Loading...
HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0153.2017 (24).ARBKGrading and Drainage Report Prepared for David Johnson Architects 395 Thunderbowl Lane, aspen P.O. Box 575 Woody Creek, Colorado 81656 970-309-7130 Prepared By Josh Rice, P.E. July, 05 2017 Revised January, 11 2018 1/16/18 Reviewed by Engineering 04/25/2018 6:25:09 PM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. i I hereby affirm that this report and the accompanying plans for the drainage improvements of Lot 7 Block A, The Aspen Highlands Willage P.U.D. was prepared by me for the owners thereof in accordance with the provisions of the City of Aspen Urban Runoff Management Plan and approved variances and exceptions listed herein. I understand that it is the policy of the City that the City of Aspen does not and will not assume liability for drainage facilities designed by others. Josh Rice, P.E. License No. 1/11/2018 1/16/18 ii 1. INTRODUCTION ................................................................................................................................. 1 2. GENERAL SITE DESCRIPTION ....................................................................................................... 1 2.1 Existing Condition ..................................................................................................................................... 1 2.2 Proposed Condition ................................................................................................................................... 2 2.2.1 Determination of Major/Minor .................................................................................................................... 2 2.3 Drainage Basins ......................................................................................................................................... 2 2.3.1 Historical Basin EB : 1 ................................................................................................................................... 5 2.3.1 Proposed Basin ............................................................................................................................................. 5 3. STORMWATER BMPS AND ROUTING ......................................................................................... 5 3.1 General ..................................................................................................................................................... 6 3.1.1 Detention Calculation .................................................................................................................................. 6 3.1.2 Outlet Calculation ........................................................................................................................................ 6 3.2 Pipe Calculations ....................................................................................................................................... 7 3.2.1 Pipe A ........................................................................................................................................................... 7 3.2.2 Pipe B ........................................................................................................................................................... 7 3.3 Inlet Calculations ....................................................................................................................................... 7 3.3.1 Operation and maintenance ........................................................................................................................ 8 APPENDIX A--NRCS SOILS REPORT ................................................................................................. 1 APPENDIX B--FEMA FIRM MAP ......................................................................................................... 2 APPENDIX C--PLAN SET ....................................................................................................................... 3 APPENDIX D--HYDROLOGIC CALCULATIONS ............................................................................... 4 APPENDIX E--HYDRAULIC CALCULATIONS .................................................................................. 5 APPENDIX F—DETENTION CALCULATIONS ................................................................................. 6 1/16/18 1. Introduction This report was prepared to meet the requirements of a City of Aspen Engineering Department Grading and Drainage Report for a Major Design. The report was prepared for a single-family housing project at 395 Thunderbowl Ln, Aspen, Colorado, 81611 (the “Site”). Facilities providing water quality capture volume and detention have been designed in this report and the associated plan. 2. General Site Description 2.1 Existing Condition The property was platted as Lot 7 Block A, The Aspen Highlands Willage P.U.D. Based on the topograph- ical improvement survey, the lot area is approximately 30,198 square feet. The Site is located near the Aspen Highlands Ski Resort (see Figure 1). The soils are described by the NRCS as, “Yeljack-Callings complex, 12 to 25 percent slopes” (see Appendix A). The hydrologic soil group is “C.” The lot is currently vacant. Figure 1. 395 Thunderbowl Ln, Aspen Vicinity Map (Source: maps.google.com) The site is located well away from all major drainage ways and is not located within the floodplain bound- aries the Maroon Creek. The Site is located within Zone X, as shown and described by FEMA (see FIRM Map, Appendix B.) 1/16/18 2 2.2 Proposed Condition A new single-family structure will be constructed on the vacant lot. The existing building will be demol- ished. 2.2.1 Determination of Major/Minor The Urban Runoff Management Plan (the “URMP”) has two controlling triggers when determining the permit requirements: interior demolition and exterior disturbed area. Based on these two triggers, Woody Creek Engineering (“WCE”) has determined that water quality capture volume (“WQCV”) and detention is required for the entire property. The Site is located on a hill that slopes to the North at 12%. Drainage basins are delineated on Plan Sheet C.1 (Appendix C, C.1). The basins are described in the following sections. The drainage issues and WQCV treatment BMPs are also described. 2.3 Drainage Basins Both Historical and proposed basins are described below. Table 1, below, describes the impervious area, pervious area, total area, percent imperviousness, flow path length, basin slope, runoff coefficients for the minor (5-yr) and major (100-yr) storm events and runoff flowrates for the minor (5-yr) and major (100-yr) storm events. Although the Basins are delineated on Plan Sheet C.1 (Appendix C, C.1), they are also provided in Figure No. 2 and 3, below. Historical peak flows for the 5-year and 100-year events were evaluated for the Site using a time of con- centration based on the flow path length and slope. Table 1. Basin Information BASIN NO. TOTAL BASIN AREA (ACRES) IMPERVIOUS AREA (ACRES) % IMPERVIOUS RUNOFF COEF. 5YR RUNOFF COEF. 100YR FLOW PATH LENGTH (FT) FLOW PATH SLOPE (FT/FT) PEAK FLOW 5YR (CFS) PEAK FLOW 100YR (CFS) PB:1.0 0.203 0.023 0.11 0.22 0.53 156.00 0.10 0.111 0.526 PB:2 0.025 0.000 0.00 0.15 0.50 5.00 0.50 0.012 0.079 PB:3 0.004 0.004 1.00 0.90 0.96 5.00 0.50 0.012 0.024 PB:4 0.010 0.000 0.00 0.15 0.50 5.00 0.50 0.005 0.033 PB:5 0.028 0.028 1.00 0.90 0.96 5.00 0.50 0.083 0.169 PB:6 0.001 0.001 1.00 0.90 0.96 5.00 0.50 0.003 0.008 PB:7 0.012 0.000 0.00 0.15 0.50 5.00 0.50 0.006 0.037 PB:8 0.004 0.004 1.00 0.90 0.96 5.00 0.50 0.010 0.021 PB:9 0.017 0.003 0.20 0.26 0.55 5.00 0.50 0.014 0.010 PB:10 0.007 0.007 1.00 0.90 0.96 5.00 0.50 0.021 0.042 PB:11 0.002 0.002 1.00 0.90 0.96 5.00 0.50 0.006 0.012 PB:12 0.010 0.008 0.82 0.64 0.76 5.00 0.50 0.022 0.383 PB:13 0.015 0.015 0.00 0.15 0.50 5.00 0.50 0.007 0.047 PB:1.1 0.087 0.003 0.03 0.17 0.51 113.00 0.14 0.042 0.240 PB:1.2 0.033 0.002 0.05 0.18 0.52 63.00 0.16 0.020 0.106 PB:1.3 0.009 0.000 0.00 0.15 0.50 31.00 0.19 0.004 0.028 PB:1.4 0.017 0.000 0.02 0.16 0.51 46.00 0.22 0.009 0.055 PB:1.5 0.031 0.015 0.50 0.40 0.60 39.00 0.01 0.034 0.098 PB:1.6 0.046 0.046 1.00 0.90 0.96 10.00 0.02 0.136 0.278 PB:1.7 0.011 0.000 0.04 0.15 0.50 25.00 0.36 0.005 0.035 PB:1.8 0.016 0.016 1.00 0.90 0.96 42.00 0.08 0.047 0.097 PB:1.9 0.105 0.007 0.07 0.19 0.52 92.00 0.07 0.053 0.281 1/16/18 3 Figure 2. Historical Basins 1/16/18 4 Figure 3. Proposed Basins 1/16/18 5 2.3.1 Historical Basin EB : 1 Historical Basin EB : 1 slopes to the north at 10% and encompasses the entire lot, as shown in Figure 2. The basin developed a historical 100-yr flowrate of 1.485 cfs. Refer to Appendix D for additional infor- mation. 2.3.1 Proposed Basin The flowpaths of the proposed basins are described in Table 1. Basin Information and Table 2. Basin Routing. Table 2. Basin Routing 3. Stormwater BMPs and Routing Low impact design has been utilized where possible to provide WQCV and detention. 