HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0255.2018 (7).ARBKGrading and Drainage Report Prepared for David Johnson Architects 395 Thunderbowl Lane, aspen P.O. Box 575 Woody Creek, Colorado 81656 970-309-7130 Prepared By Josh Rice, P.E. Change Order June 23, 2018 Revised January 11, 2018 July 05, 2017 10/03/2018 i I hereby affirm that this report and the accompanying plans for the drainage improvements of Lot 7 Block A, The Aspen Highlands Willage P.U.D. was prepared by me for the owners thereof in accordance with the provisions of the City of Aspen Urban Runoff Management Plan and approved variances and exceptions listed herein. I understand that it is the policy of the City that the City of Aspen does not and will not assume liability for drainage facilities designed by others. Josh Rice, P.E. License No. 1/11/20186/23/2018 10/03/2018 ii 1. INTRODUCTION ................................................................................................................................. 1 2. GENERAL SITE DESCRIPTION ....................................................................................................... 1 2.1 Existing Condition ..................................................................................................................................... 1 2.2 Proposed Condition ................................................................................................................................... 2 2.2.1 Determination of Major/Minor .................................................................................................................... 2 2.3 Drainage Basins ......................................................................................................................................... 2 2.3.1 Historical Basin EB : 1 ................................................................................................................................... 6 2.3.1 Proposed Basin ............................................................................................................................................. 6 3. STORMWATER BMPS AND ROUTING ......................................................................................... 6 3.1 General ..................................................................................................................................................... 7 3.1.1 Detention Calculation .................................................................................................................................. 7 3.1.2 Outlet Calculation ........................................................................................................................................ 8 3.2 Pipe Calculations ....................................................................................................................................... 8 3.3 Inlet Calculations ..................................................................................................................................... 10 3.3.1 Operation and maintenance ...................................................................................................................... 12 APPENDIX A--NRCS SOILS REPORT ................................................................................................. 1 APPENDIX B--FEMA FIRM MAP ......................................................................................................... 2 APPENDIX C--PLAN SET ....................................................................................................................... 