP 11"-TYP 7"-TYP 34" HT HANDRAIL - CONT. - TYP. 36" HT 3/4" TH LAMINATEDGLASS GUARDRAIL - TYP 36" HT 3/4" TH LAMINATEDGLASS GUARDRAIL - TYP 36" HT 3/4" THLAMINATEDGLASS GUARDRAIL - TYP 36" HT 3/4" TH LAMINATEDGLASS GUARDRAIL - TYP 34" HT HANDRAIL - CONT. - TYP. 34" HT HANDRAIL - CONT. - TYP. 4'-2" 3'-0" 4'-2"4'-2"1A-6.5 34" HT HANDRAILW/ RETURN -TYP 36" HT 3/4" THLAMINATED GLASSGUARDRAIL 36" HT 3/4" THLAMINATED GLASSGUARDRAIL 36" HT 3/4" THLAMINATED GLASSGUARDRAIL36" HT 3/4" THLAMINATED GLASSGUARDRAIL STAIR A DN 11RISERS @ 7 . 2 7 "10TREADS @11"11RISERS @ 7 . 2 7 "10TREADS @11"4'-2"8 84 4'-2" 3'-0" 4'-2" 1A-6.5 34" HT HANDRAILW/ RETURN -TYP 34" HT HANDRAILW/ RETURN -TYP36" HT 3/4" THLAMINATED GLASSGUARDRAIL 36" HT 3/4" THLAMINATED GLASSGUARDRAIL 36" HT 3/4" THLAMINATED GLASSGUARDRAIL 36" HT 3/4" THLAMINATED GLASSGUARDRAIL STAIR A COATSRM 111A STAIR A UPDN 11RISERS @ 7 . 2 7 " 10TREADS @ 1 1 " 11RISERS @ 7 . 2 7 " 10TREAD S @ 1 1 "11RISERS @7.27"10TREAD S @ 1 1 " 6 5 4 EF 4 5 6 EF 4 5 6 86'-91/2"LOWER LEVEL 100'-0"MAIN LEVEL 113'-4"UPPER LEVEL 34" HT HANDRAILW/ RETURN -TYP36" HT 3/4" THLAMINATED GLASSGUARDRAIL STAIR A 11RISERS @ 7 . 2 7 " 10TREADS @ 1 1 " EF 4 5 6 SCALE: 1/2" = 1'-0"1 STAIR A - SECTION SCALE: 1/2" = 1'-0"4 UPPER LEVEL PLAN - 1/2" SCALE SCALE: 1/2" = 1'-0"3 MAIN LEVEL PLAN - 1/2" SCALE SCALE: 1/2" = 1'-0"2 LOWER LEVEL PLAN - 1/2" SCALE Glass guards must comply with one of thefollowing: Have a top cap supported by at least3 panes of glass; have a top cap supportedindependent of the glass; or in the case of no topcap, be at least two plies of equal thickness glasslaminated together. Provide detailsdemonstrating compliance with one of the aboveas well as method of attachment and support.Must support a point load of 200lbs. Please notethat many glass support manufacturers require atop cap; if you exceed their design you will needa stamped engineered design. (Ordinance 40,2016) DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COSHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS All ideas, designs, arrangements and plansindicated or represented by this drawing are A-7.1 FLOOR ASSEMBLIES owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC. 07/13/201705/18/2017 SHEET No.6" 2" 4"5/8"6"3"3"4 3/4"6" 2" 4" WASHED GRAVEL - MIN. 6" UNDISTURBED SOILOR COMPACT FILL 4" CONC. SLAB R-11 RIGID INSULATION PLYWOOD- S.S.D. 3/4" PLYWOOD TILE FLOORING AND SETTINGBED - SEE INTERIOR FINISHSCHEDULE FOR TILE 6" SOUND-ATTENUATIONBATTS OVER LIVING SPACE JOISTS - S.S.D. 5/8" TYPE 'X' GYP. BD. STAYS WATERPROOF MEMBRANE 4" CONC. SLAB W/ RADIANTHEAT TUBING 1½" SLAB REINFORCED W/W.W.M. PLYWOOD - S.S.D. CARPET ATOP CARPET PAD-SEE INTERIOR FINISH SCHED.FOR CARPET TYPE 6" SOUND-ATTENUATIONBATTS @ LIVING SPACES JOISTS - S.S.D. INTERIOR CEILING FINISH PER SPEC STAYS 3" TH RADIANT SLAB R-42 SPRAY-IN RIGID CLOSED-CELL INSULATION @ EXTERIORSPACE (ACTS AS VAPORBARRIER) LIVING SPACEEXTERIOR SPACE INTERIOR CEILING FINISH PER SPECFLOOR FRAMING - S.S.D. 1-1/2" RIGID (MIN) -SLOPED AT1/8" PER FOOT-MIN R-63 SPRAY-IN RIGID CLOSED-CELL INSULATION (ACTS ASVAPOR BARRIER) 3/4" T&G SOFFIT - SPECIES ANDFINISH TBD BACKING BOARD FOR T&GSOFFIT PLYWOOD DECKING - S.S.D.JOISTS - S.S.D.R-42 SPRAY-IN RIGID CLOSED-CELL INSULATION (ACTS ASVAPOR BARRIER) 1/2" PLYWOOD (BACKINGBOARD FOR T&G SOFFIT)3/4" T&G SOFFIT - SPECIES ANDFINISH TBD 6 SOUND-ATTENUATIONBATTS OVER LIVING SPACEJOISTS - S.S.D. 3/8" PORCELAIN TILE OVER THINSET WASHED GRAVEL - MIN. 6" UNDISTURBED SOILOR COMPACT FILL R-11 RIGID INSULATION 1½" RADIANT SLABREINFORCED W/ W.W.M. ¾" PLYWOOD 1/2" DRAINAGE MAT WASHED GRAVEL - MIN. 6" UNDISTURBED SOILOR COMPACT FILL 4" RADIANT CONC. SLAB R-11 RIGID INSULATIONS.D. LOSED-AS H PER SPEC S.D. H PER SPEC SLAB ON GRADE @ CRAWLSPACESF81 ½" = 1'-0" 1 ½" = 1'-0"F3 1 HOUR RATED FRAMED FLOOR W/ TILE OVER 11/2" SLAB DESIGN BASED ON GA FILE NO. FC 53101 HOUR RATING40 TO 44 STC RATINGFIRE TESTING: UL R 1319-47, 5-8-63 UL DESIGN L508 UL DESIGN L508 T. O. SLAB T. O. FIN. FLOOR T. O. PLYWOOD FRAMED FLOOR W/ SLAB @ GARAGEF61 ½" = 1'-0" T. O. PLYWOOD T. O. SLAB 1 ½" = 1'-0"F2 FRAMED FLOOR W/ CARPET OVER 11/2"SLAB T. O. FIN. FLOOR T. O. PLYWOOD ROOF DECK OVER LIVING SPACESF51 ½" = 1'-0" T. O. PLYWOOD 1 ½" = 1'-0"FRAMED FLOOR W/ WOOD OVER EXTERIOR SPACEF4 1 ½" = 1'-0"F1 FRAMED FLOOR W/ WOOD OVER 11/2" SLABSLAB ON GRADE WITH TILE FINISHF71 ½" = 1'-0" RADIANT SLAB ON GRADE (SNOWMELT)F9 1 ½" = 1'-0" T. O. SLAB R-42 SPRAY-IN RIGID CLOSED-CELL INSULATION (ACTS ASVAPOR BARRIER) JOISTS - S.S.D. 1/2" DRAINAGE MATWATERPROOF MEMBRANE INTERIOR CEILING FINISH PER SPEC STAYS PLYWOOD - S.S.D. CEILING FINISH PER SPEC LOSED-AS F3/A-7.1 does notcomply with the listingof GA file no FC 5310or UL L508 whichrequire 4x10 ordoubled 2x10 joists, 11/8" T&G decking, andfurring channels. ¾" PLYWOOD SHEATHING R-49 SPRAY -IN INSULATIONOVERLIVING SPACE 1½" RADIANT SLABREINFORCED W/ W.W.M. RIGID INSULATION - TAPEREDTO SLOPE TO DRAIN - 1/8"/FT-MIN WATER PROOF MEMBRANE 1/2" DRAINAGE MAT AREA DRAIN AS SPECIFIED 1 ½" = 1'-0"1 ½" = 1'-0"47 T. O. PLYWOOD FIN. CEILING - INTERIOR AREA DRAIN @ FRAMED FLOOR - TYPICAL JOISTS - SSD 5/8" GYP. BD. (TYPE 'X' AT FIRERATED LOCATIONS) FURRING AS NEEDED Indicate in your sections and details how you willaccomplish the air sealing requirements of 2015 IECCtable R402.4.1.1. Indicate the continuity of the air barrierand where it is located throughout the building. Notelocations that require caulking, sealing, taping, etc. Notewhich components are included in the air barrier such asspray foam, gypsum, housewrap, and/or exteriorinsulation. You may have all of the above but you need topick one continuous barrier and stick to it. It needs tofollow the thermal barrier. The better detail you provide,the easier it will be for the contractor and inspector to besuccessful. This is a new 2015 code requirement in lieuof a blower door test. Please contact me to go over this. Response: DETAILS FOR GUARDRAILS HAVE BEEN ADDED TO SET . DOCUMENTATION FROM MANUFACTURER HAS BEEN PROVIDED SEE SHEET: A7.11 AND ENGINEERING REPORT FROM C.R. LAWRENCE Response:: UL LISTING HAS BEEN REMOVED FROM ASSEMBLY. SEE SHEET: A7.1 Response: DETAILS FOR AIR SEALING HAVE BEEN ADDED TO SET SEE SHEETS: A7.13, A7.2, A7.6, A7.7, A7.12 1/16/18 Page:40 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Using the prescriptive approach, as documented by AEC's letter, basement walls must have one of the following: R-15 continuous insulation; R-19 cavity insulation; or a combination of R-5 continuous and R-13 cavity. Alternatively you could use the U-factor alternative as described in the above grade wall comment or REScheck. Page:40 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: You have chosen the prescriptive R value option for energy code compliance according to the letter from AEC. This means your exterior above grade walls must have R-20 cavity insulation PLUS R-5 continuous exterior insulation (2015 IECC R402.1.2). Alternatively, you could use the prescriptive U factor alternative option for just your walls. This requires the entire wall assembly to have a U factor of 0.045 or less. It includes air layers, and all materials including sheathing and framing. You must submit calculations demonstrating compliance. The calculations must account for the thermal bridging of framing by performing an area weighted average of cavities filled with insulation vs. framing members. (2015 IECC R402.1.4) Another alternative would be to use REScheck which allows tradeoffs. Page:40 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: W7 and W9 cannot be considered 1 hour without proper documentation. Provide a listed assembly or calculations per 2015 IBC 722. Page:42 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:Class A Roof Author:nickt Color: Provide documentation that the roof assemblies are Class A. This is typically either an ESR or UL report. Revise you roof details to match the report(s). (Ordinance 40, 2016)X:\Projects\Aspen\'16 Projects\1605 - Lot 7 Thunderbowl\DWG\1605 - LOT 7 THUNDERBOWL - CURRENT PLANS - CURRENT TOPO.pln | 8:31 PM | Wednesday, July 12, 20175/8" SEE PLAN 5/8" 5/8" SEE PLAN 5/8"1/2" SEE PLAN 5/8" 1/2" SEE PLAN 5/8"SEE PLAN1 1/2" SEE PLAN 1/2" SEE PLAN 5/8" 1/2" SEE PLAN 5/8" 1/2" 5/8" SEE PLAN 5/8"5/8" SEE PLAN 5/8" 1/2" SEE PLAN 1/2"5/8" SEE PLAN 5/8" 5/8" TYPE 'X' GYPSUM WALL BOARD WALL FRAMING W/ BLOCKING AS REQUIREDSOUND ATTENUATING INSULATION - REFER TOSPECS 5/8" TYPE 'X' GYPSUM WALL BOARD MTL. WALL TIES @ (1) PER 2 SQ. FT. MAX. - NON-CORRUGATED 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH, W.O. - SEE SCHEDULE WALL FRAMING W/ BLOCKING AS REQUIRED1/2" EXT. GRADE SHEATHING BUILDING WRAP/ PAPER SOUND ATTENUATING INSULATION - REFER TOSPECS GROUT & JOINTS PER APPROVED MOCK-UP 6" (NOMINAL) STONE VENEER MTL. WALL TIES PER I.R.C. CHAPTER 7 6" (NOMINAL) STONE VENEER CONC. WALL RE: STRUCT.1" GROUT SPACE WALL FRAMING W/BLOCKING AS REQUIRED SOUND ATTENUATING INSULATION - REFER TOSPECS 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULE 5/8" TYPE 'X' GYP. BD. FIRE SIDE OF WALL BACKFILL W/ SCREENED GRAVEL R-11 RIGID INSULATION FIBERGLASS FILTER CLOTH CONC. WALL RE: STRUCT. FOUNDATION WATERPROOFING - CONTINUE TOBOTTOM OF FOOTING (SHOWN DASHED) 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULEWALL FRAMING W/ BLOCKING AS REQUIRED FOUNDATION WALL - S.S.D. R-24 SPRAY-IN RIGID CLOSED-CELL INSULATION(ACTS AS VAPOR BARRIER) 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULEWALL FRAMING W/ BLOCKING AS REQUIREDSOUND ATTENUATING INSULATION - REFER TOSPECS GROUT & JOINTS PER APPROVED MOCK-UP WALL FRAMING W/BLOCKING AS REQUIRED 1/2" EXT. GRADE SHEATHING BUILDING WRAP/ PAPER R-28 SPRAY-IN RIGID CLOSED-CELL INSULATION(ACTS AS VAPOR BARRIER) 6" (NOMINAL) STONE VENEER MTL. WALL TIES PER I.R.C. CHAPTER 7 MIN. 1" AIR OR MORTAR SPACE 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULEWALL FRAMING W/ BLOCKING AS REQUIREDSOUND ATTENUATING INSULATION - REFER TOSPECS DESIGN BASED ON GA FILE NO. WP 36051 HOUR RATINGFire Test:UL R1319-4, -6, 6-17-52UL R2717-39, 1-20-66;UL R3501-52, 3-15-66,UL Design U305;ULC Design W301 UL DESIGN U305 1 ½" = 1'-0"W3 EXTERIOR STUD WALL W/ 1 ½" = 1'-0"W11 ½" = 1'-0"INTERIOR WALL - 1 HR RATEDW7 1 ½" = 1'-0"W8 INTERIOR WALL W/ STONE VENEER 1 ½" = 1'-0"FOUNDATION WALL W/ STONE VENEERW5 EXTERIOR STUD WALL W/ 1 ½" = 1'-0"W9 1 HOUR RATED INTERIOR WALL GL GL 1 ½" = 1'-0"1 ½" = 1'-0"INSULATED FOUNDATION WALLW11 GL 1 ½" = 1'-0"W2 INTERIOR WALL W/ STEEL REVEAL - T Y P GL 1 ½" = 1'-0"INTERIOR FURRING WALL AT FOUNDATIONW4 GL 1 ½" = 1'-0"INTERIOR WALL WITH GYB BOARD 1 SIDEW10 1 ½" = 1'-0"W6EXTERIOR STUD WALL W/ STONE VENEER @ BOTH SIDES GL 1 ½" = 1'-0"INTERIOR WALL @ CRAWL SPACEW12 GL Using the prescriptiveapproach, asdocumented by AEC'sletter, basement wallsmust have one of thefollowing:R-15 continuousinsulation; R-19 cavityinsulation; or acombination of R-5continuous and R-13cavity. Alternativelyyou could use theU-factor alternative asdescribed in the abovegrade wall comment orREScheck. DRAWING ISSUELOT 7 THUNDERBOWL 395 T h u n d e r b o w l L a n e , A s p e n , C O SHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS 119 S Spring StSuite 203Aspen, CO 81611 970-925-3444 All ideas, designs, arrangements and plansindicated or represented by this drawing are A-7.3 WALL ASSEMBLIES owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC. X:\Projects\ A s p e n \ ' 1 6 P r o j e c t s \ 1 6 0 5 - L o t 7 T h u n d e r b o w l \ D W G \ 1 6 0 5 - LOT 7 T H U N D E R B O W L - C U R R E N T P L A N S - C U R R E N T T O P O . p l n | 8 :31 PM | Wedn e s d a y , J u l y 1 2 , 2 0 1 7 07/13/201705/18/2017 SHEET No. 5/8" SEE PLAN 5/8" 5/8" SEE PLAN 5/8"1/2" SEE PLAN 5/8" 1/2" SEE PLAN 5/8"SEE PLAN1 1/2" SEE PLAN 1/2" SEE PLAN 5/8" 1/2" SEE PLAN 5/8" 1/2" 5/8" SEE PLAN 5/8"5/8" SEE PLAN 5/8" 1/2" SEE PLAN 1/2"5/8" SEE PLAN 5/8" 1/2" EXT. GRADE SHEATHING-NOTE: 5/8" DENS GLAS AT LOCATIONS WITHIN5'-0" OF PROPERTY LINE) WALL FRAMING W/ BLOCKING AS REQUIREDR-28 SPRAY-IN RIGID CLOSED-CELL INSULATION(ACTS AS VAPOR BARRIER) BUILDING WRAP/ PAPERSHIPLAP WOOD SIDING @ 5" O.C. - LEAVE 1/4"GAP 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULE GROUT & JOINTS PER APPROVED MOCK-UP 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULE WALL FRAMING W/BLOCKING AS REQUIRED1/2" EXT. GRADE SHEATHING-NOTE: 5/8" DENS GLAS AT LOCATIONS WITHIN5'-0" OF PROPERTY LINE)BUILDING WRAP/ PAPER R-28 SPRAY-IN RIGID CLOSED-CELL INSULATION(ACTS AS VAPOR BARRIER) 5/8" TYPE 'X' GYPSUM WALL BOARDWALL FRAMING W/ BLOCKING AS REQUIREDSOUND ATTENUATING INSULATION - REFER TOSPECS5/8" TYPE 'X' GYPSUM WALL BOARD MTL. WALL TIES @ (1) PER 2 SQ. FT. MAX. - NON-CORRUGATED 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH, W.O. - SEE SCHEDULE WALL FRAMING W/ BLOCKING AS REQUIRED1/2" EXT. GRADE SHEATHINGBUILDING WRAP/ PAPER SOUND ATTENUATING INSULATION - REFER TOSPECS GROUT & JOINTS PER APPROVED MOCK-UP 6" (NOMINAL) STONE VENEER MTL. WALL TIES PER I.R.C. CHAPTER 7MIN. 1" AIR OR MORTAR SPACE 6" (NOMINAL) STONE VENEER MTL. WALL TIES PER I.R.C. CHAPTER 76" (NOMINAL) STONE VENEER CONC. WALL RE: STRUCT.1" GROUT SPACE WALL FRAMING W/BLOCKING AS REQUIRED SOUND ATTENUATING INSULATION - REFER TOSPECS5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULE 5/8" TYPE 'X' GYP. BD. FIRE SIDE OF WALL BACKFILL W/ SCREENED GRAVEL R-11 RIGID INSULATION FIBERGLASS FILTER