9 Principles 1. Consider stormwater quality needs early in the design process. The architect and owner considered stormwater requirements early in the process. 2. Use the entire site when planning for stormwater quality treatment. Where possible, overland conveyance was utilized to increase the time stromwater is in contact with natural systems. 3. Avoid unnecessary impervious areas. SUB-Basin ID Path 1 Path 2 Path 3 Path 4 Path 5 Path 6 Path 7 Final Basin ID WQ BMP ID PB:1.0 Sheet Flow Rain Garden PB:1.0 Rain Garden PB:1.1 Inlet 5 Pipe B Rain Garden PB:1.0 Rain Garden PB:1.2 Inlet 1 Pipe A Rain Garden PB:1.0 Rain Garden PB:1.3 Inlet 2 Pipe A Rain Garden PB:1.0 Rain Garden PB:1.4 Inlet 3 Pipe A Rain Garden PB:1.0 Rain Garden PB:1.5 Inlet 7 Pipe B Rain Garden PB:1.0 Rain Garden PB:1.6 Inlet 6 Pipe B Rain Garden PB:1.0 Rain Garden PB:1.7 Inlet 4 Pipe A Rain Garden PB:1.0 Rain Garden PB:1.8 Inlet 6 Pipe B Rain Garden PB:1.0 Rain Garden PB:2 Roof Drain 8 Inlet 8 Pipe B Rain Garden PB:1.0 Rain Garden PB:3 Roof Drain 7 Driveway Trench Drain Pipe B Rain Garden PB:1.0 Rain Garden PB:4 PB:2 Roof Drain 8 Inlet 8 Pipe B Rain Garden PB:1.0 Rain Garden PB:5 (50%)DS 1 Inlet 10 Pipe D Pipe A Rain Garden PB:1.0 Rain Garden PB:5 (50%)DS 2 Inlet 9 Pipe C Pipe B Rain Garden PB:1.0 Rain Garden PB:6 Roof Drain 1 Inlet 10 Pipe D Pipe A Rain Garden PB:1.0 Rain Garden PB:7 PB:9 PB:5 DS 1 Inlet 10 Pipe D Pipe A Rain Garden PB:1.0 Rain Garden PB:8 Roof Drain 2 Lambs Tongue 1 Inlet 4 Pipe A Rain Garden PB:1.0 Rain Garden PB:9 Roof Drain 3 Lambs Tongue 1 Inlet 4 Pipe A Rain Garden PB:1.0 Rain Garden PB:10 Roof Drain 6 Driveway Trench Drain Pipe B Rain Garden PB:1.0 Rain Garden PB:11 Roof Drain 9,10 Inlet 8 Pipe B Rain Garden PB:1.0 Rain Garden PB:12 Roof Drain 4,5 Driveway Trench Drain Pipe B Rain Garden PB:1.0 Rain Garden PB:13 Roof Drain 11 Driveway Trench Drain Pipe B Rain Garden PB:1.0 Rain Garden 1/16/18 6 Impervious areas were reduced where acceptable to the owner and the design team. 4. Reduce runoff rates and volumes to more closely match natural conditions. The proposed peak runoff rates are no greater than historical runoff rates. The historical flow paths are followed. 5. Integrate stormwater quality management and flood control. Through the use of onsite BMPs, stormwater quality management and flood control are integrated in the project. 6. Develop stormwater quality facilities that enhance the site, the community and the environment. The site, community and the environment are enhanced by reducing the amount of sediment and other river pollutants conveyed to the stream system. Hopefully, the use of these stormwater BMPs on this property and throughout the community will improve the water quality of the Roar- ing Fork River and its tributaries. 7. Use a treatment train approach. A treatment train approach is not appropriate for this site. 8. Design sustainable facilities that can be safely maintained. The stormwater BMPs located onsite can be easily and safely maintained and are readily accessi- ble. 9. Design and maintain facilities with public safely in mind. Elevation drops to stormwater BMPs are minimal and designed with public safely in mind. 3.1 General Low impact design has been utilized where possible to provide WQCV and detention. Basin Routing is described in Table 2, above. 3.1.1 Detention Calculation To calculate water quality requirements, WCE calculated the total area of the basins, the impervious area of the basins, and time of concentration of the basins. Overall, the basins total area equals 0.693 acres, while the impervious area equals 0.212. The time of concentration for existing basins was found to be 11.27 minutes. Based on an overall imperviousness of 27% percent, the WQCV in watershed inches is 0.06 in (see Ap- pendix D). In terms of volume, the WQCV over the tributary area of 0.693 acres is 151 cf (0.06 ac X 43560 sf/ac X 0.065 in X 1 ft / 12 in). The proposed grading of the site, as well as pipe networks, route runoff into the rain garden along the north end of the lot. This area provides 484.8 cf of detention ((10ft X 2ft /2)X 48.48ft), which is adequate for the detention required for the 100 year storm (425 cf). 3.1.2 Outlet Calculation In order to drain the 484.8 cf of detention a weir will be placed on the north end of the detention area. The weir will allow for detained water to be released at the historical 100-year storm rate of 1.518 cfs. Thus, the weir will have a bottom length of 0.295 ft to allow for a flow of 1.507 cfs at a head of 1.33 ft. In addi- tion, the outflow velocity will be 2.51 ft/s. For more information, refer to Appendix D. 1/16/18 7 3.2 Pipe Calculations Two pipes will be installed in order to route runoff to the Rain Garden. Each pipe is described below. 3.2.1 Pipe A Pipe A captures runoff from Inlets 1, 2, 3, 4, and DS Connect 1. Inlets 1-4 drain directly to Pipe A, DS Connect 1 transports roof runoff to Pipe A. Inlet 1 collects a flow of 0.028 cfs, which is discharged to a 6- in PVC pipe set at 4%. This pipe section has a capacity of 1.188 cfs. Inlets 2 and 3 collect another 0.055 cfs for a total flow of 0.083 cfs. This is fed into another section of 6-in PVC pipe laid at 4%, with a flow capacity of 1.188 cfs. Inlet 4 collects 0.056 cfs for a total of 0.139 cfs, which is carried by a 6-in PVC pipe at 4%. DS Connect 1 collects 0.055 cfs for a total of 0.194 cfs, which is carried by a 6-in PVC pipe set at 0.76%, with a resulting flow capacity of 0.518 cfs. Pipe A discharges to a Scour Stop mat at 2.76 ft/s before flowing via swale into the bottom of the Rain Garden. See Appendix E for Pipe calculations. 3.2.2 Pipe B Pipe B captures runoff from the driveway Trench Drain, Inlets 5 and 6, and DS Connect 2. The Trench Drain, and Inlets 5 and 6 drain directly to Pipe B, while DS Connect 2 transports roof runoff to Pipe B. The Trench Drain collects the majority of on-site flows totaling 1.217 cfs before discharging to a 10-in PVC pipes laid at 0.49%. Pipe B is laid at 0.49% for its entire length. It has a flow capacity of 1.623 cfs. Inlets 5 and 6 cfs collect aother 0.11 cfs of runoff for a total of 1.327. DS Connect 2 collects 0.112 cfs, for a total flow of 1.439 cfs. Pipe B discharges to a Scour Stop mat at 3.38 ft/s before flowing into the bottom of the Rain Garden. See Appendix E for Pipe calculations. 3.3 Inlet Calculations Six inlets and one trench drain will be installed in order to route runoff to the Rain Garden. Each inlet or trench drain provide capacity for the tributary 100-year runoff rate with a factor of safety of 2.0. A sum- mary has been provided in Table 3. Table 3. Inlet Properties 1/16/18 8 3.3.1 Operation and maintenance Table 4. presents the recommended maintenance procedures for rain gardens as found in Table 8.12 of the URMP. Table 4. Maintenance recommendations (URMP Table 8.12) 1/16/18 Appendix A--NRCS Soils Report 1/16/18 United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties Natural Resources Conservation Service June 20, 2017 1/16/18 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 1/16/18 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 1/16/18 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 Soil Map.................................................................................................................. 8 Soil Map................................................................................................................9 Legend................................................................................................................10 Map Unit Legend................................................................................................12 Map Unit Descriptions........................................................................................ 12 Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties................................................................................................... 14 14—Callings-Yeljack complex, 25 to 65 percent slopes..............................14 117—Yeljack-Callings complex, 12 to 25 percent slopes............................15 References............................................................................................................18 4 1/16/18 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 1/16/18 scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and Custom Soil Resource Report 6 1/16/18 identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 7 1/16/18 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 1/16/18 9 Custom Soil Resource Report Soil Map 43384204338430433844043384504338460433847043384804338490433850043385104338520433853043385404338420433843043384404338450433846043384704338480433849043385004338510433852043385304338540340010 340020 340030 340040 340050 340060 340070 340080 340090 340100 340010 340020 340030 340040 340050 340060 340070 340080 340090 340100 39° 10' 53'' N 106° 51' 8'' W39° 10' 53'' N106° 51' 4'' W39° 10' 49'' N 106° 51' 8'' W39° 10' 49'' N 106° 51' 4'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 30 60 120 180 Feet 0 5 10 20 30 Meters Map Scale: 1:622 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. 