3 APPENDIX D--HYDROLOGIC CALCULATIONS ............................................................................... 4 APPENDIX E--HYDRAULIC CALCULATIONS .................................................................................. 5 APPENDIX F—DETENTION CALCULATIONS ................................................................................. 6 10/03/2018 1. Introduction This report was prepared to meet the requirements of a City of Aspen Engineering Department Grading and Drainage Report for a Major Design. The report was prepared for a single-family housing project at 395 Thunderbowl Ln, Aspen, Colorado, 81611 (the “Site”). Facilities providing water quality capture volume and detention have been designed in this report and the associated plan. 2. General Site Description 2.1 Existing Condition The property was platted as Lot 7 Block A, The Aspen Highlands Willage P.U.D. Based on the topograph- ical improvement survey, the lot area is approximately 30,198 square feet. The Site is located near the Aspen Highlands Ski Resort (see Figure 1). The soils are described by the NRCS as, “Yeljack-Callings complex, 12 to 25 percent slopes” (see Appendix A). The hydrologic soil group is “C.” The lot is currently vacant. Figure 1. 395 Thunderbowl Ln, Aspen Vicinity Map (Source: maps.google.com) The site is located well away from all major drainage ways and is not located within the floodplain bound- aries the Maroon Creek. The Site is located within Zone X, as shown and described by FEMA (see FIRM Map, Appendix B.) 10/03/2018 2 2.2 Proposed Condition A new single-family structure will be constructed on the vacant lot. 2.2.1 Determination of Major/Minor The Urban Runoff Management Plan (the “URMP”) has two controlling triggers when determining the permit requirements: interior demolition and exterior disturbed area. Based on these two triggers, Woody Creek Engineering (“WCE”) has determined that water quality capture volume (“WQCV”) and detention is required for the entire property. The Site is located on a hill that slopes to the North at 10%. Drainage basins are delineated on Plan Sheet C.1 (Appendix C, C.1). The basins are described in the following sections. The drainage issues and WQCV treatment BMPs are also described. 2.3 Drainage Basins Both Historical and proposed basins are described below. Table 1, below, describes the impervious area, pervious area, total area, percent imperviousness, flow path length, basin slope, runoff coefficients for the minor (5-yr) and major (100-yr) storm events and runoff flowrates for the minor (5-yr) and major (100-yr) storm events. Although the Basins are delineated on Plan Sheet C.1 (Appendix C, C.1), they are also provided in Figure No. 2 and 3, below. Historical peak flows for the 5-year and 100-year events were evaluated for the Site using a time of con- centration based on the flow path length and slope. 10/03/2018 3 Table 1. Basin Information BASIN NO.TOTAL BASIN AREA (SF) IMPERVIOUS AREA (SF) TOTAL BASIN AREA (ACRES) IMPERVIOUS AREA (ACRES) % IMPERVIOUS RUNOFF COEF. 5YR RUNOFF COEF. 100YR FLOW PATH LENGTH (FT) FLOW PATH SLOPE (FT/FT) Tc (min)PEAK FLOW 5YR (CFS) PEAK FLOW 100YR (CFS) EB:1 30,198 0 0.693 0.000 0%0.15 0.50 312 0.1000 11.73 0.232 1.485 Total 30,198 0 0.693 0.000 0%-----0.232 1.485 BASIN NO.TOTAL BASIN AREA (SF) IMPERVIOUS AREA (SF) TOTAL BASIN AREA (ACRES) IMPERVIOUS AREA (ACRES) % IMPERVIOUS RUNOFF COEF. 5YR RUNOFF COEF. 100YR FLOW PATH LENGTH (FT) FLOW PATH SLOPE (FT/FT) Tc (min)PEAK FLOW 5YR (CFS) PEAK FLOW 100YR (CFS) PB:1.0 9,780 0 0.225 0.000 0%0.15 0.50 312 0.1000 11.73 0.075 0.482 PB:2.0 8,308 3174 0.191 0.073 38%0.34 0.58 100 