CLOTHCONC. WALL RE: STRUCT. FOUNDATION WATERPROOFING - CONTINUE TOBOTTOM OF FOOTING (SHOWN DASHED) 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULE WALL FRAMING W/ BLOCKING AS REQUIRED1/2" PLYWOODZ CLIPS SOUND ATTENUATING INSULATION - REFER TOSPECS STEEL PANEL - TYP. Z CLIPS 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULEWALL FRAMING W/ BLOCKING AS REQUIREDFOUNDATION WALL - S.S.D.R-24 SPRAY-IN RIGID CLOSED-CELL INSULATION(ACTS AS VAPOR BARRIER)5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULEWALL FRAMING W/ BLOCKING AS REQUIREDSOUND ATTENUATING INSULATION - REFER TOSPECS GROUT & JOINTS PER APPROVED MOCK-UP WALL FRAMING W/BLOCKING AS REQUIRED1/2" EXT. GRADE SHEATHINGBUILDING WRAP/ PAPERR-28 SPRAY-IN RIGID CLOSED-CELL INSULATION(ACTS AS VAPOR BARRIER) 6" (NOMINAL) STONE VENEER MTL. WALL TIES PER I.R.C. CHAPTER 7MIN. 1" AIR OR MORTAR SPACE5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULEWALL FRAMING W/ BLOCKING AS REQUIREDSOUND ATTENUATING INSULATION - REFER TOSPECS DESIGN BASED ON GA FILE NO. WP 36051 HOUR RATINGFire Test:UL R1319-4, -6, 6-17-52UL R2717-39, 1-20-66;UL R3501-52, 3-15-66,UL Design U305;ULC Design W301 UL DESIGN U305 1 ½" = 1'-0"W3EXTERIOR STUD WALL W/ STONE VENEER 1 ½" = 1'-0"W11 ½" = 1'-0"INTERIOR WALL - 1 HR RATEDW7 1 ½" = 1'-0"W8INTERIOR WALL W/ STONE VENEER 1 ½" = 1'-0"FOUNDATION WALL W/ STONE VENEERW5 EXTERIOR STUD WALL W/ HORIZONTAL SIDING 1 ½" = 1'-0"W91 HOUR RATED INTERIOR WALL GL GL 1 ½" = 1'-0"1 ½" = 1'-0"INSULATED FOUNDATION WALLW11 GL 1 ½" = 1'-0"W2INTERIOR WALL W/ STEEL PANELS REVEAL - TYP GL 1 ½" = 1'-0"INTERIOR FURRING WALL AT FOUNDATIONW4 GL 1 ½" = 1'-0"INTERIOR WALL WITH GYB BOARD 1 SIDEW10 1 ½" = 1'-0"W6EXTERIOR STUD WALL W/ STONE VENEER @ BOTH SIDES GL 1 ½" = 1'-0"INTERIOR WALL @ CRAWL SPACEW12 GL You have chosen the prescriptive R value option for energy codecompliance according to the letter from AEC. This means yourexterior above grade walls must have R-20 cavity insulation PLUSR-5 continuous exterior insulation (2015 IECC R402.1.2). Alternatively, you could use the prescriptive U factor alternative optionfor just your walls. This requires the entire wall assembly to have a Ufactor of 0.045 or less. It includes air layers, and all materialsincluding sheathing and framing. You must submit calculationsdemonstrating compliance. The calculations must account for thethermal bridging of framing by performing an area weighted averageof cavities filled with insulation vs. framing members. (2015 IECCR402.1.4)Another alternative would be to use REScheck which allows tradeoffs. DRAWING ISSUELOT 7 THUNDERBOWL 395 Thunderbowl Lane, Aspen, COSHEET No. DRAWN BY:PROJECT No: 1605RH PERMIT SETDRB SET ASPEN STAMPS 119 S Spring StSuite 203Aspen, CO 81611 970-925-3444 All ideas, designs, arrangements and plansindicated or represented by this drawing are A-7.3 WALL ASSEMBLIES owned by and are the property of David JohnstonArchitects, PC and developed for use and inconjunction with the specified project. Noneof the ideas, designs, arrangements or plansshall be used by or disclosed for any purposewhatsoever without the written authorizationof David Johnston Architects, PC.X:\Projects\Aspen\'16 Projects\1605 - Lot 7 Thunderbowl\DWG\1605 - LOT 7 THUNDERBOWL - CURRENT PLANS - CURRENT TOPO.pln | 8:31 PM | Wednesday, July 12, 201707/13/201705/18/2017 SHEET No. 5/8" SEE PLAN 5/8" 5/8" SEE PLAN 5/8"1/2" SEE PLAN 5/8" 1/2" SEE PLAN 5/8"SEE PLAN1 1/2" SEE PLAN 1/2" SEE PLAN 5/8" 1/2" SEE PLAN 5/8" 1/2" 5/8" SEE PLAN 5/8"5/8" SEE PLAN 5/8" 1/2" SEE PLAN 1/2"5/8" SEE PLAN 5/8" 1/2" EXT. GRADE SHEATHING-NOTE: 5/8" DENS GLAS AT LOCATIONS WITHIN5'-0" OF PROPERTY LINE) WALL FRAMING W/ BLOCKING AS REQUIREDR-28 SPRAY-IN RIGID CLOSED-CELL INSULATION(ACTS AS VAPOR BARRIER) BUILDING WRAP/ PAPERSHIPLAP WOOD SIDING @ 5" O.C. - LEAVE 1/4"GAP 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULE GROUT & JOINTS PER APPROVED MOCK-UP 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULE WALL FRAMING W/BLOCKING AS REQUIRED1/2" EXT. GRADE SHEATHING-NOTE: 5/8" DENS GLAS AT LOCATIONS WITHIN5'-0" OF PROPERTY LINE) BUILDING WRAP/ PAPER R-28 SPRAY-IN RIGID CLOSED-CELL INSULATION(ACTS AS VAPOR BARRIER) 5/8" TYPE 'X' GYPSUM WALL BOARDWALL FRAMING W/ BLOCKING AS REQUIREDSOUND ATTENUATING INSULATION - REFER TOSPECS5/8" TYPE 'X' GYPSUM WALL BOARD MTL. WALL TIES @ (1) PER 2 SQ. FT. MAX. - NON-CORRUGATED 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH, W.O. - SEE SCHEDULE WALL FRAMING W/ BLOCKING AS REQUIRED1/2" EXT. GRADE SHEATHINGBUILDING WRAP/ PAPER SOUND ATTENUATING INSULATION - REFER TOSPECS GROUT & JOINTS PER APPROVED MOCK-UP 6" (NOMINAL) STONE VENEER MTL. WALL TIES PER I.R.C. CHAPTER 7MIN. 1" AIR OR MORTAR SPACE 6" (NOMINAL) STONE VENEER MTL. WALL TIES PER I.R.C. CHAPTER 76" (NOMINAL) STONE VENEER CONC. WALL RE: STRUCT.1" GROUT SPACE WALL FRAMING W/BLOCKING AS REQUIRED SOUND ATTENUATING INSULATION - REFER TOSPECS 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULE 5/8" TYPE 'X' GYP. BD. FIRE SIDE OF WALL BACKFILL W/ SCREENED GRAVEL R-11 RIGID INSULATION FIBERGLASS FILTER CLOTH CONC. WALL RE: STRUCT. FOUNDATION WATERPROOFING - CONTINUE TOBOTTOM OF FOOTING (SHOWN DASHED) 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULE WALL FRAMING W/ BLOCKING AS REQUIRED1/2" PLYWOODZ CLIPS SOUND ATTENUATING INSULATION - REFER TOSPECS STEEL PANEL - TYP. Z CLIPS 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULEWALL FRAMING W/ BLOCKING AS REQUIRED FOUNDATION WALL - S.S.D.R-24 SPRAY-IN RIGID CLOSED-CELL INSULATION(ACTS AS VAPOR BARRIER) 5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULEWALL FRAMING W/ BLOCKING AS REQUIREDSOUND ATTENUATING INSULATION - REFER TOSPECS GROUT & JOINTS PER APPROVED MOCK-UP WALL FRAMING W/BLOCKING AS REQUIRED 1/2" EXT. GRADE SHEATHINGBUILDING WRAP/ PAPER R-28 SPRAY-IN RIGID CLOSED-CELL INSULATION(ACTS AS VAPOR BARRIER) 6" (NOMINAL) STONE VENEER MTL. WALL TIES PER I.R.C. CHAPTER 7MIN. 1" AIR OR MORTAR SPACE5/8" GYPSUM WALL BOARD OR OTHER INTERIORFINISH - SEE SCHEDULEWALL FRAMING W/ BLOCKING AS REQUIREDSOUND ATTENUATING INSULATION - REFER TOSPECS DESIGN BASED ON GA FILE NO. WP 36051 HOUR RATINGFire Test:UL R1319-4, -6, 6-17-52UL R2717-39, 1-20-66;UL R3501-52, 3-15-66,UL Design U305;ULC Design W301 UL DESIGN U305 1 ½" = 1'-0"W3EXTERIOR STUD WALL W/ STONE VENEER 1 ½" = 1'-0"W11 ½" = 1'-0"INTERIOR WALL - 1 HR RATEDW7 1 ½" = 1'-0"W8INTERIOR WALL W/ STONE VENEER 1 ½" = 1'-0"FOUNDATION WALL W/ STONE VENEERW5 EXTERIOR STUD WALL W/ HORIZONTAL SIDING 1 ½" = 1'-0"W91 HOUR RATED INTERIOR WALL GL GL 1 ½" = 1'-0"1 ½" = 1'-0"INSULATED FOUNDATION WALLW11 GL 1 ½" = 1'-0"W2INTERIOR WALL W/ STEEL PANELS REVEAL - T Y P GL 1 ½" = 1'-0"INTERIOR FURRING