1/16/18 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties Survey Area Data: Version 7, Sep 22, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 12, 2011—Sep 22, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background Custom Soil Resource Report 10 1/16/18 MAP LEGEND MAP INFORMATION imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 11 1/16/18 Map Unit Legend Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties (CO655) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 14 Callings-Yeljack complex, 25 to 65 percent slopes 0.2 11.5% 117 Yeljack-Callings complex, 12 to 25 percent slopes 1.7 88.5% Totals for Area of Interest 1.9 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the Custom Soil Resource Report 12 1/16/18 development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 13 1/16/18 Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties 14—Callings-Yeljack complex, 25 to 65 percent slopes Map Unit Setting National map unit symbol: jq4z Elevation: 7,500 to 9,500 feet Mean annual precipitation: 18 to 20 inches Mean annual air temperature: 39 to 41 degrees F Frost-free period: 70 to 80 days Farmland classification: Not prime farmland Map Unit Composition Callings and similar soils: 50 percent Yeljack and similar soils: 40 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Callings Setting Landform: Ridges, mountain slopes Landform position (three-dimensional): Mountainflank Down-slope shape: Convex Across-slope shape: Convex Parent material: Alluvium derived from sandstone and/or colluvium derived from sandstone Typical profile H1 - 0 to 6 inches: loam H2 - 6 to 12 inches: gravelly loam H3 - 12 to 34 inches: very cobbly clay loam H4 - 34 to 53 inches: very gravelly clay loam H5 - 53 to 60 inches: very cobbly sandy clay loam Properties and qualities Slope: 25 to 65 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Very high Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Moderate (about 6.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: C Ecological site: Brushy Loam (R048AY238CO) Other vegetative classification: BRUSHY LOAM (null_4) Custom Soil Resource Report 14 1/16/18 Hydric soil rating: No Description of Yeljack Setting Landform: Mountain slopes Landform position (three-dimensional): Mountainflank Down-slope shape: Linear Across-slope shape: Linear Parent material: Alluvium derived from sandstone and/or eolian deposits Typical profile H1 - 0 to 10 inches: silt loam H2 - 10 to 24 inches: silty clay loam H3 - 24 to 60 inches: clay loam Properties and qualities Slope: 25 to 65 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Very high Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.60 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: High (about 11.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: C Ecological site: Mountain Loam (R048AY228CO) Other vegetative classification: Mountain Loam (null_42) Hydric soil rating: No 117—Yeljack-Callings complex, 12 to 25 percent slopes Map Unit Setting National map unit symbol: jq4t Elevation: 7,500 to 9,500 feet Mean annual precipitation: 18 to 20 inches Mean annual air temperature: 39 to 41 degrees F Frost-free period: 70 to 80 days Farmland classification: Not prime farmland Map Unit Composition Yeljack and similar soils: 50 percent Callings and similar soils: 40 percent Estimates are based on observations, descriptions, and transects of the mapunit. Custom Soil Resource Report 15 1/16/18 Description of Yeljack Setting Landform: Structural benches, mountains Landform position (three-dimensional): Mountainflank Down-slope shape: Linear Across-slope shape: Linear Parent material: Alluvium derived from sandstone and/or eolian deposits Typical profile H1 - 0 to 10 inches: silt loam H2 - 10 to 24 inches: silty clay loam H3 - 24 to 60 inches: clay loam Properties and qualities Slope: 12 to 25 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.60 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: High (about 11.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: C Ecological site: Mountain Loam (R048AY228CO) Other vegetative classification: Mountain Loam (null_42) Hydric soil rating: No Description of Callings Setting Landform: Ridges, mountains Landform position (three-dimensional): Mountainflank Down-slope shape: Linear Across-slope shape: Linear Parent material: Alluvium derived from sandstone and/or colluvium derived from sandstone Typical profile H1 - 0 to 6 inches: loam H2 - 6 to 12 inches: gravelly loam H3 - 12 to 34 inches: very cobbly clay loam H4 - 34 to 53 inches: very gravelly clay loam H5 - 53 to 60 inches: very cobbly sandy clay loam Properties and qualities Slope: 12 to 25 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Custom Soil Resource Report 16 1/16/18 Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Moderate (about 6.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: C Ecological site: Brushy Loam (R048AY238CO) Other vegetative classification: BRUSHY LOAM (null_4) Hydric soil rating: No Custom Soil Resource Report 17 1/16/18 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 18 1/16/18 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 19 1/16/18 2 Appendix B--FEMA FIRM Map 1/16/18 1/16/18 3 Appendix C--Plan Set 1/16/18 7/5/2017DATE OF PUBLICATIONC100COVER SHEETTHUNDERBOWL 395 THUNDERBOWL LN. ASPEN, CO 816111/18/2018PERMITWOODY CREEK ENGINEERING, LLCP.O. BOX 575WOODY CREEK, COLORADO 81656(P): 970-429-8297WOODYCREEKENGINEERING.COMTHUNDERBOWL395 THUNDERBOWL LN. ASPEN, CO81611NOTES:1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLICIMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS ANDSPECIFICATIONS SET FORTH IN THE CITY OF ASPEN ("COA") MUNICIPALCODE, COA TECHNICAL MANUALS, AND APPLICABLESTATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEENTHESE PLANS AND THE TECHNICAL MANUAL OR ANY APPLICABLESTANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL UTILITYWORK SHALL BE INSPECTED AND APPROVED BY THE UTILITY.2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATIONAND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ISBASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHEREPOSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOTTO BE RELIED UPON AS BEING EXACT OR COMPLETE.3.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THEAPPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE CRITERIA ANDSPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSIONAGREEMENTS NEEDED FOR THE JOB ONSITE AT ALL TIMES.4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OFSAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING,SHORING,TRAFFIC CONTROL, AND SECURITY.5.IF DURING THE CONSTRUCTION PROCESS CONDITIONS AREENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOTIDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALLCONTACT THE WOODY CREEK ENGINEERING, LLC IMMEDIATELY.6.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TOTHE LATEST REVISION OF SAID STANDARD UNLESS SPECIFICALLY STATEDOTHERWISE.7.THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN INACCORDANCE WITH MUTCD TO THE APPROPRIATE RIGHT-OF-WAYAUTHORITY (TOWN, COUNTY OR STATE) FOR APPROVAL PRIOR TO ANYCONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALLTRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THECONSTRUCTION ACTIVITIES.8.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR ANDMATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDEDIMPROVEMENTS SHOWN ON THESE DRAWINGS OR AS DESIGNATED TO BEPROVIDED, INSTALLED, OR CONSTRUCTED UNLESS SPECIFICALLYNOTED OTHERWISE.9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYSFREE AND CLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROMTHE SITE.10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING AS-BUILTINFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THECONSTRUCTION SITE AND AVAILABLE AT ALL TIMES.11.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BESCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN,CONTACT WOODY CREEK ENGINEERING, LLC FOR CLARIFICATION ANDANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.15. THE CONTRACTOR SHALL COMPLY WITH ALL TERMS AND CONDITIONS OFTHE COLORADO PERMIT FOR STORM WATER DISCHARGE, THE STORMWATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN.16.ALL STRUCTURAL EROSION CONTROL MEASURES SHALL BEINSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO ANY OTHEREARTH-DISTURBING ACTIVITY. ALL EROSION CONTROL MEASURES SHALL BEMAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME ASTHE ENTIRE DISTURBED AREA IS STABILIZED WITH HARD SURFACE ORLANDSCAPING.17.THE CONTRACTOR SHALL SEQUENCE INSTALLATION OF UTILITIES INSUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. INGENERAL, STORM SEWER AND SANITARY SEWER SHOULD BECONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRYUTILITIES.VICINITY MAP0100 200 400 800Scale: 1" = 200'N1/11/20181/16/18 EB:1 AREA: 0.69 Acre 30196.82 SF 8250.008255.008260. 0 0 8250.00 8255.00 82 6 0 . 0 0 8240.0 0 8245.00 8240.00 8245. 