0.2050 5.07 0.212 0.697 PB:2.1 534 534 0.012 0.012 100%0.90 0.96 10 0.0800 5.00 0.035 0.073 PB:3.0 1,033 20 0.024 0.000 2%0.16 0.51 64 0.2031 5.01 0.013 0.077 PB:4.0 1,009 342 0.023 0.008 34%0.32 0.57 47 0.2500 5.00 0.024 0.083 PB:5.0 2,484 50 0.057 0.001 2%0.16 0.51 28 0.1786 5.00 0.031 0.183 PB:6.0 695 695 0.016 0.016 100%0.90 0.96 5 0.0200 5.00 0.047 0.097 PB:6.1 339 339 0.008 0.008 100%0.90 0.96 5 0.0500 5.00 0.024 0.048 PB:6.2 122 122 0.003 0.003 100%0.90 0.96 5 0.0500 5.00 0.009 0.018 PB:7.0 450 270 0.010 0.006 60%0.46 0.63 5 0.0500 5.00 0.015 0.040 PB:8.0 1,351 1351 0.031 0.031 100%0.90 0.96 5 0.0500 5.00 0.091 0.187 PB:9.0 496 496 0.011 0.011 100%0.90 0.96 5 0.0500 5.00 0.032 0.067 PB:10.0 148 148 0.003 0.003 100%0.90 0.96 5 0.0500 5.00 0.009 0.018 PB:11.0 662 662 0.015 0.015 100%0.90 0.96 5 0.0500 5.00 0.044 0.091 PB:12.0 181 181 0.004 0.004 100%0.90 0.96 5 0.0410 5.00 0.012 0.024 PB:13.0 1,218 461 0.028 0.011 38%0.34 0.58 5 0.0240 5.00 0.031 0.103 PB:14.0 644 644 0.015 0.015 100%0.90 0.96 5 0.0350 5.00 0.044 0.091 PB:15.0 450 117 0.010 0.003 26%0.29 0.56 5 0.1000 5.00 0.009 0.036 PB:16.0 295 295 0.007 0.007 100%0.90 0.96 5 0.0500 5.00 0.021 0.042 Total 30201 9902 0.693 0.227 33%-----0.778 2.457 10/03/2018 4 Figure 2. Historical Basins 10/03/2018 5 Figure 3. Proposed Basins 10/03/2018 6 2.3.1 Historical Basin EB : 1 Historical Basin EB : 1 slopes to the north at 10% and encompasses the entire lot, as shown in Figure 2. The basin developed a historical 100-yr flowrate of 1.485 cfs. Refer to Appendix D for additional infor- mation. 2.3.1 Proposed Basin The flowpaths of the proposed basins are described in Table 1. Basin Information and Table 2. Basin Routing. Table 2. Basin Routing 3. Stormwater BMPs and Routing Low impact design has been utilized where possible to provide WQCV and detention. 9 Principles 1. Consider stormwater quality needs early in the design process. The architect and owner considered stormwater requirements early in the process. 2. Use the entire site when planning for stormwater quality treatment. Where possible, overland conveyance was utilized to increase the time stromwater is in contact with natural systems. 3. Avoid unnecessary impervious areas. Basin Node 1 Node 2 Node 3 Node 4 Node 5 Node 6 PB:1.0 Sheet Flow Offsite Offsite PB:2.0 Sheet Flow Driveway Trench Drain 1 & Inlet 8 & Inlet 9 & Planter 1 Pipe B Sand Filter PB:2.1 Sheet Flow Driveway Inlet 7 Pipe B Sand Filter PB:3.0 Sheet Flow Inlet 1 and 2 Pipe A Sand Filter PB:4.0 Sheet Flow Inlet 3 & 4 Pipe A Sand Filter PB:5.0 Sheet Flow Sand Filter PB:6.0 Sheet Flow Trench Drain 2 Pipe E Pipe A Sand Filter PB:6.1 Sheet Flow Inlet 6 & Planter 3 & 4 Pipe E Pipe A Sand Filter PB:6.2 Sheet Flow Trench Drain 3 Pipe F Pipe B Sand Filter PB:7.0 roof top flow Roof Drain 11 DS CONNECTION 2 Pipe C Pipe B Sand Filter PB:8.0 roof top flow Gutter 1 & Planter 2 Inlet 5 Pipe I Pipe A Sand Filter PB:9.0 roof top flow PB:11 Roof Drain 1, 2 & 3 DS CONNECTION 3 Pipe J Pipe A Sand Filter PB:10.0 roof top flow Roof Drain 12 DS CONNECTION 3 Pipe J Pipe A Sand Filter PB:11.0 roof top flow Roof Drain 1, 2 & 3 DS CONNECTION 3 Pipe J Pipe A Sand Filter PB:12.0 roof top flow Roof Drain 7 PB:2 Trench Drain 1 Pipe B Sand Filter PB:13.0 roof top flow Roof Drain 8, 9 & 10 DS CONNECTION 1 Pipe G Pipe B Sand Filter PB:14.0 roof top flow PB:11 Roof Drain 1, 2 & 3 DS CONNECTION 3 Pipe J Pipe A Sand Filter PB:15.0 roof top flow Roof Drain 4 & 5 Inlets 1 & 2 Pipe A Sand Filter PB:16.0 roof top flow Roof Drain 6 DS CONNECTION 3 Pipe J Pipe A Sand Filter 10/03/2018 7 Impervious areas were reduced where acceptable to the owner and the design team. 4. Reduce runoff rates and volumes to more closely match natural conditions. The proposed peak runoff rates are no greater than historical runoff rates. The historical flow paths are followed. 