WALL AT FOUNDATIONW4 GL 1 ½" = 1'-0"INTERIOR WALL WITH GYB BOARD 1 SIDEW10 1 ½" = 1'-0"W6EXTERIOR STUD WALL W/ STONE VENEER @ BOTH SIDES GL 1 ½" = 1'-0"INTERIOR WALL @ CRAWL SPACEW12 GL W7 and W9 cannot beconsidered 1 hourwithout properdocumentation.Provide a listedassembly orcalculations per 2015IBC 722. All ideasindicateowned bArchitecconjuncof the idshall be whatsoeof David IB® ADHESIVE RAFTER RE: STRUCTURAL R-63 SPRAY-IN RIGID CLOSED-CELL INSULATION (ACTS ASVAPOR BARRIER) SEE INTERIOR SPECIFICATIONSFOR FINISH MATERIAL IB® 80 MIL PVC SINGLE-PLYMEMBRANE ROOFINGINSTALLED PERMANUFACTURER'S SPECS. - COLOR TBD 5/8" C/DX PLYWOOD SHEATHING POLY ISO INSULATION - SLOPETOWARDS GUTTER OR ROOFDRAIN AT 1/8" PER 1'-0" INSULATION ADHESIVER-63 SPRAY-IN RIGID CLOSED-CELL INSULATION (ACTS ASVAPOR BARRIER) ROOF FRAMING - S.S.D. BALLAST CLASS A ROOF MEMBRANE TYPICAL FLAT MEMBRANE ROOFR11 ½" = 1'-0" OPED STANDING SEAM METAL ROOF SLOPE PER PLAN DROPPED CEILING FRAMING 1/2" PLYWOOD BITUMINOUS WATERPROOF MEMBRANE CLASS A ROOF MEMBRANE PLYWOOD - S.S.D. STANDING SEAM METAL ROOF Provide documentation that the roofassemblies are Class A. This is typicallyeither an ESR or UL report. Revise youroof details to match the report(s).(Ordinance 40, 2016) Response: DETAILS HAVE BEEN REVISED TO SHOW R15 RIGID INSULATION AT THE FOUNDATION WALLS SEE DETAIL: W11/A7.3 Response: EXTERIOR ABOVE GRADE WALL DETAILS HAVE BEEN REVISED TO SHOW R-20 CAVITY INSULATION AND R-5 CONTINUOUS EXTERIOR INSULATION SEE SHEET: W1, W3, W6 ON SHEET A-7.3 Response: W9 = 1 hr rating labels have been removed -SEE FLOOR PLANS AND REVISED ASSEMBLY W7/W9 , SHEET 7.2: Response: ROOF ASSEMBLIES HAVE BEEN REVISED TO CORRESPOND WITH UL AND ESR LISTINGS SEE REVISED DETAILS ON 7.5 AND UL AND ESR DOCUMENTATION 1/16/18 Page:49 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Window 39 must be safety glazed per 2015 IRC R308.4. Page:49 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Window 82 must be safety glazed per 2015 IRC R308.4. Page:49 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Windows 84, 85, 87, & 88 must be safety glazed per 2015 IRC R308.4. Page:55 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Special inspection agreement must be signed by the special inspector, owner, and fabricator(s). You may skip this until you have those people selected but it will be required prior to sign off. Page:56 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: The soils report anticipated cuts up to 12'. Your design excavates deeper than that (18'+); provide a letter from the soils engineer confirming the soils report can be applied to the current design. MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL UPPER LEVEL 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 53 54A 54B 54C 84 85 87 88 49 6'-4" 6'-4" 6'-4" 6'-4" 6'-4" 2'-6" 2'-6" 2'-6" 2'-6" 7'-0" 2'-6" 3'-6" 4'-6" 4'-6" 4'-0" 7'-0" 4'-6" 4'-6" 4'-6" 3'-6" 3'-6" 3'-6" 8'-0" 6'-0" 3'-0" 3'-0" 4'-0" 4'-0" 4'-0" 5'-0" 5'-0" 5'-0" 3'-10" 3'-10" 4'-0" 4'-0" 6'-0" 6'-0" 4'-2" 4'-2" 3'-0" 7'-0" 7'-0" 3'-0" 6'-0" 7'-0" 3'-0" 6'-0" 7'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 8'-0" 1'-6" 2'-0" 2'-0" 2'-0" 6'-0" 9'-0" 1'-8" 1'-8" 1'-8" 1'-8" 9'-0" 7'-0" 7'-0" 7'-0" 2'-0" 2'-0" 2'-0" 6'-0" 2'-4" 1'-10" 1'-4" 8'-0" 7'-2" 8'-0" 7'-2" 3'-3 1/2" 16'-3" 16'-3" 3'-3" 9'-3" 16'-3" 3'-3" 9'-3" 16'-3" 9'-3" 9'-3" 9'-3" 9'-3" 9'-3" 9'-3" 8'-3" 9'-9" 9'-0" 9'-0" 9'-0" 9'-3" 9'-3" 10'-11" 10'-11" 10'-11" 10'-11" 9'-3" 10'-9" 10'-9" 10'-9" 11'-3" 11'-3" 11'-3" 9'-3" 13'-4" 12'-10" 12'-4" 9'-3" 3'-1" 9'-3" 3'-1" 11'-6 1/2" TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED G TEMPERED GLASS TEMPERED GLASS Window 39 must besafety glazed per 2015IRC R308.4.- CURRENT PLANS - CURRENT TOPO.pln | 8:31 PM | Wednesday, July 12, 2017UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 86 89 5'-10" 5'-10" 4'-6" 4'-6" 4'-6" 6'-0" 3'-0" 3'-0" 6'-0" 6'-0" 5'-0" 5'-0" 4'-6" 4'-6" 5'-0" 5'-0" 6'-0" 6'-0" 4'-9" 4'-9" 6'-0" 4'-2" 5'-0" 3'-0" 8'-0" 8'-0" 8'-0" 6'-6" 6'-6" 6'-6" 4'-6" 3'-0" 4'-6" 3'-6" 8'-0" 8'-0" 4'-6" 3'-6" 3'-0" 2'-5" 4'-6" 1'-10" 5'-7" 5'-7" 8'-3" 11'-3" 11'-3" 11'-3" 11'-3" 9'-9" 9'-9" 9'-9" 7'-9" 10'-9" 7'-9" 11'-3" 11'-3" 11'-3" 7'-9" 11'-3" 10'-9" 10'-2" 7'-9" 9'-7" 8'-8" 8'-8" TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS Window 82 must besafety glazed per 2015IRC R308.4. MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL MAIN LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL UPPER LEVEL 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 53 54A 54B 54C 84 85 87 88 49 55 56 57 46 4'-6" 3'-6" 3'-6" 3'-6" 8'-0" 6'-0" 3'-0" 3'-0" 4'-0" 4'-0" 4'-0" 5'-0" 5'-0" 5'-0" 3'-10" 3'-10" 4'-0" 4'-0" 6'-0" 6'-0" 4'-2" 4'-2" 3'-0" 5'-1" 5'-1" 5'-1" 20 2'-0" 6'-0" 9'-0" 1'-8" 1'-8" 1'-8" 1'-8" 9'-0" 7'-0" 7'-0" 7'-0" 2'-0" 2'-0" 2'-0" 6'-0" 2'-4" 1'-10" 1'-4" 8'-0" 7'-2" 8'-0" 7'-2" 3'-3 1/2" 2'-0" 2'-0" 2'-0" 90 9'-0" 9'-3" 9'-3" 10'-11" 10'-11" 10'-11" 10'-11" 9'-3" 10'-9" 10'-9" 10'-9" 11'-3" 11'-3" 11'-3" 9'-3" 13'-4" 12'-10" 12'-4" 9'-3" 3'-1" 9'-3" 3'-1" 11'-6 1/2" 15'-0" 15'-0" 15'-0" TEMPERED GL TEMPERED GL TEMPERED GL TEMPERED GL TEMPERED GL TEMPERED GL TEMPERED GL Windows 84, 85, 87,& 88 must be safetyglazed per 2015 IRCR308.4. with the manufacturer's recommended details for blocking, bracing,uct designations. Any alternate products shall be submitted to the be 134" in width with number of plies and depths as noted on plan.pll=2,510 psi, Fb=2,600 psi, Fv=285 psi, E=2,000,000 psi.oard (114" min) shall be as noted on plan, with the following minimumsi, E=1,300,000 psi.ng minimum working stresses: Fc pll=3,000 psi, Fb=2,400 psi, an with the following minimum working stresses: Fb=2,900 psi, plan with the following minimum working stresses: Fc pll=2,500 psi, ng minimum working stresses: 24F-V4, Fb(tension zone)=2,400 psi,g cantilever conditions, shall be 24F-V8 unless noted otherwise in the ed per manufacturer's specifications 2'-0" MIN all all connectors in accordance with manufacturer's instructions for shall be ASTM A307 unless noted otherwise on the Drawings. Boltslatest edition of the National Design Specification for WoodBolts used to connect pressure-treated wood shall be HDG or be bored the same depth and diameter as the bolt shank. Therements. Lag screws used to connect pressure-treated wood shall be ers under all nuts, bolts or lag screw heads which bear on wood.holes to prevent splitting as recommended in the NDS.e Structural Drawings.for all framing members in accordance with the requirements of IBC rawings, wood construction shall comply with the requirements of the (8) 10d COMMONMIN BTWN SPLICES CCW_______COUNTER CLOCKWISEDIAG_______DIAGONALDL_________DEAD LOADDEFL_______DEFLECTIOND.B.A.