0 0 8250.008255.008260. 0 0 8250.00 8255.00 82 6 0 . 0 0 8240.0 0 8245.00 8240.00 8245. 0 0 PB:3 178 SF PB:4 442 SF PB:7 534 SF PB:1.7 473 SF PB:11 172 SF PB:12 436 SF PB:13 642 SF PB:1.0 8818 SF PB:1.2 1416 SF PB:9 746 SF PB:1.4 710 SF PB:1.3 402 SF PB:1.1 3773 SF PB:1.8 704 SF PB:1.5 1329 SF PB:1.6 2020 SF PB:5 1232 SF PB:2 1076 SFPB:10 285 SF PB:6 54 SF PB:8 179 SF PB:1.9 4565 SF 8236 8237 8238 8240 8241 8242 8242 8242 8241 8241 8241 8242 8243 8244 824682 4 6 8247824582478247824682458248 8 2 4 9 8 2 5 0 8 2 5 1 8 2 5 2 82 5 3 82 5 4 82 5 5 82 5 6 82 5 7 82 5 8 82 5 9 82 6 0 82 6 1 82 6 2 82 5 8 82 5 7 82 5 6 82 5 5 82 5 4 8253 8252 8251 8250 8249 8248 824782478246824582448244SWALE 824582458245824482448243 1/11/2018 DATE OF PUBLICATION C200 BASINSTHUNDERBOWL 395 THUNDERBOWL LN.ASPEN, CO 816115/25/2017 CONCEPTUAL G&D WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM EXISTING BASINS PROPOSED BASINS 0 10 20 40 80 Scale: 1" = 20' N 6/23/2017 PROGRESS GRADING 1/18/2018 COA COMMENTS 1/11/2018 1/16/18 W8250.008255.008260. 0 0 8250.00 8255.00 82 6 0 . 0 0 8240.0 0 8245.00 8240.00 8245. 0 0 ECONC:8244.90 CONC:8244.90 CONC:8244.90 8244.90 8246.1 -2.0%-2.0%-2.0%-2.0% 8244.36 8244.68 8244.73 8236 8237 8238 8240 8241 8242 8242 8242 8241 8241 8241 8242 8243 8244 82468 2 4 6 82478245824782478246824582 4 8 8 2 4 9 8 2 5 0 8 2 5 1 8 2 5 2 82 5 3 82 5 4 82 5 5 82 5 6 82 5 7 82 5 8 82 5 9 82 6 0 82 6 1 82 6 2 82 5 8 82 5 7 82 5 6 82 5 5 82 5 4 8253 8252 8251 8250 8249 8248 824782478246824582448244SWALE 824582458245824482448243 G10.00 FT 1/11/2018 DATE OF PUBLICATION C300 G&D OVERVIEWTHUNDERBOWL395 THUNDERBOWL LN.ASPEN, CO 816115/25/2017 CONCEPTUAL G&D WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 10 20 40 80 Scale: 1" = 20' N 6/23/2017 PROGRESS GRADING EXISTING CONTOUR PROPOSED CONTOUR7910 SPOT ELEVATION XXXX.XX CONC. = CONCRETE HP = HIGH POINT TD = TRENCH DRAIN PROPERTY LINE 1/11/2018 COA COMMENTS 1/11/2018 1/16/18 8250.008250.00 8255.00 8240.0 0 8245.00 8240.00 8245. 0 0 8244.54 8244.93 8244.98 8244.77 8244.90 8244.84 8244.83 INLET 1 RIM:8254.30 INV OUT:8248.30 6" PVC INLET 3 RIM:8248.19 INV IN:8247.16 6" PVC INV OUT:8243.61 6" PVC DS CONNECT 2 RIM:8243.80 INV IN:8242.19 10" INV OUT:8242.19 10" INLET 2 RIM:8250.95 INV IN:8247.56 6" PVC INV OUT:8247.56 6" PVC DS CONNECT 1 RIM:8243.84 INV IN:8243.28 4" PVC INV IN:8243.28 6" PVC INV OUT:8243.28 6" CONC:8244.90 CONC:8244.90 CONC:8244.90 8244.90 8246.1 -2.0%-2.0%-2.0%-2.0% INLET 4 RIM:8244.51 INV IN:8243.51 6" PVC INV OUT:8243.51 6" PVC 8244.36 8244.68 8244.73 823 6 823 7 823 8 824 0 8241 824 2 824 2 824 2 824 1 824 1 8241 8242 8243 8244 82468 2 4 6 82478245824782478246824582488 2 4 9 8 2 5 0 8 2 5 1 8 2 5 2 82 5 3 82 5 4 82 5 5 82 5 6 8249 8248 824782478246824582448244SWALE 824582458245824482448243 TRENCH DRAIN INLET 6 RIM:8244.70 INV OUT:8242.54 10" INLET 5 RIM:8244.70 INV IN:8242.63 10" 1/11/2018 DATE OF PUBLICATION C301 G&D NORTHTHUNDERBOWL395 THUNDERBOWL LN.ASPEN, CO 816115/25/2017 CONCEPTUAL G&D WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N EXISTING CONTOUR PROPOSED CONTOUR7910 SPOT ELEVATION XXXX.XX CONC. = CONCRETE HP = HIGH POINT TD = TRENCH DRAIN PROPERTY LINE 6/23/2017 PROGRESS GRADING 1/11/2018 COA COMMENTS 1/11/2018 1/16/18 8251.00 8250.008255.008260. 0 0 8250.00 8255.00 82 6 0 . 0 0 8240.0 0 8245.00 8245. 0 0 8244.54 8244.50 8251.00 8244.50 8244.93 8244.98 8244.77 8244.90 8244.84 8244.83 INLET 1 RIM:8254.30 INV OUT:8248.30 6" PVC INLET 3 RIM:8248.19 INV IN:8247.16 6" PVC INV OUT:8243.61 6" PVC DS CONNECT 2 RIM:8243.80 INV IN:8242.19 10" INV OUT:8242.19 10" INLET 2 RIM:8250.95 INV IN:8247.56 6" PVC INV OUT:8247.56 6" PVC DS CONNECT 1 RIM:8243.84 INV IN:8243.28 4" PVC INV IN:8243.28 6" PVC INV OUT:8243.28 6" CONC:8244.90 CONC:8244.90 CONC:8244.90 8244.90 8246.1 -2.0%-2.0%-2.0%-2.0% INLET 4 RIM:8244.51 INV IN:8243.51 6" PVC INV OUT:8243.51 6" PVC 8244.36 8244.68 8244.73 824 1 824 2 824 2 824 2 8241 8242 8243 8244 82468 2 4 6 82478245824782478246824582488 2 4 9 8 2 5 0 8 2 5 1 8 2 5 2 82 5 3 82 5 4 82 5 5 82 5 6 82 5 7 82 5 8 82 5 9 82 6 0 82 6 1 82 6 2 82 5 8 82 5 7 82 5 6 82 5 5 82 5 4 8253 8252 8251 8250 8249 8248 824782478246824582448244SWALE 824582458245824482448243 TRENCH DRAIN INLET 6 RIM:8244.70 INV OUT:8242.54 10" INLET 5 RIM:8244.70 INV IN:8242.63 10" 1/11/2018 DATE OF PUBLICATION C302 G&D SOUTHTHUNDERBOWL395 THUNDERBOWL LN.ASPEN, CO 816115/25/2017 CONCEPTUAL G&D WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N 6/23/2017 PROGRESS GRADING EXISTING CONTOUR PROPOSED CONTOUR7910 SPOT ELEVATION XXXX.XX CONC. = CONCRETE HP = HIGH POINT TD = TRENCH DRAIN PROPERTY LINE 1/11/2018 COA COMMENTS 1/11/2018 1/16/18 ElevationStation PIPE A PROFILE 8240 8241 8242 8243 8244 8245 8246 8247 8248 8249 8250 8251 8252 8253 8254 8255 8256 8257 8258 8259 8260 -0+020+00 0+20 0+40 0+60 0+80 1+001+09 ElevationStation Pipe B PROFILE 8240 8241 8242 8243 8244 8245 8246 8247 8248 8249 8250 8251 8252 8253 8254 8255 -0+020+00 0+20 0+40 0+60 0+80 1+00 1+20 1+38 15.40' of 6" PVC @ 4.00% INLET 3 RIM:8248.19 INV IN:8247.16 6" PVC INV OUT:8243.61 6" PVC 12.94' of 6" PVC @ 0.76% INLET 4 RIM:8244.51 INV IN:8243.51 6" PVC INV OUT:8243.51 6" PVC 30.47' of 6" PVC @ 0.76% 3.00' of 6" PVC @ 4.00% 10.11' of 6" PVC @ 4.00% 36.39' of 6" @ 0.76% INLET 1 RIM:8254.30 INV OUT:8248.30 6" PVC INLET 2 RIM:8250.95 INV IN:8247.56 6" PVC INV OUT:8247.56 6" PVC TRENCH DRAIN 35.75' of 10" @ 0.76% 12.45' of 10" @ -0.76% 45.16' of 10" @ 0.76% 26.66' of 10" @ 0.76% INLET 5 RIM:8244.70 INV IN:8242.63 10" INLET 6 RIM:8244.70 INV OUT:8242.54 10"DS CONNECT 2 RIM:8243.80 INV IN:8242.19 10" INV OUT:8242.19 10" 1/11/2018 DATE OF PUBLICATION C400 PIPE PROFILESTHUNDERBOWL395 THUNDERBOWL LN.ASPEN, CO 816115/25/2017 CONCEPTUAL G&D WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 6/23/2017 PROGRESS GRADING 1/18/2018 COA COMMENTS 1/11/2018 1/16/18 1.00 FT 0.57 FT 3.00 FT4.76 FT 1.57 FT 1.00 FT 7.76 FT 1.00 FT CHECK VALVES FOUNDATION DRAIN LIFT STATION PLAN LIFT OUT ADAPTERS 4"Ø FOUNDATION DRAIN COLLECTOR PIPER PRECAST 40" RISERS PIPES IN (SEE PLAN) PRECAST SOLID REMOVABLE LID STANDARD RISER SECTION(S) WITH NATIVE BACKFILL PERFORATED RISER SECTION(S) WITH 3 4" WASHED ROCK 2 FT AROUND DRYWELL AND 1 FT BELOW THE DRYWELL NOTES: 1. PRECAST MANHOLE TO MEET ASTM C-467. 2. THE EDGE OF THE DRYWELL SHALL BE INSTALLED AT LEAST 10 FEET AWAY FROM ANY FOUNDATION WALL. 3. COMPACT BACKFILL TO 95% STANDARD PROCTOR. 4. BACKFILL EXCAVATION STRUCTURE WITH COMPACTED 1-1/2" WASHED ROCK TO THE TOP OF THE DRYWELL AND WITH STRUCTURAL NATIVE MATERIAL TO 12" BELOW FINISH GRADE. COMPACT BACKFILL TO 95% STANDARD PROCTOR. RECESS MANHOLE LID 1 8" TO 1 4" BELOW FINISH GRADE CAST IRON OR ALUM. MANHOLE STEPS, POSITION OVER SHELF IN VERTICAL LINE AT 15" o.c. MAX. 2" DISCHARGE PIPE FLEXIBLE PLASTIC SEALING COMPUND (RAM-NEK) AT ALL JOINTS 4" FOUNDATION DRAIN DUPLEX GRINDER PUMPS TO HAVE A QUICK DISCONNECT TO PULL THE PUMPS OUT OF MANHOLE THROUH THE MANWAY. PUMPS TO SIT DIRECTLY ON BOTTOM OF MANHOLE 24Ø 1/11/2018 DATE OF PUBLICATION C500 DETAILSTHUNDERBOWL 395 THUNDERBOWL LN.ASPEN, CO 816115/25/2017 CONCEPTUAL G&D WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 6/23/2017 PROGRESS GRADING RAIN GARDEN CROSS SECTION A-A 9" SQUARE STRUCTURAL FOAM GRATE 9" SQUARE GALVANIZED STEEL GRATE 12" SQUARE GALVANIZED STEEL GRATE TRENCH DRAIN GRATE INLET TYPE FOUNDATION DRAIN AND DRYWELL DETAILS 1/11/2018 COA COMMENTS 1/11/2018 1/16/18 8250.00 8255.008260.008250.008255.008260.008240.008245.008240.008245.00 -2.0% -2.0% -2.0%-2.0%8 2 3 682 3 7 8 2 3 8 8 2 4 0 82 4 1 8 2 4 2 8 2 4 2 8 2 4 2 82 4 1 82 4 182418242824382448 2 4 6824682478 2 4 5 8 2 4 7 8247 8246 8245 824882498250825182528253825482558256825782588259826082618262825882578256825582548253825282518250824982488247 8247 8246 8245 8244 8244 SWALE82 4 5 82458245 8244824482431/11/2018 DATE OF PUBLICATION C600 EROSION AND SEDIMENT CONTROLTHUNDERBOWL 395 THUNDERBOWL LN.ASPEN, CO 816115/25/2017 CONCEPTUAL G&D WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10'NSED. FENCE 6/23/2017 PROGRESS GRADING PROPERTY LINE 1/11/2018 COA COMMENTS 1/11/2018 1/16/18 W SS SS 8250.00 8255.008260.008250.008255.008260.008240.008245.008240.008245.00 E CONC:8244.90CONC:8244.90CONC:8244.908244.908246.1-2.0% -2.0% -2.0%-2.0%8244.368244.688244.738 2 3 682 3 7 8 2 3 8 8 2 4 0 82 4 1 8 2 4 2 8 2 4 2 8 2 4 2 82 4 1 82 4 182418242824382448 2 4 6824682478 2 4 5 8 2 4 7 8247 8246 8245 824882498250825182528253825482558256825782588259826082618262825882578256825582548253825282518250824982488247 8247 8246 8245 8244 8244 SWALE82 4 5 82458245 824482448243G 10.00 FT1/11/2018 DATE OF PUBLICATION C700 UTILITIESTHUNDERBOWL 395 THUNDERBOWL LN.ASPEN, CO 816115/25/2017 CONCEPTUAL G&D WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10'NUTILITY SERVICE E=ELECTRIC UG=UNDERGROUND GAS SS=SANITARY SEWER W=WATER Tel=PHONE LINE Cable=CABLE LINE WATER METER ELECTRIC METER W E 6/23/2017 PROGRESS GRADING EXISTING CONTOUR PROPOSED CONTOUR7910 SPOT ELEVATION XXXX.XX CONC. = CONCRETE HP = HIGH POINT TD = TRENCH DRAIN PROPERTY LINE 1/11/2018 COA COMMENTS 1/11/2018 1/16/18 W SS SS E -2.0% -2.0% -2.0%-2.0%8 2 3 682 3 7 8 2 3 8 8 2 4 0 82 4 1 8 2 4 2 8 2 4 2 8 2 4 2 82 4 1 82 4 182418242824382448 2 4 6824682478 2 4 5 8 2 4 7 8247 8246 8245 824882498250825182528253825482558256825782588259826082618262825882578256825582548253825282518250824982488247 8247 8246 8245 8244 8244 SWALE82 4 5 82458245 824482448243G 10.00 FT1/11/2018 DATE OF PUBLICATION C800 FOUNDATION DRAIN PLANTHUNDERBOWL 395 THUNDERBOWL LN.ASPEN, CO 816115/25/2017 CONCEPTUAL G&D WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10'NSED. FENCE 6/23/2017 PROGRESS GRADING PROPERTY LINE 1/11/2018 COA COMMENTS 1/11/2018 1/16/18 4 Appendix D--Hydrologic Calculations 1/16/18 City of Aspen Urban Runoff Management Plan Chapter 8 – Water Quality 8-30 Rev 11/2014 Figure 8.13 Aspen Water Quality Capture Volume 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100WQCV (watershed-inches) Effective Imperviousness of Tributary Area to BMP (percent) WQCV SF 1/16/18 5YR-EB1.