5. Integrate stormwater quality management and flood control. Through the use of onsite BMPs, stormwater quality management and flood control are integrated in the project. 6. Develop stormwater quality facilities that enhance the site, the community and the environment. The site, community and the environment are enhanced by reducing the amount of sediment and other river pollutants conveyed to the stream system. Hopefully, the use of these stormwater BMPs on this property and throughout the community will improve the water quality of the Roar- ing Fork River and its tributaries. 7. Use a treatment train approach. Where possible a treatment train approach was utilized—such as the portion of the yard that sheet flows to the sand filter. 8. Design sustainable facilities that can be safely maintained. The stormwater BMPs located onsite can be easily and safely maintained and are readily accessi- ble. 9. Design and maintain facilities with public safely in mind. Elevation drops to stormwater BMPs are minimal and designed with public safely in mind. 3.1 General Low impact design has been utilized where possible to provide WQCV and detention. Basin Routing is described in Table 2, above. 3.1.1 Detention Calculation Overall, a total of 0.469 acres of the 0.693-acre site is detained and treated for water quality. The remain- der of the site is released offsite undetained. The historical release rate for the site is 1.485 cfs. In the proposed condition, 0.482 cfs is undetained leaving 1.003 cfs as our allowable release rate from the sand filter. To calculate water quality requirements, WCE calculated the total area of the basins, the impervious area of the basins, and time of concentration of the basins. Overall, the basins total area equals 0.469 acres, while the impervious area equals 0.227 acres or 48.5% impervious. The area weighted time of concentra- tion for existing basins was found to be 5.03 minutes (see Table 3 for calculation). Based on an overall imperviousness of 48.5% percent, the WQCV in watershed inches is 0.095 in (see Appendix D). In terms of volume, the WQCV over the tributary area of 0.469 acres is 161 cf (0.469 ac X 43560 sf/ac X 0.095 in X 1 ft / 12 in). The proposed grading of the site, as well as pipe networks, route runoff into the sand filter play area along the north end of the lot. This area provides 405 cf of detention which is adequate for the detention required for the 100 year storm of 340 cf. 10/03/2018 8 Table 3. Calculation of Area Weighted Time of Concentration 3.1.2 Outlet Calculation A 6-in standpipe will be utilized as the outlet. The standpipe will bend and travel to the daylight location at a slope of 1.33%. The slope of the pipe will control the discharge to a rate of 1.003 cfs (the allowable release rate). In addition, the outflow velocity will be 5.23 ft/s. Due to the velocity, a scour stop mat will be utilized to slow the exit velocity of the 100-yr release. For more information, refer to Appendix D. 3.2 Pipe Calculations Runoff is collected by inlets and roof drains before discharging to a number of pipes. Pipes A-M collect flows and direct them to the sand filter. Rather than provide a narrative of each pipe, two tables are pro- vided below. Table 4 describes the flow path from basin to final discharge location. A second table, Ta- ble 5 provides the total flow collected by the pipe as well as the pipelines’ lowest slope condition and smallest pipe condition. The table also provides the critical pipe’s flow capacity. BASIN NO.TOTAL BASIN AREA (SF) IMPERVIOUS AREA (SF) TOTAL BASIN AREA (ACRES) IMPERVIOUS AREA (ACRES) % IMPERVIOUS Tc (min)PEAK FLOW 5YR (CFS) PEAK FLOW 100YR (CFS) Tc X Basin Area PB:2.0 8308.200 3173.540 0.191 0.073 38.20%5.07 0.21 0.70 42122.57 PB:2.1 533.850 534.000 0.012 0.012 100.03%5.00 0.04 0.07 2669.25 PB:3.0 1033.480 20.000 0.024 0.000 1.94%5.01 0.01 0.08 5177.73 PB:4.0 1009.280 342.000 0.023 0.008 33.89%5.00 0.02 0.08 5046.40 PB:5.0 2483.750 50.000 0.057 0.001 2.01%5.00 0.03 0.18 12418.75 PB:6.0 694.900 694.900 0.016 0.016 100.00%5.00 0.05 0.10 3474.50 PB:6.1 339.310 339.310 0.008 0.008 100.00%5.00 0.02 0.05 1696.55 PB:6.2 122.420 122.420 0.003 0.003 100.00%5.00 0.01 0.02 612.10 PB:7.0 450.300 270.460 0.010 0.006 60.06%5.00 0.02 0.04 2251.50 PB:8.0 1350.690 1350.690 0.031 0.031 100.00%5.00 0.09 0.19 6753.45 PB:9.0 496.140 496.140 0.011 0.011 100.00%5.00 0.03 0.07 2480.70 PB:10.0 148.220 148.220 0.003 0.003 100.00%5.00 0.01 0.02 741.10 PB:11.0 662.130 662.130 0.015 0.015 100.00%5.00 0.04 0.09 3310.65 PB:12.0 180.880 180.880 0.004 0.004 100.00%5.00 0.01 0.02 904.40 PB:13.0 1218.160 461.410 0.028 0.011 37.88%5.00 0.03 0.10 6090.80 PB:14.0 644.310 644.310 0.015 0.015 100.00%5.00 0.04 0.09 3221.55 PB:15.0 449.590 117.000 0.010 0.003 26.02%5.00 0.01 0.04 2247.95 PB:16.0 295.060 295.060 0.007 0.007 100.00%5.00 0.02 0.04 1475.30 Total 20420.670 9902.470 0.469 0.227 48.49%1.98 102695 Weighted Average 5.03 10/03/2018 9 Table 4. Flow Path Basin Node 1 Node 2 Node 3 Node 4 Node 5 Node 6 PB:1.0 Sheet Flow Offsite Offsite PB:2.0 Sheet Flow Driveway Trench Drain 1 & Inlet 8 & Inlet 9 & Planter 1 Pipe B Sand Filter PB:2.1 Sheet Flow Driveway Inlet 7 Pipe B Sand Filter PB:3.0 Sheet Flow Inlet 1 and 2 Pipe A Sand Filter PB:4.0 Sheet Flow Inlet 3 & 4 Pipe A Sand Filter PB:5.0 Sheet Flow Sand Filter PB:6.0 Sheet Flow Trench Drain 2 Pipe E Pipe A Sand Filter PB:6.1 Sheet Flow Inlet 6 & Planter 3 & 4 Pipe E Pipe A Sand Filter PB:6.2 Sheet Flow Trench Drain 3 Pipe F Pipe B Sand Filter PB:7.0 roof top flow Roof Drain 11 DS CONNECTION 2 Pipe C Pipe B Sand Filter PB:8.0 roof top flow Gutter 1 & Planter 2 Inlet 5 Pipe I Pipe A Sand Filter PB:9.0 roof top flow PB:11 Roof Drain 1, 2 & 3 DS CONNECTION 3 Pipe J Pipe A Sand Filter PB:10.0 roof top flow Roof Drain 12 DS CONNECTION 3 Pipe J Pipe A Sand Filter PB:11.0 roof top flow Roof Drain 1, 2 & 3 DS CONNECTION 3 Pipe J Pipe A Sand Filter PB:12.0 roof top flow Roof Drain 7 PB:2 Trench Drain 1 Pipe B Sand Filter PB:13.0 roof top flow Roof Drain 8, 9 & 10 DS CONNECTION 1 Pipe G Pipe B Sand Filter PB:14.0 roof top flow PB:11 Roof Drain 1, 2 & 3 DS CONNECTION 3 Pipe J Pipe A Sand Filter PB:15.0 roof top flow Roof Drain 4 & 5 Inlets 1 & 2 Pipe A Sand Filter PB:16.0 roof top flow Roof Drain 6 DS CONNECTION 3 Pipe J Pipe A Sand Filter 10/03/2018 10 Table 5. Pipe Properties 3.3 Inlet Calculations Runoff is collected by 9 inlets, 4 planter drains, 3 trench drains and roof drains before discharging to a number of pipes. Table 6, below describes the total tributary flow by basin to the structures. It also pro- vides the 50% grate capacities to compare to the required capacity for each structure. Basin Pipe A Pipe B Pipe C Pipe D Pipe E Pipe F Pipe G Pipe H Pipe I Pipe J Pipe K Pipe L Pipe M Offsite Sheet Flow PB:1.0 0.482 PB:2.0 0.697 PB:2.1 0.073 PB:3.0 0.077 PB:4.0 0.083 PB:5.0 0.183 PB:6.0 0.097 0.097 PB:6.1 0.048 0.048 PB:6.2 0.018 0.018 PB:7.0 0.040 0.040 PB:8.0 0.187 0.187 PB:9.0 0.067 0.067 PB:10.0 0.018 0.018 PB:11.0 0.091 