______DEFORMED BAR ANCHOD.W.F.______DEFORMED WIRE FABRICE.F.________EACH FACEE.N.________EDGE NAILINGEL_________ELEVATIONELEV_______ELEVATOREMBED_____EMBEDMENTEQ_________EQUALEQUIV______EQUIVALENTEXISTG/(E)__EXISTINGEXP________EXPANSIONEXT________EXTERIORF.D.________FLOOR DRAINFLG________FLANGEFTG________FOOTINGFDN________FOUNDATIONGA_________GAUGE/GAGEGALV______GALVANIZED, HOT DIPG.C._______GENERAL CONTRACTORGL_________GLUE-LAMINATED MEMBG.B.________GRADE BEAMHGR_______HANGERH.A.S.______HEADED ANCHOR STUDHDR_______HEADERHT_________HEIGHTHSS________HOLLOW STRUCTURAL SHK_________HOOKHORIZ______HORIZONTALI.F._________INSIDE FACEINT________INTERIORIBC________INTN'L BUILDING CODEIRC________INTN'L RESIDENTIAL CODISO________ISOLATIONJT_________JOINTJST________JOISTK__________KINGKSI________KIPS PER SQUARE INCH 5. Roof trusses shall be attached to wall top plates with Simpson H2.5 hurricane ties, minimum, each end, unless notedotherwise on the Drawings or supplier Shop Drawings..6. Girder trusses shall be attached to bearing wall top plates with a minimum of (2) H2.5a hurricane ties, unless notedotherwise on the Drawings or supplier Shop Drawings.7. Truss shop drawings must be provided to the engineer of record for review prior to fabrication. ONNECTION SCHEDULE UM U.N.O.)1, 2 NAILING TYPE m (3) 10d Toenail (2) 16d, (1) T&B End Nail (3) 10d @ 16"o.c.Face Nail (2) 16d @ 16"o.c.Face Nail (3) 16d @ 16"o.c.Face Nail s1 Per Typ Detail 8d @ 6"o.c.Toenail 8d @ 6"o.c. (3) min per block Toenail (2) 10d each joist Face Nailil for additional information. ormation. Special inspection agreement mustbe signed by the special inspector,owner, and fabricator(s). You mayskip this until you have thosepeople selected but it will berequired prior to sign off. T.O. SLAB = 91'-11" F3.0w/ BP PE R 2/S5.02COL ABOVE T.O. WALL 92'-0" O. FTG 79'-712" T.O. FTG 87'-712" T.O. WALL 99'-938"TYP U.N.O. T.O. WALL 107'-0" T.O. LEDGE 06'-6" T.O. LEDGE 99'-338" 6 ABOV ESTL CO L ABOVESTL COL ALL FLOOR DIAPHRAGMSSHALL BE COMPLETED PRIORTO BACKFILL PLACEMENTBEHIND FOUNDATION WALLS F2.5 F3.0 F4.5 F3.0 T.O. LEDGE 99'-6"TYP U.N.O. 7'-414" 9'-934"3'-114"The soils report anticipated cuts up to12'. Your design excavates deeperthan that (18'+); provide a letter fromthe soils engineer confirming thesoils report can be applied to thecurrent design. Response: "TEMPERED" ADDED TO WINDOW SCHEDULE Response: "TEMPERED" ADDED TO WINDOW SCHEDULE Response: "TEMPERED" ADDED TO WINDOW SCHEDULE Response: SPECIAL INSPECTIONS AGREEMENT TO BE FILLED OUT PRIOR TO PERMIT ISSUANCE Response: GEOTECH HAS PROVIDED LETTER - SEE DOCUMENT 1/16/18 Page:56 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Grades along the back of the garage extend as high as 8256.58' according to civils which is equivalent to Arch 111'-7". Foundation wall must extend 4" above finish grade where masonry veneer is used and 6" above grade elsewhere. Foundation plan shows top of wall at 103'6", revise it. (2015 IRC R404.1.6) Page:58 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: The living room Isokern fireplace and hearth extension must be supported entirely by non-combustible construction per the manufacturer's instructions. Revise framing plans as necessary. Page:59 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Revise structurals to account for the loads of the green roofs. Page:66 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:Crawlspace ventilation Author:nickt Color: The crawlspaces appear to be part of the thermal envelope. Provide conditioned air to the crawl per 2015 IRC R408.3 2.2 or ventilate per 2015 IRC R408.3 2.1 or 2015 IMC 406.1. Page:73 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: ERV must operate continuously at 104cfm or greater based on the square footage you have provided. Alternatively, you may choose an intermittent rate per four hour period that provides the equivalent (20 min/hour would equal 80min/4 hours which would require 312cfm). Ordinance 40, 2016. T.O. SLAB = 80'-312" T.O. SLAB = 91'-11" TYPICAL SLAB ON GRADE4" CONCRETE SLAB ON INSUL PER ARCH ONAPPROVED NATIVE OR PREPARED SUBGRADE PERGEOTECH REPORT. REINFORCE SLAB WITH6x6-W2.1xW2.1 WWF OR #3 @ 12"o.c EA WAY -CENTERED. PROVIDE 114" DEEP SAW-CUT CONTROLJOINTS @ 12'-0" o.c. MAX EACH WAY - TYP CONCRETE FOOTING SCHEDULEMARK SIZE REINFORCINGF2.0 2'-0" x 2'-0" x 10" THICK (2) #4 EA WAY AT BOTTOMF2.5 2'-6" x 2'-6" x 10" THICK (2) #5 EA WAY AT BOTTOMF3.0 3'-0" x 3'-0" x 12" THICK (4) #5 EA WAY AT BOTTOMF3.5 3'-6" x 3'-6" x 12" THICK (4) #5 EA WAY AT BOTTOMF4.0 4'-0" x 4'-0" x 12" THICK (5) #5 EA WAY AT BOTTOMF4.5 4'-6" x 4'-6" x 12" THICK (6) #5 EA WAY AT BOTTOMF5.0x6.5 5'-0" x 6'-6" x 12" THICK#5 @ 12"o.c. EA WAY TOP &BOTTOMFC16 1'-4" WIDE x 10" THICK CONT (2) #5 CONT, BOTFC24 2'-0" WIDE x 12" THICK CONT (3) #5 CONT, BOTFC30 2'-6" WIDE x 12" THICK CONT (3) #5 CONT, BOTFC36 3'-0" WIDE x 12" THICK CONT (3) #5 CONT, BOT F3.0 w/ BP PER 2/S5.02STL COL ABOVE T.O. WALL80'-4" T.O. WALL92'-0" T.O. FTG79'-712" T.O. FTG83'-712" T.O. FTG87'-712" T.O. FTG91'-3" T.O. FTG87'-712" 7S5.01 T.O. WALL99'-938"TYP U.N.O. T.O. WALL107'-0"T.O. LEDGE103'-0" T.O. WALL103'-6" T.O. LEDGE106'-6" T.O. LEDGE99'-338" T.O. LEDGE99'-338" T.O. WALL86'-912" T.O. FTG83'-712" T.O. FTG83'-712" T.O. FTG83'-712" T.O. FTG83'-712" T.O. LEDGE88'-1112" 6S5.01 ABOVESTL COL ABOVESTL COL ALL FLOOR DIAPHRAGMSSHALL BE COMPLETED PRIORTO BACKFILL PLACEMENTBEHIND FOUNDATION WALLS T.O. WALL86'-714" F2.5 F2.5 F2.5 F2.5 F2.5 F4.5 F4.5 ABOVESTL COL ABOVESTL COLF5.0x6.5 F3.0F2.5F2.5 F2.5F5.0x6.5 T.O. FTG79'-712" 2'-5" 8'-0" 5'-1" F2.5 F3.0 F3.0 F4.5F4.5 F4.0 F3.0 1'-4" TYP5S5.01 T.O. WALL100'-0"10" CONC BASEMENTWALL w/ #5 @ 12"o.c. EAWAY E.F. - TYP U.N.O.2'-134"HOLDOWN SCHEDULEMARKSIMPSONHOLDOWNANCHORSTUDCONNECTIONNo. OF STUDS DETAILH1 HDU2-SDS2.5 58"Ø HAS-E x 8"EMBED (6) 14"Ø x 212" SDS (2) 2x 10/S5.02H2 HDU8-SDS2.5 SSTB28 (20) 14"Ø x 212" SDS (3) 2x 11/S5.02H3 CS14 STRAP N/A SEE DETAIL (2) 2x 12/S5.02H4 CMSTC16 STRAP N/A SEE DETAIL (2) 2x 12/S5.02NOTES:1.REFER TO FRAMING PLANS FOR HOLDOWN LOCATIONS AND TYPES.2.SEE PLANS FOR BWP LOCATIONS AND EXTENTS. HOLDOWNS OCCUR AT ENDS OF BWP's, DENOTED ONPLAN AS:3.HOLDOWNS SHALL BE INSTALLED AT THE BASE OF THE WALL PANELS WHERE SPECIFIED, CONNECTINGTHE SPECIFIED SHEAR WALL EDGE STUD TO THE STRUCTURE BELOW.4.HOLDOWNS INSTALLED AT BASE OF WALL PANEL ABOVE ARE DENOTED ON PLAN AS: REFER TOPLAN ABOVE FOR SPECIFICATION.5.HOLDOWNS & ANCHOR BOLTS SHALL BE MANUFACTURER AND TYPE SPECIFIED OR APPROVED EQUAL. Hx F3.0 F2.0 8" CONC WINDOW WELLWALL w/ #5 @ 12"o.c. EAWAY CTRD - TYP U.N.O. FC30 - TYP U.N.O. FC30 - TYP U.N.O. FC24 TYP @ WINDOWWELL WALLS 16" CONC