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:EB : 1 I.Catchment Hydrologic Data Catchment ID =EB : 1 Area =0.693 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.15 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1000 312 0.15 N/A 0.37 14.17 1 2 3 4 5 Sum 312 Computed Tc =14.17 Regional Tc =11.73 User-Entered Tc =11.73 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =1.99 inch/hr Peak Flowrate, Qp =0.207 cfs Rainfall Intensity at Regional Tc, I =2.23 inch/hr Peak Flowrate, Qp =0.232 cfs Rainfall Intensity at User-Defined Tc, I =2.23 inch/hr Peak Flowrate, Qp =0.232 cfs 1/16/18 5YR-PB1.0.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.0 I.Catchment Hydrologic Data Catchment ID =PB:1.0 Area =0.203 Acres Percent Imperviousness =11.30 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.22 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.22 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1000 156 0.22 N/A 0.28 9.31 1 2 3 4 5 Sum 156 Computed Tc =9.31 Regional Tc =10.87 User-Entered Tc =9.31 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =2.52 inch/hr Peak Flowrate, Qp =0.111 cfs Rainfall Intensity at Regional Tc, I =2.33 inch/hr Peak Flowrate, Qp =0.103 cfs Rainfall Intensity at User-Defined Tc, I =2.52 inch/hr Peak Flowrate, Qp =0.111 cfs 1/16/18 5YR-PB2.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:2 I.Catchment Hydrologic Data Catchment ID =PB:2 Area =0.025 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.15 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.15 N/A 0.08 1.05 1 2 3 4 5 Sum 5 Computed Tc =1.05 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.54 inch/hr Peak Flowrate, Qp =0.017 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.009 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.012 cfs 1/16/18 5YR-PB3.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:3 I.Catchment Hydrologic Data Catchment ID =PB:3 Area =0.004 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.92 inch/hr Peak Flowrate, Qp =0.018 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.009 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.012 cfs 1/16/18 5YR-PB4.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:4 I.Catchment Hydrologic Data Catchment ID =PB:4 Area =0.010 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.15 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.15 N/A 0.08 1.05 1 2 3 4 5 Sum 5 Computed Tc =1.05 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.54 inch/hr Peak Flowrate, Qp =0.007 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.004 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.005 cfs 1/16/18 5YR-PB5.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:5 I.Catchment Hydrologic Data Catchment ID =PB:5 Area =0.028 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.92 inch/hr Peak Flowrate, Qp =0.124 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.061 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.083 cfs 1/16/18 5YR-PB6.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:6 I.Catchment Hydrologic Data Catchment ID =PB:6 Area =0.001 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.92 inch/hr Peak Flowrate, Qp =0.004 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.002 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.003 cfs 1/16/18 5YR-PB7.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:7 I.Catchment Hydrologic Data Catchment ID =PB:7 Area =0.012 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.15 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.15 N/A 0.08 1.05 1 2 3 4 5 Sum 5 Computed Tc =1.05 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.54 inch/hr Peak Flowrate, Qp =0.008 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.004 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.006 cfs 1/16/18 5YR-PB8.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:8 I.Catchment Hydrologic Data Catchment ID =PB:8 Area =0.004 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.92 inch/hr Peak Flowrate, Qp =0.016 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.008 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.010 cfs 1/16/18 5YR-PB9.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:9 I.Catchment Hydrologic Data Catchment ID =PB:9 Area =0.017 Acres Percent Imperviousness =20.10 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.26 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.26 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.26 N/A 0.09 0.93 1 2 3 4 5 Sum 5 Computed Tc =0.93 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.59 inch/hr Peak Flowrate, Qp =0.020 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.011 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.014 cfs 1/16/18 5YR-PB10.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:10 I.Catchment Hydrologic Data Catchment ID =PB:10 Area =0.007 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.92 inch/hr Peak Flowrate, Qp =0.031 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.015 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.021 cfs 1/16/18 5YR-PB11.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:11 I.Catchment Hydrologic Data Catchment ID =PB:11 Area =0.002 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.92 inch/hr Peak Flowrate, Qp =0.009 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.004 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.006 cfs 1/16/18 5YR-PB12.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:12 I.Catchment Hydrologic Data Catchment ID =PB:12 Area =0.010 Acres Percent Imperviousness =81.60 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.64 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.64 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.64 N/A 0.16 0.51 1 2 3 4 5 Sum 5 Computed Tc =0.51 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.78 inch/hr Peak Flowrate, Qp =0.031 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.016 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.022 cfs 1/16/18 5YR-PB13.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:13 I.Catchment Hydrologic Data Catchment ID =PB:13 Area =0.015 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.15 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.15 N/A 0.08 1.05 1 2 3 4 5 Sum 5 Computed Tc =1.05 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.54 inch/hr Peak Flowrate, Qp =0.010 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.005 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.007 cfs 1/16/18 100YR-EB1.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:EB : 1 I.Catchment Hydrologic Data Catchment ID =EB : 1 Area =0.693 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.50 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1000 312 0.15 N/A 0.37 14.17 1 2 3 4 5 Sum 312 Computed Tc =14.17 Regional Tc =11.73 User-Entered Tc =11.73 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.83 inch/hr Peak Flowrate, Qp =1.327 cfs Rainfall Intensity at Regional Tc, I =4.28 inch/hr Peak Flowrate, Qp =1.485 cfs Rainfall Intensity at User-Defined Tc, I =4.28 inch/hr Peak Flowrate, Qp =1.4845 cfs 1/16/18 100YR-PB1.0.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.0 I.Catchment Hydrologic Data Catchment ID =PB:1.0 Area =0.203 Acres Percent Imperviousness =11.30 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.53 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.22 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1000 156 0.22 N/A 0.28 9.31 1 2 3 4 5 Sum 156 Computed Tc =9.31 Regional Tc =10.87 User-Entered Tc =9.31 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.85 inch/hr Peak Flowrate, Qp =0.526 cfs Rainfall Intensity at Regional Tc, I =4.47 inch/hr Peak Flowrate, Qp =0.485 cfs Rainfall Intensity at User-Defined Tc, I =4.85 inch/hr Peak Flowrate, Qp =0.526 cfs 1/16/18 100YR-PB2.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:2 I.Catchment Hydrologic Data Catchment ID =PB:2 Area =0.025 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.50 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.15 N/A 0.08 1.05 1 2 3 4 5 Sum 5 Computed Tc =1.05 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =8.72 inch/hr Peak Flowrate, Qp =0.109 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.058 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.079 cfs 1/16/18 100YR-PB3.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:3 I.Catchment Hydrologic Data Catchment ID =PB:3 Area =0.004 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.46 inch/hr Peak Flowrate, Qp =0.036 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.018 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.024 cfs 1/16/18 100YR-PB4.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:4 I.Catchment Hydrologic Data Catchment ID =PB:4 Area =0.010 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.50 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.15 N/A 0.08 1.05 1 2 3 4 5 Sum 5 Computed Tc =1.05 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =8.72 inch/hr Peak Flowrate, Qp =0.045 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.024 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.033 cfs 1/16/18 100YR-PB5.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:5 I.Catchment Hydrologic Data Catchment ID =PB:5 Area =0.028 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.46 inch/hr Peak Flowrate, Qp =0.253 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.125 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.169 cfs 1/16/18 100YR-PB6.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:6 I.Catchment Hydrologic Data Catchment ID =PB:6 Area =0.001 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.46 inch/hr Peak Flowrate, Qp =0.011 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.006 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.008 cfs 1/16/18 100YR-PB7.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:7 I.Catchment Hydrologic Data Catchment ID =PB:7 Area =0.012 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.50 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.15 N/A 0.08 1.05 1 2 3 4 5 Sum 5 Computed Tc =1.05 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =8.72 inch/hr Peak Flowrate, Qp =0.051 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.027 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.037 cfs 1/16/18 100YR-PB8.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:8 I.Catchment Hydrologic Data Catchment ID =PB:8 Area =0.004 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.46 inch/hr Peak Flowrate, Qp =0.032 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.016 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.021 cfs 1/16/18 100YR-PB9.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:9 I.Catchment Hydrologic Data Catchment ID =PB:9 Area =0.003 Acres Percent Imperviousness =20.10 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.55 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.26 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.26 N/A 0.09 0.93 1 2 3 4 5 Sum 5 Computed Tc =0.93 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =8.82 inch/hr Peak Flowrate, Qp =0.015 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.008 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.010 cfs 1/16/18 100YR-PB10.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:10 I.Catchment Hydrologic Data Catchment ID =PB:10 Area =0.007 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.46 inch/hr Peak Flowrate, Qp =0.063 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.031 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.042 cfs 1/16/18 100YR-PB11.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:11 I.Catchment Hydrologic Data Catchment ID =PB:11 Area =0.002 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.90 N/A 0.37 0.23 1 2 3 4 5 Sum 5 Computed Tc =0.23 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.46 inch/hr Peak Flowrate, Qp =0.018 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.009 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.012 cfs 1/16/18 100YR-PB12.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:12 I.Catchment Hydrologic Data Catchment ID =PB:12 Area =0.080 Acres Percent Imperviousness =81.60 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.76 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.64 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.64 N/A 0.16 0.51 1 2 3 4 5 Sum 5 Computed Tc =0.51 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.20 inch/hr Peak Flowrate, Qp =0.556 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.282 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.383 cfs 1/16/18 100YR-PB13.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:13 I.Catchment Hydrologic Data Catchment ID =PB:13 Area =0.015 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.50 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.5000 5 0.15 N/A 0.08 1.05 1 2 3 4 5 Sum 5 Computed Tc =1.05 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =8.72 inch/hr Peak Flowrate, Qp =0.065 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.035 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.047 cfs 1/16/18 5YR-PB1.1.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.1 I.Catchment Hydrologic Data Catchment ID =PB:1.1 Area =0.087 Acres Percent Imperviousness =3.20 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.17 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.17 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1400 113 0.17 N/A 0.25 7.46 1 2 3 4 5 Sum 113 Computed Tc =7.46 Regional Tc =10.63 User-Entered Tc =7.46 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =2.81 inch/hr Peak Flowrate, Qp =0.042 cfs Rainfall Intensity at Regional Tc, I =2.35 inch/hr Peak Flowrate, Qp =0.035 cfs Rainfall Intensity at User-Defined Tc, I =2.81 inch/hr Peak Flowrate, Qp =0.042 cfs 1/16/18 5YR-PB1.2.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.2 I.Catchment Hydrologic Data Catchment ID =PB:1.2 Area =0.033 Acres Percent Imperviousness =5.20 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.18 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.18 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1600 63 0.18 N/A 0.20 5.26 1 2 3 4 5 Sum 63 Computed Tc =5.26 Regional Tc =10.35 User-Entered Tc =5.26 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.23 inch/hr Peak Flowrate, Qp =0.020 cfs Rainfall Intensity at Regional Tc, I =2.39 inch/hr Peak Flowrate, Qp =0.014 cfs Rainfall Intensity at User-Defined Tc, I =3.23 inch/hr Peak Flowrate, Qp =0.020 cfs 1/16/18 5YR-PB1.3.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.3 I.Catchment Hydrologic Data Catchment ID =PB:1.3 Area =0.009 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.15 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1900 31 0.15 N/A 0.14 3.61 1 2 3 4 5 Sum 31 Computed Tc =3.61 Regional Tc =10.17 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.65 inch/hr Peak Flowrate, Qp =0.005 cfs Rainfall Intensity at Regional Tc, I =2.41 inch/hr Peak Flowrate, Qp =0.003 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.004 cfs 1/16/18 5YR-PB1.4.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.4 I.Catchment Hydrologic Data Catchment ID =PB:1.4 Area =0.017 Acres Percent Imperviousness =2.10 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.16 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.16 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.2200 46 0.16 N/A 0.19 4.13 1 2 3 4 5 Sum 46 Computed Tc =4.13 Regional Tc =10.26 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.50 inch/hr Peak Flowrate, Qp =0.010 cfs Rainfall Intensity at Regional Tc, I =2.40 inch/hr Peak Flowrate, Qp =0.007 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.009 cfs 1/16/18 5YR-PB1.5.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.5 I.Catchment Hydrologic Data Catchment ID =PB:1.5 Area =0.031 Acres Percent Imperviousness =50.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.40 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.40 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0100 39 0.40 N/A 0.08 7.92 1 2 3 4 5 Sum 39 Computed Tc =7.92 Regional Tc =10.22 User-Entered Tc =7.92 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =2.73 inch/hr Peak Flowrate, Qp =0.034 cfs Rainfall Intensity at Regional Tc, I =2.40 inch/hr Peak Flowrate, Qp =0.030 cfs Rainfall Intensity at User-Defined Tc, I =2.73 inch/hr Peak Flowrate, Qp =0.034 cfs 1/16/18 5YR-PB1.6.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.6 I.Catchment Hydrologic Data Catchment ID =PB:1.6 Area =0.046 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0200 10 0.90 N/A 0.18 0.93 1 2 3 4 5 Sum 10 Computed Tc =0.93 Regional Tc =10.06 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.59 inch/hr Peak Flowrate, Qp =0.189 cfs Rainfall Intensity at Regional Tc, I =2.42 inch/hr Peak Flowrate, Qp =0.100 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.136 cfs 1/16/18 5YR-PB1.7.