BASEMENT WALLw/ #5 @ 12"o.c. EA WAY E.F.TYP @ STONE VENEER LOC T.O. LEDGE99'-6"TYP U.N.O. CB OR (2) RPBZ POST BASE TYPCOL ABOVE w/RE: 9/S5.02 TYP U.N.O.BM POCKET 12" SQ CONC PEDESTALw/ (4) #5 VERT & #3 TIES@ 12"o.c. - TYP @ 12 12" x 24" CONC PEDESTALw/ (6) #5 VERT & #3 TIES @12"o.c. 1'-6" 1'-812"CONC PEDESTAL w/ (6) #5VERT & #3 TIES @ 12"o.c.12" SQ CONC PEDESTALw/ (4) #5 VERT & #3 TIES@ 12"o.c. - TYP @ 12 3'-2"2'-9"8'-612"2'-6"22'-11"7'-1014"21'-6"2'-914"13'-134"19'-212"612" 4'-114" 3'-1114" 16'-3" 7'-8" 8'-012" 16'-5" 14'-4" 11'-1014" T.O. FTG79'-712"TYP @ STL COL4'-114"3'-1114"16'-3" 7'-8"8'-012"16'-5" 14'-4"11'-1014"5'-414"512"212"714"6"10'-634"7'-414" 2'-712" 1'-3"9'-1134"11'-814"6'-214"2'-11"3'-314"1'-214"w/ BP PER 3/S5.02TYP U.N.O.STL COL ABOVE TYP8S5.01 3"1'-1034"7'-012"2'-934"914"9'-934"3'-114"FOUNDATION NOTES:1. REFER TO SHEET S0.0 FOR GENERAL NOTES.2. SEE FRAMING PLANS ABOVE FOR COLUMN & POST LOCATIONS & SIZES.3. CONCRETE FOOTINGS & THICKENED SLABS SHALL BE PER PLAN & SCHEDULE.4. ALL CONCRETE WALLS SHALL BE CENTERED ON FOOTINGS - U.N.O.5. SEE 3/S5.01 FOR ALL CONCRETE REINFORCING STANDARD HOOKS AND BENDS.6. PROPER SURFACE & BELOW GRADE PERIMETER DRAINAGE SHALL BE INSTALLED PER CIVIL &GEOTECHNICAL ENGINEERS TO RELIEVE FOUNDATION WALLS FROM HYDROSTATIC PRESSURES.7. REFER TO SHEET S5.01 FOR TYPICAL CONCRETE DETAILS.8. DO NOT PLACE BACKFILL AGAINST BASEMENT WALLS UNTIL ALL SUPPORTING ELEMENTS,INCLUDING MAIN LEVEL FLOOR SHEATHING, ARE IN PLACE AND SECURELY ANCHORED, ORUNTIL ADEQUATE TEMPORARY SHORING IS INSTALLED.9. ALL DIMENSIONS SHALL BE COORDINATED WITH ARCHITECTURAL DRAWINGS & FIELD VERIFIEDBY CONTRACTOR.10. SOILS CONDITIONS TO BE VERIFIED IN FIELD AT OPEN HOLE BY SOILS ENGINEER PERFOUNDATIONS NOTES ON S0.01.11. ANCHOR ALL SILL PLATES TO TOP OF CONCRETE WITH 58" DIAMETER ANCHOR BOLTS WITHMINIMUM 7" EMBEDMENT AT 6'-0" MAXIMUM, 2 ANCHORS MINIMUM PER PLATE, 4" FROM EACHEND, U.N.O.. REFER TO BWP SCHEDULE FOR ATYPICAL A.B.'S AND SPACINGS, REFER TO PLANSABOVE FOR LOCATIONS12. REFER TO PLANS AND SCHEDULE FOR ALL HOLDOWN ANCHORS BETWEEN FRAMING AND INTOCONCRETE. REFER TO PLANS ABOVE FOR SPECIFICATIONS.13. ISOLATE ALL SLABS-ON-GRADE FROM STRUCTURAL ELEMENTS WITH EXPANSION JOINTMATERIAL - U.N.O. )281'$7,213/$1 REVISIONS: DATE: 07/05/17 PROJECT # : 17.009CDRAWN BY : SECHECKED BY : SE STRUCTURAL DESIGNwww.evolvestruct.com1040 Main StreetCarbondale, CO 81623(970) 510-0773 LOT 7 THUNDERBOWLRESIDENCEASPEN, COLORADO)281'$7,213/$1SCALE: 316" = 1'-0"A N S1.01)281'$7,213/$1SCALE: 316" = 1'-0"A N s Grades along the backof the garage extendas high as 8256.58'according to civilswhich is equivalent toArch 111'-7".Foundation wall mustextend 4" above finishgrade where masonryveneer is used and 6"above gradeelsewhere. Foundationplan shows top of wallat 103'6", revise it.(2015 IRC R404.1.6) T.O. PLY = 99'-612"W21x93 - 2x NAILER TYP (T.O. STL = 99'-938" TYP U.N.O.)T.O. PLY = 100'-0"24" DP P.E. TRUSSES @ 24"o.c. - TYP @ MAIN U.N.O.118" T&G @ MAINFLR TYP W14x38 W14x22W10x22W14x30 W8x18W8x18(4) 2x6 W8x18 (4) 2x6 W12x40W12x30W14x34 - 2 SPAN CONT W14x43W14x34W14x34SIM TO 4/ S 5. 0 2 STL COL AB O V E W14x34 - 2 SPAN CONT TRUSS PANELBLK'G @ WALLABOVE - TYP ABOVESTL COL ABOVESTL COL TYP PER TRUSS DESIGNE RTRUSS H GR G.T. W12x30 - 2 SPAN CONT 512" STEP 6" MAX (4" MIN) CONC TOPPINGSLAB w/ #4 @ 12"o.c. EA WAYCTRD. w/ WATERPROOFING PERARCH OVER 118" T&G @ GARAGE(DL = 90 PSF MAX) 24" DP P.E. TRUSSES @ 24"o.c. - TYP @ MAIN U.N.O.W10x30 CONT - 2x NAILER TYP(T.O. STL = 97'-378")YP @ 2HSS 4x4 x 516 HSS 5x5x 38W8x18 or G.T.W8x18 or G.T.ALL FLOOR DIAPHRAGMSSHALL BE COMPLETED PRIORTO BACKFILL PLACEMENTBEHIND FOUNDATION WALLSW14x34 - 2 SPAN CONTABOVESTL COL HSS 5x5 x 38 RE: 4/S5.02 TYPHSS 5x5x38HSS 5x5x38 SPECIAL BRACED WALL PANEL SCHEDULE MARK SHEATHING EDGENAILING FIELDNAILING EDGESTUD /BLOCKING SILLBOLTING ATFOUNDATION SOLENAILING BWP1 716" PLYWOOD / OSB 8d @ 6" 8d @ 12"2x6 58"Ø AB @ 6'-0" 8d @ 6"o.c.BWP2 716" PLYWOOD / OSB 8d @ 6" 8d @ 12"2x6 58"Ø AB @ 4'-0" 16d @ 6"o.c.BWP3 716" PLYWOOD / OSB 8d @4" 8d @ 12"2x6 58"Ø AB @ 4'-0"16d @ 4"o.c.BWP4 716" PLYWOOD / OSB 8d @ 3" 8d @ 12"2x6 58"Ø AB @ 2'-0"16d @ 4"o.c.BWP5 716" PLYWOOD / OSB 8d @ 2" 8d @ 12" (2) 2x6 58" AB @ 1'-4" 16d @ 3"o.c. BWP3 BWP3 BWP3 BWP3 TYP PER T R U SS DESIGNERTRUSS HG R BWP4RE: 9/S5.02 TYP U.N.O.BM POCKET BM CONN RE:8/S5.02 TYP U.N.O. H2 H2 ROOF & FLOOR FRAMING NOTES: 1. REFER TO SHEET S0.0 FOR GENERAL NOTES AND DETAILS, INCLUDING:- FLOOR & ROOF SHEATHING PER 1/S0.01.- TYPICAL WALL FRAMING PER 2/S0.01.- ATTACHMENT OF MULTI-PLY COLUMNS & BEAMS PER 3/S0.01.- ROOF OVERFRAMING, HATCHED PER PLAN, PER 4/S0.01.- ALL TYPICAL FRAMING CONNECTIONS PER SCHEDULE ON S0.01.2. ALL COLUMNS SHOWN SHALL BE (2) 2x6, TYP - U.N.O.3. ALL BEARING WALL HEADERS SHALL BE (2) 2x10, TYP - U.N.O. ALL HEADERS SHALL BESUPPORTED BY TWO (2) TRIM STUDS & TWO (2) KING STUDS, TYP - U.N.O.4. ALL INTERIOR & EXTERIOR BEARING WALLS ARE 2x6 STUDS AT 16"o.c., TYP - U.N.O..5. ALL INTERIOR & EXTERIOR BEARING WALLS SHALL BE SHEATHED PER BRACED WALL PANELNOTES ON S0.01, TYP - U.N.O.a. SPECIAL BRACE WALL PANELS PER SCHEDULE AND PLAN.b. ANY WALL OPENINGS TO BE MODIFIED SHALL BE APPROVED BY THE S.E.O.R.6. ALL FRAMING MATERIAL EXPOSED TO WEATHER SHALL BE PRESERVATIVE PRESSURETREATED PER S0.01 - U.N.O.7. REFER TO S1.01 FOR ALL HOLDOWN ANCHORS.8. ALL DEAD LOAD SHALL BE APPLIED TO STRUCTURE PRIOR TO INSTALLING WINDOWS &DOORS.9. SHOP DRAWINGS FOR LARGE AREAS OF GLAZING SHALL BE PROVIDED TO S.E.O.R. FORREVIEW PRIOR TO FABRICATION TO COORDINATE CONNECTIONS & LOADING WITH MAINBUILDING STRUCTURE.10. ANCHOR ALL SILL PLATES TO TOP OF CONCRETE WITH 58" DIAMETER ANCHOR BOLTS WITHMINIMUM 7" EMBEDMENT AT 4'-0" MAXIMUM, 2 ANCHORS MINIMUM PER PLATE, 3" FROM EACHEND, U.N.O.. REFER TO BWP SCHEDULE FOR ATYPICAL A.B.'S AND SPACINGS, REFER TOPLANS ABOVE FOR LOCATIONS.11. ALL DIMENSIONS SHALL BE COORDINATED WITH ARCHITECTURAL DRAWINGS & FIELDVERIFIED BY CONTRACTOR. REVISIONS: STRUCTURAL DESwww.evolvestruct.com1040 Main StreetCarbondale, CO 81623(970) 510-0773 LOT 7 THUNDERBOWLRESIDENCEASPEN, COLORADOThe living roomIsokern fireplace andhearth extension mustbe supported entirelyby non-combustibleconstruction per themanufacturer'sinstructions. Reviseframing plans asnecessary. (3) 16" LVL (3)K(2)T5O.16" LVL x 8'-0" MIN TYP U.N.O.