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.7 I.Catchment Hydrologic Data Catchment ID =PB:1.7 Area =0.011 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.15 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.3600 25 0.15 N/A 0.16 2.63 1 2 3 4 5 Sum 25 Computed Tc =2.63 Regional Tc =10.14 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.94 inch/hr Peak Flowrate, Qp =0.007 cfs Rainfall Intensity at Regional Tc, I =2.41 inch/hr Peak Flowrate, Qp =0.004 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.005 cfs 1/16/18 5YR-PB1.8.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.8 I.Catchment Hydrologic Data Catchment ID =PB:1.8 Area =0.016 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0800 42 0.90 N/A 0.58 1.20 1 2 3 4 5 Sum 42 Computed Tc =1.20 Regional Tc =10.23 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.48 inch/hr Peak Flowrate, Qp =0.064 cfs Rainfall Intensity at Regional Tc, I =2.40 inch/hr Peak Flowrate, Qp =0.034 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.047 cfs 1/16/18 5YR-PB1.9.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.8 I.Catchment Hydrologic Data Catchment ID =PB:1.8 Area =0.105 Acres Percent Imperviousness =6.50 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.19 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.19 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0700 92 0.19 N/A 0.19 8.29 1 2 3 4 5 Sum 92 Computed Tc =8.29 Regional Tc =10.51 User-Entered Tc =8.29 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =2.67 inch/hr Peak Flowrate, Qp =0.053 cfs Rainfall Intensity at Regional Tc, I =2.37 inch/hr Peak Flowrate, Qp =0.047 cfs Rainfall Intensity at User-Defined Tc, I =2.67 inch/hr Peak Flowrate, Qp =0.053 cfs 1/16/18 100YR-PB1.1.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.1 I.Catchment Hydrologic Data Catchment ID =PB:1.1 Area =0.087 Acres Percent Imperviousness =3.20 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.51 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.17 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1400 113 0.17 N/A 0.25 7.46 1 2 3 4 5 Sum 113 Computed Tc =7.46 Regional Tc =10.63 User-Entered Tc =7.46 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =5.39 inch/hr Peak Flowrate, Qp =0.240 cfs Rainfall Intensity at Regional Tc, I =4.52 inch/hr Peak Flowrate, Qp =0.201 cfs Rainfall Intensity at User-Defined Tc, I =5.39 inch/hr Peak Flowrate, Qp =0.240 cfs 1/16/18 100YR-PB1.2.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.2 I.Catchment Hydrologic Data Catchment ID =PB:1.2 Area =0.033 Acres Percent Imperviousness =5.20 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.52 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.18 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1600 63 0.18 N/A 0.20 5.26 1 2 3 4 5 Sum 63 Computed Tc =5.26 Regional Tc =10.35 User-Entered Tc =5.26 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =6.21 inch/hr Peak Flowrate, Qp =0.106 cfs Rainfall Intensity at Regional Tc, I =4.59 inch/hr Peak Flowrate, Qp =0.078 cfs Rainfall Intensity at User-Defined Tc, I =6.21 inch/hr Peak Flowrate, Qp =0.106 cfs 1/16/18 100YR-PB1.3.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.3 I.Catchment Hydrologic Data Catchment ID =PB:1.3 Area =0.009 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.50 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1900 31 0.15 N/A 0.14 3.61 1 2 3 4 5 Sum 31 Computed Tc =3.61 Regional Tc =10.17 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =7.01 inch/hr Peak Flowrate, Qp =0.032 cfs Rainfall Intensity at Regional Tc, I =4.63 inch/hr Peak Flowrate, Qp =0.021 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.028 cfs 1/16/18 100YR-PB1.4.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.4 I.Catchment Hydrologic Data Catchment ID =PB:1.4 Area =0.017 Acres Percent Imperviousness =2.10 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.51 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.16 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.2200 46 0.16 N/A 0.19 4.13 1 2 3 4 5 Sum 46 Computed Tc =4.13 Regional Tc =10.26 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =6.74 inch/hr Peak Flowrate, Qp =0.058 cfs Rainfall Intensity at Regional Tc, I =4.61 inch/hr Peak Flowrate, Qp =0.040 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.055 cfs 1/16/18 100YR-PB1.5.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.5 I.Catchment Hydrologic Data Catchment ID =PB:1.5 Area =0.031 Acres Percent Imperviousness =50.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.60 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.40 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0100 39 0.40 N/A 0.08 7.92 1 2 3 4 5 Sum 39 Computed Tc =7.92 Regional Tc =10.22 User-Entered Tc =7.92 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =5.25 inch/hr Peak Flowrate, Qp =0.098 cfs Rainfall Intensity at Regional Tc, I =4.62 inch/hr Peak Flowrate, Qp =0.086 cfs Rainfall Intensity at User-Defined Tc, I =5.25 inch/hr Peak Flowrate, Qp =0.098 cfs 1/16/18 100YR-PB1.6.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.6 I.Catchment Hydrologic Data Catchment ID =PB:1.6 Area =0.046 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0200 10 0.90 N/A 0.18 0.93 1 2 3 4 5 Sum 10 Computed Tc =0.93 Regional Tc =10.06 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =8.82 inch/hr Peak Flowrate, Qp =0.388 cfs Rainfall Intensity at Regional Tc, I =4.66 inch/hr Peak Flowrate, Qp =0.205 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.278 cfs 1/16/18 100YR-PB1.7.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.7 I.Catchment Hydrologic Data Catchment ID =PB:1.7 Area =0.011 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.50 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.3600 25 0.15 N/A 0.16 2.63 1 2 3 4 5 Sum 25 Computed Tc =2.63 Regional Tc =10.14 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =7.58 inch/hr Peak Flowrate, Qp =0.042 cfs Rainfall Intensity at Regional Tc, I =4.64 inch/hr Peak Flowrate, Qp =0.026 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.035 cfs 1/16/18 100YR-PB1.8.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.8 I.Catchment Hydrologic Data Catchment ID =PB:1.8 Area =0.016 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0800 42 0.90 N/A 0.58 1.20 1 2 3 4 5 Sum 42 Computed Tc =1.20 Regional Tc =10.23 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =8.60 inch/hr Peak Flowrate, Qp =0.132 cfs Rainfall Intensity at Regional Tc, I =4.62 inch/hr Peak Flowrate, Qp =0.071 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.097 cfs 1/16/18 100YR-PB1.9.xls Page 3 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title:Thunderbowl Catchment ID:PB:1.8 I.Catchment Hydrologic Data Catchment ID =PB:1.8 Area =0.105 Acres Percent Imperviousness =6.50 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.52 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.19 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Paved Areas & Type Meadow Field Pasture/Bare Swales/Shallow Paved Swales Lawns Ground Waterways (Sheet Flow) Conveyance 2.5 5 7 10 15 20 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0700 92 0.19 N/A 0.19 8.29 1 2 3 4 5 Sum 92 Computed Tc =8.29 Regional Tc =10.51 User-Entered Tc =8.29 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =5.13 inch/hr Peak Flowrate, Qp =0.281 cfs Rainfall Intensity at Regional Tc, I =4.55 inch/hr Peak Flowrate, Qp =0.249 cfs Rainfall Intensity at User-Defined Tc, I =5.13 inch/hr Peak Flowrate, Qp =0.281 cfs 1/16/18 5 Appendix E--Hydraulic Calculations 1/16/18 Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Jan 11 2018 <Name> Rectangular Weir Crest = Sharp Bottom Length (ft) = 1.06 Total Depth (ft) = 0.57 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 1.48 Highlighted Depth (ft) = 0.56 Q (cfs) = 1.480 Area (sqft) = 0.59 Velocity (ft/s) = 2.49 Top Width (ft) = 1.06 0 .5 1 1.5 2 2.5 Depth (ft)Depth (ft)<Name> -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. 1/16/18 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Wednesday, Jan 10 2018 Pipe A - 6 in @ 0.76% Circular Diameter (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 0.76 N-Value = 0.012 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.40 Q (cfs) = 0.518 Area (sqft) = 0.17 Velocity (ft/s) = 3.07 Wetted Perim (ft) = 1.11 Crit Depth, Yc (ft) = 0.37 Top Width (ft) = 0.40 EGL (ft) = 0.55 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 1/16/18 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Jan 11 2018 6-in @ 4% Circular Diameter (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 4.00 N-Value = 0.012 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.40 Q (cfs) = 1.188 Area (sqft) = 0.17 Velocity (ft/s) = 7.05 Wetted Perim (ft) = 1.11 Crit Depth, Yc (ft) = 0.49 Top Width (ft) = 0.40 EGL (ft) = 1.17 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 1/16/18 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Wednesday, Jan 10 2018 Pipe A - 10 in @ 0.76% Circular Diameter (ft) = 0.83 Invert Elev (ft) = 100.00 Slope (%) = 0.76 N-Value = 0.012 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.66 Q (cfs) = 2.001 Area (sqft) = 0.46 Velocity (ft/s) = 4.31 Wetted Perim (ft) = 1.84 Crit Depth, Yc (ft) = 0.64 Top Width (ft) = 0.66 EGL (ft) = 0.95 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 1/16/18 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Wednesday, Jan 10 2018 Pipe A - Peak Discharge Circular Diameter (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 0.76 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 0.19 Highlighted Depth (ft) = 0.21 Q (cfs) = 0.194 Area (sqft) = 0.08 Velocity (ft/s) = 2.46 Wetted Perim (ft) = 0.71 Crit Depth, Yc (ft) = 0.22 Top Width (ft) = 0.49 EGL (ft) = 0.30 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 1/16/18 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Wednesday, Jan 10 2018 Pipe B - 10 in @ 0.49% Circular Diameter (ft) = 0.83 Invert Elev (ft) = 100.00 Slope (%) = 0.50 N-Value = 0.012 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.66 Q (cfs) = 1.623 Area (sqft) = 0.46 Velocity (ft/s) = 3.50 Wetted Perim (ft) = 1.84 Crit Depth, Yc (ft) = 0.58 Top Width (ft) = 0.66 EGL (ft) = 0.85 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 1/16/18 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Wednesday, Jan 10 2018 Pipe B - Peak Discharge Circular Diameter (ft) = 0.83 Invert Elev (ft) = 100.00 Slope (%) = 0.49 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 1.44 Highlighted Depth (ft) = 0.61 Q (cfs) = 1.440 Area (sqft) = 0.43 Velocity (ft/s) = 3.38 Wetted Perim (ft) = 1.71 Crit Depth, Yc (ft) = 0.54 Top Width (ft) = 0.73 EGL (ft) = 0.79 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 1/16/18 6 Appendix F—Detention Calculations 1/16/18 Project: Basin ID: Design Information (Input):Design Information (Input): Catchment Drainage Imperviousness Ia =26.83 percent Catchment Drainage Imperviousness Ia =26.83 percent Catchment Drainage Area A =0.693 acres Catchment Drainage Area A =0.693 acres Predevelopment NRCS Soil Group Type =C A, B, C, or D Predevelopment NRCS Soil Group Type =C A, B, C, or D Return Period for Detention Control T =5 years (2, 5, 10, 25, 50, or 100)Return Period for Detention Control T =100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc =5.00 minutes Time of Concentration of Watershed Tc =5.00 minutes Allowable Unit Release Rate q =0.335 cfs/acre Allowable Unit Release Rate q =2.141 cfs/acre One-hour Precipitation P1 =0.64 inches One-hour Precipitation P1 =1.23 inches Design Rainfall IDF Formula i = C1* P1/(C2+Tc)^C3 Design Rainfall IDF Formula i = C1* P1/(C2+Tc)^C3 Coefficient One C1 =88.80 Coefficient One C1 =88.80 Coefficient Two C2 =10 Coefficient Two C2 =10 Coefficient Three C3 =1.052 Coefficient Three C3 =1.052 Determination of Average Outflow from the Basin (Calculated):Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C =0.29 Runoff Coefficient C =0.56 Inflow Peak Runoff Qp-in =0.661 cfs Inflow Peak Runoff Qp-in =2.45 cfs Allowable Peak Outflow Rate Qp-out =0.232 cfs Allowable Peak Outflow Rate Qp-out =1.484 cfs Mod. FAA Minor Storage Volume = 210 cubic feet Mod. FAA Major Storage Volume = 425 cubic feet Mod. FAA Minor Storage Volume = 0.005 acre-ft Mod. FAA Major Storage Volume = 0.010 acre-ft 1 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume minutes inches / hr acre-feet "m"cfs acre-feet acre-feet minutes inches / hr acre-feet "m"cfs acre-feet acre-feet (input)(output)(output)(output)(output)(output)(output)(input)(output)(output)(output)(output)(output)(output) 0 0.00 0.000 0.00 0.00 0.000 0.000 0 0.00 0.000 0.00 0.00 0.000 0.000 1 4.56 0.001 1.00 0.23 0.000 0.001 1 8.77 0.005 1.00 1.48 0.002 0.003 2 4.16 0.002 1.00 0.23 0.001 0.002 2 8.00 0.009 1.00 1.48 0.004 0.004 3 3.83 0.003 1.00 0.23 0.001 0.002 3 7.35 0.012 1.00 1.48 0.006 0.006 4 3.54 0.004 1.00 0.23 0.001 0.003 4 6.80 0.015 1.00 1.48 0.008 0.006 5 3.29 0.005 1.00 0.23 0.002 0.003 5 6.33 0.017 1.00 1.48 0.010 0.007 6 3.08 0.005 0.92 0.21 0.002 0.003 6 5.91 0.019 0.92 1.36 0.011 0.008 7 2.89 0.006 0.86 0.20 0.002 0.004 7 5.54 0.021 0.86 1.27 0.012 0.008 8 2.72 0.006 0.81 0.19 0.002 0.004 8 5.22 0.022 0.81 1.21 0.013 0.009 9 2.57 0.006 0.78 0.18 0.002 0.004 9 4.93 0.024 0.78 1.15 0.014 0.009 10 2.43 0.007 0.75 0.17 0.002 0.004 10 4.67 0.025 0.75 1.11 0.015 0.010 11 2.31 0.007 0.73 0.17 0.003 0.004 11 4.44 0.026 0.73 1.08 0.016 0.010 12 2.20 0.007 0.71 0.16 0.003 0.005 12 4.23 0.027 0.71 1.05 0.017 0.010 13 2.10 0.008 0.69 0.16 0.003 0.005 13 4.03 0.028 0.69 1.03 0.018 0.010 14 2.01 0.008 0.68 0.16 0.003 0.005 14 3.86 0.029 0.68 1.01 0.019 0.009 15 1.92 0.008 0.67 0.15 0.003 0.005 15 3.70 0.030 0.67 0.99 0.020 0.009 16 1.85 0.008 0.66 0.15 0.003 0.005 16 3.55 0.030 0.66 0.97 0.021 0.009 17 1.77 0.008 0.65 0.15 0.004 0.005 17 3.41 0.031 0.65 0.96 0.022 0.008 18 1.71 0.009 0.64 0.15 0.004 0.005 18 3.28 0.032 0.64 0.95 0.024 0.008 19 1.64 0.009 0.63 0.15 0.004 0.005 19 3.16 0.032 0.63 0.94 0.025 0.008 20 1.59 0.009 0.63 0.14 0.004 0.005 20 3.05 0.033 0.63 0.93 0.026 0.007 21 1.53 0.009 0.62 0.14 0.004 0.005 21 2.95 0.033 0.62 0.92 0.027 0.007 22 1.48 0.009 0.61 0.14 0.004 0.005 22 2.85 0.034 0.61 0.91 0.028 0.006 23 1.44 0.009 0.61 0.14 0.004 0.005 23 2.76 0.034 0.61 0.90 0.029 0.005 24 1.39 0.009 0.60 0.14 0.005 0.005 24 2.67 0.034 0.60 0.90 0.030 0.005 25 1.35 0.009 0.60 0.14 0.005 0.005 25 2.59 0.035 0.60 0.89 0.031 0.004 26 1.31 0.009 0.60 0.14 0.005 0.004 26 2.52 0.035 0.60 0.88 0.032 0.003 27 1.27 0.010 0.59 0.14 0.005 0.004 27 2.45 0.035 0.59 0.88 0.033 0.003 28 1.24 0.010 0.59 0.14 0.005 0.004 28 2.38 0.036 0.59 0.87 0.034 0.002 29 1.20 0.010 0.59 0.14 0.005 0.004 29 2.31 0.036 0.59 0.87 0.035 0.001 30 1.17 0.010 0.58 0.14 0.006 0.004 30 2.25 0.036 0.58 0.87 0.036 0.000 31 1.14 0.010 0.58 0.13 0.006 0.004 31 2.20 0.036 0.58 0.86 0.037 0.000 32 1.11 0.010 0.58 0.13 0.006 0.004 32 2.14 0.037 0.58 0.86 0.038 -0.001 33 1.09 0.010 0.58 0.13 0.006 0.004 33 2.09 0.037 0.58 0.85 0.039 -0.002 34 1.06 0.010 0.57 0.13 0.006 0.004 34 2.04 0.037 0.57 0.85 0.040 -0.003 35 1.04 0.010 0.57 0.13 0.006 0.004 35 1.99 0.037 0.57 0.85 0.041 -0.004 36 1.01 0.010 0.57 0.13 0.007 0.004 36 1.95 0.037 0.57 0.85 0.042 -0.004 37 0.99 0.010 0.57 0.13 0.007 0.003 37 1.90 0.038 0.57 0.84 0.043 -0.005 38 0.97 0.010 0.57 0.13 0.007 0.003 38 1.86 0.038 0.57 0.84 0.044 -0.006 39 0.95 0.010 0.56 0.13 0.007 0.003 39 1.82 0.038 0.56 0.84 0.045 -0.007 40 0.93 0.010 0.56 0.13 0.007 0.003 40 1.78 0.038 0.56 0.83 0.046 -0.008 41 0.91 0.010 0.56 0.13 0.007 0.003 41 1.75 0.038 0.56 0.83 0.047 -0.009 42 0.89 0.010 0.56 0.13 0.008 0.003 42 1.71 0.038 0.56 0.83 0.048 -0.010 43 0.87 0.010 0.56 0.13 0.008 0.003 43 1.68 0.039 0.56 0.83 0.049 -0.011 44 0.86 0.010 0.56 0.13 0.008 0.003 44 1.64 0.039 0.56 0.83 0.050 -0.011 45 0.84 0.010 0.56 0.13 0.008 0.002 45 1.61 0.039 0.56 0.82 0.051 -0.012 46 0.82 0.010 0.55 0.13 0.008 0.002 46 1.58 0.039 0.55 0.82 0.052 -0.013 47 0.81 0.011 0.55 0.13 0.008 0.002 47 1.55 0.039 0.55 0.82 0.053 -0.014 48 0.79 0.011 0.55 0.13 0.008 0.002 48 1.52 0.039 0.55 0.82 0.054 -0.015 49 0.78 0.011 0.55 0.13 0.009 0.002 49 1.50 0.039 0.55 0.82 0.055 -0.016 50 0.77 0.011 0.55 0.13 0.009 0.002 50 1.47 0.039 0.55 0.82 0.056 -0.017 51 0.75 0.011 0.55 0.13 0.009 0.002 51 1.45 0.039 0.55 0.81 0.057 -0.018 52 0.74 0.011 0.55 0.13 0.009 0.002 52 1.42 0.040 0.55 0.81 0.058 -0.019 53 0.73 0.011 0.55 0.13 0.009 0.001 53 1.40 0.040 0.55 0.81 0.059 -0.020 54 0.72 0.011 0.55 0.13 0.009 0.001 54 1.37 0.040 0.55 0.81 0.060 -0.021 55 0.70 0.011 0.55 0.13 0.010 0.001 55 1.35 0.040 0.55 0.81 0.061 -0.022 56 0.69 0.011 0.54 0.13 0.010 0.001 56 1.33 0.040 0.54 0.81 0.062 -0.023 57 0.68 0.011 0.54 0.13 0.010 0.001 57 1.31 0.040 0.54 0.81 0.063 -0.023 58 0.67 0.011 0.54 0.13 0.010 0.001 58 1.29 0.040 0.54 0.81 0.064 -0.024 59 0.66 0.011 0.54 0.13 0.010 0.001 59 1.27 0.040 0.54 0.80 0.065 -0.025 60 0.65 0.011 0.54 0.13 0.010 0.000 60 1.25 0.040 0.54 0.80 0.066 -0.026 Mod. FAA Minor Storage Volume (cubic ft.) =210 Mod. FAA Major Storage Volume (cubic ft.) =425 Mod. FAA Minor Storage Volume (acre-ft.) =0.0048 Mod. FAA Major Storage Volume (acre-ft.) =0.0098 Determination of MAJOR Detention Volume Using Modified FAA Method (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.34, Released November 2013 Determination of MINOR Detention Volume Using Modified FAA Method DETENTION VOLUME BY THE MODIFIED FAA METHOD Thunderbowl Site FAA.xls, Modified FAA 1/11/2018, 9:05 PM 1/16/18 Project: Basin ID: UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.34, Released November 2013 DETENTION VOLUME BY THE MODIFIED FAA METHOD Thunderbowl Site 0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0 10 20 30 40 50 60 70Volume (acre-feet)Duration (Minutes) Inflow and Outflow Volumes vs. Rainfall Duration Minor Storm Inflow Volume Minor Storm Outflow Volume Minor Storm Storage Volume Major Storm Inflow Volume Major Storm Outflow Volume Major Storm Storage Volume FAA.xls, Modified FAA 1/11/2018, 9:05 PM 1/16/18