(2) 16" LVL H2.5 @ EA RAFTER& LOOKOUT - TYPU.N.O. a. SPECIAL BRACE WALL PANELS PER SCHEDULE AND PLAN.b. ANY WALL OPENINGS TO BE MODIFIED SHALL BE APPROVED BY THE S.E.O.R.6. ALL FRAMING MATERIAL EXPOSED TO WEATHER SHALL BE PRESERVATIVE PRESSURETREATED PER S0.01 - U.N.O.7. REFER TO S1.01 FOR ALL HOLDOWN ANCHORS.8. ALL DEAD LOAD SHALL BE APPLIED TO STRUCTURE PRIOR TO INSTALLING WINDOWS &DOORS.9. SHOP DRAWINGS FOR LARGE AREAS OF GLAZING SHALL BE PROVIDED TO S.E.O.R. FORREVIEW PRIOR TO FABRICATION TO COORDINATE CONNECTIONS & LOADING WITH MAINBUILDING STRUCTURE.10. ANCHOR ALL SILL PLATES TO TOP OF CONCRETE WITH 58" DIAMETER ANCHOR BOLTS WITHMINIMUM 7" EMBEDMENT AT 4'-0" MAXIMUM, 2 ANCHORS MINIMUM PER PLATE, 3" FROM EACHEND, U.N.O.. REFER TO BWP SCHEDULE FOR ATYPICAL A.B.'S AND SPACINGS, REFER TOPLANS ABOVE FOR LOCATIONS.11. ALL DIMENSIONS SHALL BE COORDINATED WITH ARCHITECTURAL DRAWINGS & FIELDVERIFIED BY CONTRACTOR. REVISIONS:LOT 7 THUNDERBOWLRESIDENCEASPEN, COLORADORevise structurals to account for theloads of the green roofs. FC1 FC2 GENERAL NOTES: 1. ALL DUCTWORK DIMENSIONS ARE SHOWN INSIDE TO INSIDE. 2. ALL INTERIOR SUPPLY AND RETURN DUCTWORK SHALL INCLUDE 1" LINERUNLESS OTHERWISE NOTED. ALL OUTSIDE AIR INTAKE AND ROUNDDUCTWORK SHALL BE WRAPPED WITH 1.5" THICK INSULATION UNLESSOTHERWISE NOTED. 1 1 10/10 (12/12) 12/10 (14/12) 10/10 (12/12) 12/10 (14/12)12/12 (14/14)12/12 (14/14)16/14 (18/16)12/12 (14/14)12/12 (14/14)14/12 (16/14)12/10 (14/12) The crawlspaces appear to be part of the thermal envelope. Provideconditioned air to the crawl per 2015 IRC R408.3 2.2 or ventilate per 2015IRC R408.3 2.1 or 2015 IMC 406.1. SEQUENCE OF OPERATION: THE MECHANICAL CONTROLS SHALL INTEGRATE WITH THE WHOLE PROPERTYCONTROL SYSTEM WHICH INCLUDES MONITORING AND CONTROL OF ALL BUILDINGSON THE PROPERTY. SPECIFIC POINTS OF INTEGRATION SHALL BE COORDINATEDWITH THE OWNER PRIOR TO FINALIZING THE CONTROL SYSTEM. A DDC SYSTEM ISREQUIRED TO MEET THE FOLLOWING SEQUENCE OF OPERATION AND INTEGRATEWITH THE HOUSE CONTROL SYSTEM.IT IS IMPERATIVE THAT THE CONTROL CONTRACTOR REVIEW THE DESIRED CONTROLSFUNCTIONS AND INTERFACE WITH THE OWNER PRIOR TO PURCHASING. THESEQUENCE BELOW DESCRIBES GENERAL FUNCTIONALITY REQUIREMENTS. USERINTERFACE OPTIONS, MODES OF OPERATIONS, AND CONTROLLABILITY MUST BECOORDINATED WITH THE OWNER. FAN COILS, RADIANT FLOORS & HUMIDIFIERS: THE FAN COILS SHALL BE CONTROLLED ACCORDING TO WALL MOUNTEDTEMPERATURE SENSORS. THE RADIANT ZONES SHALL BE CONTROLLED ACCORDINGTO WALL MOUNTED TEMPERATURE SENSORS AND, WHERE INDICATED, FLOORTEMPERATURE SENSORS. ALL SENSORS AND CONTROLS SERVING BOTH RADIANTZONES AND FAN COILS SHALL BE 2 STAGE HEATING, 1 STAGE COOLINGTHERMOSTATS. PROVIDE VARIABLE SPEED FANS ON ALL FAN COILS.FC-1, FC-2, FC-5, & FC-8:THE FAN COILS SHALL PROVIDE HEATING, COOLING, AND HUMIDIFICATION. ON ANYCALL FOR HEATING, THE ASSOCIATED 2-WAY HEATING VALVE SHALL OPEN TO MEETTHE SETPOINT. ON ANY CALL FOR COOLING, THE 3-WAY COOLING VALVE SHALL OPENTO MEET THE SETPOINT. COORDINATE MASTER/SLAVE SET-UP OF ZONE HEATING ANDCOOLING WITH ARCHITECT AND REVIEW WITH ENGINEER PRIOR TO INSTALLATION.THE HUMIDIFIER SHALL BE CONTROLLED ACCORDING TO A HUMIDITY SENSOR AT THERETURN GRILLE. ON A CALL FOR HUMIDITY, THE FAN SHALL START AND THEHUMIDIFIER SHALL MODULATE TO MEET THE SETPOINT. THE HUMIDIFIER SHALL BELOCKED OUT DURING COOLING.FC-3, FC-6, FC-7 & FC-9:THE FAN COILS SHALL BE ZONED AND PROVIDE HEATING, COOLING, ANDHUMIDIFICATION. ON ANY CALL FOR HEATING, THE ASSOCIATED ZONE DAMPER SHALLOPEN AND THE 2-WAY HEATING VALVE SHALL OPEN TO MEET THE SETPOINT. ON ANYCALL FOR COOLING, THE ASSOCIATED ZONE DAMPER SHALL OPEN AND THE 3-WAYCOOLING VALVE SHALL OPEN TO MEET THE SETPOINT.THE HUMIDIFIER SHALL BE CONTROLLED ACCORDING TO A HUMIDITY SENSOR AT THERETURN GRILLE. ON A CALL FOR HUMIDITY, THE FAN SHALL START, ALL ZONEDAMPERS SHALL OPEN, AND THE HUMIDIFIER SHALL MODULATE TO MEET THESETPOINT. THE HUMIDIFIER SHALL BE LOCKED OUT DURING COOLING. FC-4:THE FAN COIL SHALL PROVIDE HEATING, COOLING, HUMIDIFICATION, AND KITCHENMAKE UP AIR. ON A CALL FOR HEATING, ASSOCIATED PUMP SHALL START AND THE3-WAY HEATING VALVE SHALL MODULATE TO PROVIDE 95°F (ADJ.) DISCHARGE AIRTEMPERATURE AND THE FAN SHALL RUN. ON A CALL FOR COOLING, THE 3-WAYCOOLING VALVE SHALL OPEN TO PROVIDE 55°F (ADJ.) DISCHARGE AIR TEMPERATUREAND THE FAN SHALL RUN.DURING KITCHEN HOOD OPERATION, MD-1 SHALL PARTIALLY CLOSE AND MD-2 SHALLOPEN TO PROVIDE 1200 CFM OF OUTSIDE AIR (THE QUANTITY OF KITCHEN AIREXHAUST SHALL BE MEASURED PRIOR TO SETTING THE DAMPER AIRFLOW SETTINGS.ADJUST CFM VALUES AS REQUIRED TO BALANCE KITCHEN EXHAUST.) WHEN THESPACE SETPOINT IS SATISFIED, THE HEATING VALVE SHALL MODULATE TO PROVIDE70°F (ADJ.) DISCHARGE AIR TEMPERATURE AND COOLING SHALL BE LOCKED OUT. IFTHERE IS A CALL FOR HEATING, THE HEATING VALVE SHALL MODULATE TO PROVIDE95°F (ADJ.) DISCHARGE AIR TEMPERATURE.RADIANT ZONES:RADIANT ZONES SHALL BE CONTROLLED ACCORDING TO SPACE TEMPERATURESENSORS AND FLOOR TEMPERATURE SENSORS. ON A CALL FOR FIRST STAGEHEATING, THE ASSOCIATED ZONE VALVE(S) SHALL OPEN FULLY TO MEET THE SPACESETPOINT. ALL ZONES SHALL BE CAPABLE OF MAINTAINING A MINIMUM AND/ORMAXIMUM FLOOR TEMPERATURE SETPOINT, AND THE ASSOCIATED ZONE VALVE(S)SHALL OPEN/CLOSE TO MAINTAIN THAT TEMPERATURE. COORDINATE MAXIMUM WOODFLOOR TEMPERATURE WITH MANUFACTURER. ERV-1:THE ENERGY RECOVERY UNITS (ERV) SHALL BE CONTROLLED BY A PERCENTAGETIMER AND SHALL OPERATE 20 MINS. (ADJ.) EACH HOUR. PROVIDE POINT OF USECONTROLS. PRIOR TO THE ERV STARTING, THE ASSOCIATED MOTORIZED DAMPERSSHALL OPEN.HEATING AND COOLING PLANTSB-1, B-2, WATER HEATERS:THE BOILERS AND THEIR ASSOCIATED BOILER PUMPS SHALL STAGE AND ROTATE TOPROVIDE HEATING, SNOWMELT & DOMESTIC HOT WATER. UPON A CALL FOR HEATINGTHE BOILERS SHALL FIRE BASED UPON AN OUTDOOR RESET SCHEDULE WITH AMAXIMUM TEMPERATURE AT THE BOILER SUPPLY WATER TEMPERATURE SENSOR OF140°F (ADJ.). UPON A CALL FOR DOMESTIC WATER HEATING, THE SNOWMELT PUMPSHALL STOP, THE WATER HEATER PUMP SHALL START, AND THE BOILERS SHALLPROVIDE 180°F (ADJ.) SUPPLY WATER UNTIL THE DOMESTIC HEATING CALL ISSATISFIED. HEATING WATER:THE VARIABLE SPEED HEATING PUMPS SHALL OPERATE IN DUTY/STANDBY MODE.UPON ANY CALL FOR HEATING, EITHER PUMP SHALL START AND VARY ITS SPEEDACCORDING TO THE GRUNDFOS AUTOADAPT MODE. THERMOSTATIC MIXING-VALVESHALL LIMIT TEMPERATURE TO A MAXIMUM OF 130°F.SNOWMELT:THE SNOWMELT SYSTEM SHALL BE CONTROLLED ACCORDING TO AN OUTDOORTEMPERATURE SENSOR AND A SLAB SNOW/ICE SENSOR. WHEN THE OUTDOORTEMPERATURE IS BELOW 35°F, THE SNOWMELT SYSTEM SHALL BE ENABLED AND THESNOWMELT PUMPS SHALL CYCLE TO MAINTAIN A SLAB TEMPERATURE OF 28°F. IF THESYSTEM IS ENABLED AND MOISTURE IS SENSED ON THE SLAB, THE SNOWMELT PUMPSSHALL CYCLE TO MAINTAIN A SLAB TEMPERATURE OF 38°F.CHILLED WATER SYSTEM, CH-1:UPON A CALL FOR COOLING FROM A FAN COIL OR WINE CONDITIONING UNIT, THECHILLED WATER SYSTEM SHALL BE ENABLED, THE CHILLED WATER PUMP SHALL RUN,AND THE CHILLER COMPRESSORS SHALL CYCLE TO MAINTAIN A 44°F CHILLED WATERSUPPLY TEMPERATURE.VENTILATION:GARAGE EXHAUST FAN: THE GARAGE EXHAUST FAN EF-3 SHALL BE INTERLOCKED WITH THE GARAGE DOORSAND A CARBON MONOXIDE SENSOR. WHENEVER EITHER GARAGE DOOR CLOSES THEFAN SHALL RUN FOR 15 MINS (ADJ.). WHEN CARBON MONOXIDE IS DETECTED ABOVEACCEPTABLE LIMITS, FAN SHALL RUN UNTIL LEVELS DROP BELOW ACCEPTABLELIMITS.BATH EXHAUST FANS:THE BATH EXHAUST FANS SHALL BE CONTROLLED BY WALL MOUNTED SWITCHES. of www.aec-vail.coPO Box 8489, 40801 US Hwy 6 & 24, Ste 21Mechanical, Electrical & Lighting DArchitectural EngineeringTelephone: 970-748-8Drawn By:Checked By: DATE:ISSUE: 07-13-17PERMIT AEC PROJECT #:LOT 7 THUNDERBOWLASPEN HIGHLANDS, CO17032.00An Office with LEED™ AccrediteFOR PERMIT ONLY   City of Aspen Received07/26/17Building Department ERV must operate continuously at 104cfm orgreater based on the square footage you haveprovided. Alternatively, you may choose anintermittent rate per four hour period that providesthe equivalent (20 min/hour would equal 80min/4hours which would require 312cfm). Ordinance40, 2016. Response: STRUCTURAL DRAWINGS HAVE BEEN REVISED TO SHOW CONCRETE 6" ABOVE FINISHED GRADE SEE SHT S1.01 Response: STRUCTURAL DRAWING HAS BEEN REVISED. ARCHITECTURAL SECTION HAS BEEN ADDED TO SHOW COMPLIANCE SEE SHEETS: S1.03 AND A-7.10 REFER TO REVISED GENERAL NOTES IN STRUCTURAL SET (S0.01). THE GREEN ROOF IS INCLUDED IN THE LOAD. Response: REVISED MECHANICAL PLANS PROVIDE CONDITIONED AIR TO THE CRAWL SPACE Response: REFER TO MECHANICAL FOR REVISED DESIGN SEE SHEET: M-111 SEE SHEET: M-601 1/16/18 Page:73 File Name: FULL PERMIT SET.395 THUNDERBOWL.2017.07.13.pdf Subject:PlanCheck Author:nickt Color: Provide snowmelt information indicating tube spacing, loops, and zones. If you depict the snowmelt area square footage, be sure to coordinate with other drawings and documents. ATION: RATE WITH THE WHOLE PROPERTYORING AND CONTROL OF ALL BUILDINGSNTEGRATION SHALL BE COORDINATEDE CONTROL SYSTEM. A DDC SYSTEM ISENCE OF OPERATION AND INTEGRATE TRACTOR REVIEW THE DESIRED CONTROLSNER PRIOR TO PURCHASING. THEUNCTIONALITY REQUIREMENTS. USERNS, AND CONTROLLABILITY MUST BE S: CORDING TO WALL MOUNTEDONES SHALL BE CONTROLLED ACCORDINGRS AND, WHERE INDICATED, FLOORND CONTROLS SERVING BOTH RADIANTHEATING, 1 STAGE COOLINGFANS ON ALL FAN COILS. OOLING, AND HUMIDIFICATION. ON ANYY HEATING VALVE SHALL OPEN TO MEETG, THE 3-WAY COOLING VALVE SHALL OPENSTER/SLAVE SET-UP OF ZONE HEATING ANDTH ENGINEER PRIOR TO INSTALLATION. CCORDING TO A HUMIDITY SENSOR AT THETHE FAN SHALL START AND THEE SETPOINT. THE HUMIDIFIER SHALL BE VIDE HEATING, COOLING, ANDG, THE ASSOCIATED ZONE DAMPER SHALLLL OPEN TO MEET THE SETPOINT. ON ANYE DAMPER SHALL OPEN AND THE 3-WAYSETPOINT. CCORDING TO A HUMIDITY SENSOR AT THETHE FAN SHALL START, ALL ZONER SHALL MODULATE TO MEET THEKED OUT DURING COOLING. FC-4: THE FAN COIL SHALL PROVIDE HEATING, COOLING, HUMIDIFICATION, AND KITCHENMAKE UP AIR. ON A CALL FOR HEATING, ASSOCIATED PUMP SHALL START AND THE3-WAY HEATING VALVE SHALL MODULATE TO PROVIDE 95°F (ADJ.) DISCHARGE AIRTEMPERATURE AND THE FAN SHALL RUN. ON A CALL FOR COOLING, THE 3-WAYCOOLING VALVE SHALL OPEN TO PROVIDE 55°F (ADJ.) DISCHARGE AIR TEMPERATUREAND THE FAN SHALL RUN. DURING KITCHEN HOOD OPERATION, MD-1 SHALL PARTIALLY CLOSE AND MD-2 SHALLOPEN TO PROVIDE 1200 CFM OF OUTSIDE AIR (THE QUANTITY OF KITCHEN AIREXHAUST SHALL BE MEASURED PRIOR TO SETTING THE DAMPER AIRFLOW SETTINGS.ADJUST CFM VALUES AS REQUIRED TO BALANCE KITCHEN EXHAUST.) WHEN THESPACE SETPOINT IS SATISFIED, THE HEATING VALVE SHALL MODULATE TO PROVIDE70°F (ADJ.) DISCHARGE AIR TEMPERATURE AND COOLING SHALL BE LOCKED OUT. IFTHERE IS A CALL FOR HEATING, THE HEATING VALVE SHALL MODULATE TO PROVIDE95°F (ADJ.) DISCHARGE AIR TEMPERATURE. RADIANT ZONES: RADIANT ZONES SHALL BE CONTROLLED ACCORDING TO SPACE TEMPERATURESENSORS AND FLOOR TEMPERATURE SENSORS. ON A CALL FOR FIRST STAGEHEATING, THE ASSOCIATED ZONE VALVE(S) SHALL OPEN FULLY TO MEET THE SPACESETPOINT. ALL ZONES SHALL BE CAPABLE OF MAINTAINING A MINIMUM AND/ORMAXIMUM FLOOR TEMPERATURE SETPOINT, AND THE ASSOCIATED ZONE VALVE(S)SHALL OPEN/CLOSE TO MAINTAIN THAT TEMPERATURE. COORDINATE MAXIMUM WOODFLOOR TEMPERATURE WITH MANUFACTURER. ERV-1: THE ENERGY RECOVERY UNITS (ERV) SHALL BE CONTROLLED BY A PERCENTAGETIMER AND SHALL OPERATE 20 MINS. (ADJ.) EACH HOUR. PROVIDE POINT OF USECONTROLS. PRIOR TO THE ERV STARTING, THE ASSOCIATED MOTORIZED DAMPERSSHALL OPEN. HEATING AND COOLING PLANTS B-1, B-2, WATER HEATERS: THE BOILERS AND THEIR ASSOCIATED BOILER PUMPS SHALL STAGE AND ROTATE TOPROVIDE HEATING, SNOWMELT & DOMESTIC HOT WATER. UPON A CALL FOR HEATINGTHE BOILERS SHALL FIRE BASED UPON AN OUTDOOR RESET SCHEDULE WITH AMAXIMUM TEMPERATURE AT THE BOILER SUPPLY WATER TEMPERATURE SENSOR OF140°F (ADJ.). UPON A CALL FOR DOMESTIC WATER HEATING, THE SNOWMELT PUMPSHALL STOP, THE WATER HEATER PUMP SHALL START, AND THE BOILERS SHALLPROVIDE 180°F (ADJ.) SUPPLY WATER UNTIL THE DOMESTIC HEATING CALL ISSATISFIED. HEATING WATER: THE VARIABLE SPEED HEATING PUMPS SHALL OPERATE IN DUTY/STANDBY MODE.UPON ANY CALL FOR HEATING, EITHER PUMP SHALL START AND VARY ITS SPEEDACCORDING TO THE GRUNDFOS AUTOADAPT MODE. THERMOSTATIC MIXING-VALVESHALL LIMIT TEMPERATURE TO A MAXIMUM OF 130°F. SNOWMELT: THE SNOWMELT SYSTEM SHALL BE CONTROLLED ACCORDING TO AN OUTDOORTEMPERATURE SENSOR AND A SLAB SNOW/ICE SENSOR. WHEN THE OUTDOORTEMPERATURE IS BELOW 35°F, THE SNOWMELT SYSTEM SHALL BE ENABLED AND THESNOWMELT PUMPS SHALL CYCLE TO MAINTAIN A SLAB TEMPERATURE OF 28°F. IF THESYSTEM IS ENABLED AND MOISTURE IS SENSED ON THE SLAB, THE SNOWMELT PUMPSSHALL CYCLE TO MAINTAIN A SLAB TEMPERATURE OF 38°F. CHILLED WATER SYSTEM, CH-1: UPON A CALL FOR COOLING FROM A FAN COIL OR WINE CONDITIONING UNIT, THECHILLED WATER SYSTEM SHALL BE ENABLED, THE CHILLED WATER PUMP SHALL RUN,AND THE CHILLER COMPRESSORS SHALL CYCLE TO MAINTAIN A 44°F CHILLED WATERSUPPLY TEMPERATURE. VENTILATION: GARAGE EXHAUST FAN: THE GARAGE EXHAUST FAN EF-3 SHALL BE INTERLOCKED WITH THE GARAGE DOORSAND A CARBON MONOXIDE SENSOR. WHENEVER EITHER GARAGE DOOR CLOSES THEFAN SHALL RUN FOR 15 MINS (ADJ.). WHEN CARBON MONOXIDE IS DETECTED ABOVEACCEPTABLE LIMITS, FAN SHALL RUN UNTIL LEVELS DROP BELOW ACCEPTABLELIMITS. BATH EXHAUST FANS: THE BATH EXHAUST FANS SHALL BE CONTROLLED BY WALL MOUNTED SWITCHES.www.aec-vail.cPO Box 8489, 40801 US Hwy 6 & 24, SteMechanical, Electrical & LightinArchitectural EngineerinTelephone: 970-74Drawn By:Checked By: DATE:ISSUE: 07-13-17 PERMIT AEC PROJECT #:LOT 7 THUNDERBOWLASPEN HIGHLANDS, CO17032.00An Office with LEED™ Accred  Provide snowmelt informationindicating tube spacing, loops,and zones. If you depict thesnowmelt area square footage,be sure to coordinate with otherdrawings and documents. Response: SNOWMELT HAS BEEN REMOVED FROM THIS PERMIT APPLICATION 1/16/18