0.091 PB:12.0 0.024 PB:13.0 0.103 0.103 PB:14.0 0.091 0.091 PB:15.0 0.036 PB:16.0 0.042 0.042 Total Runoff to Convey 0.837 0.955 0.040 0.000 0.145 0.018 0.103 0.000 0.187 0.309 0.000 0.000 0 0.482 0.183 Min Slope (%)2.00%1.56%20.00%9.15%15.90%20.00%20.00%2.00%20.00%20.00%5.00%2.00%20.00%N/A N/A Pipe Diameter (in)6 6 4 4 4 4 4 4 4 4 4 4 4 N/A N/A Flow Capacity @ 80% (cfs)1.120 0.989 1.169 0.791 1.043 1.169 1.169 0.370 1.169 1.169 0.585 0.370 1.169 N/A N/A Capacity > Required?TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE N/A N/A 10/03/2018 11 Table 6. Inlet Properties BasinNotesInlet 1Inlet 2Inlet 3Inlet 4Inlet 5Inlet 6Inlet 7Inlet 8Inlet 9Planter 1Planter 2Planter 3Planter 4Trench Drain 1Trench Drain 2Trench Drain 3OtherPB:1.0Offsite via sheet flow.0.482PB:2.0Trench Drain 1 has capacity for entire tributary 0.0000.0000.0000.697PB:2.10.073PB:3.0Inlets 1 and 2 collect 50% of the basin each.0.0390.039PB:4.0Inlet 4 captures Basin PB:4, Inlet 3 is a patio drain that captures nuisance flows.0.0000.083PB:5.0Sheet flow to sand filters.0.183PB:6.00.097PB:6.1Inlet 6 captures flows. Planter drains 3 & 4 are 0.0480.0000PB:6.20.018PB:7.0Roof drains.0.040PB:8.0Inlet 5 is sized to capture the entire basin. A portion of the basin is captured by the stormwater runnel. Planter 2 collects nuisance flows.0.1870.000PB:9.0Roof drains.0.067PB:10.0Roof drains.0.018PB:11.0Roof drains.0.091PB:12.00.024PB:13.0Roof drains.0.103PB:14.0Roof drains.0.091PB:15.0Roof drains. Captured by Inlets 1 and 2. 50% 0.0180.018PB:16.0Roof drains.0.042Total0.0570.0570.0000.0830.1870.0480.0730.0000.0000.0000.0000.0000.0000.7210.0970.0181.117Grate Type9-in Square9-in Square4-in Round9-in Square(2) 9-in Square9-in Square9-in Square9-in Square9-in SquareSioux ChiefSioux ChiefSioux ChiefSioux Chief32-ft 6-in31-ft slot15-ft slotFlow Capacity 50% Reduction0.0970.0970.0130.0970.1940.0970.0970.0970.097n/an/an/an/a3.4880.2170.105Capacity > Required?TRUETRUETRUETRUETRUETRUETRUETRUETRUEn/an/an/an/aTRUETRUETRUE10/03/2018 12 3.3.1 Operation and maintenance Table 4. presents the recommended maintenance procedures for rain gardens as found in Table 8.14 of the URMP. Table 7. Maintenance recommendations (URMP Table 8.14) 10/03/2018 Appendix A--NRCS Soils Report 10/03/2018 United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties Natural Resources Conservation Service June 20, 2017 10/03/2018 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 10/03/2018 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 10/03/2018 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 Soil Map.................................................................................................................. 8 Soil Map................................................................................................................9 Legend................................................................................................................10 Map Unit Legend................................................................................................12 Map Unit Descriptions........................................................................................ 12 Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties................................................................................................... 14 14—Callings-Yeljack complex, 25 to 65 percent slopes..............................14 117—Yeljack-Callings complex, 12 to 25 percent slopes............................15 References............................................................................................................18 4 10/03/2018 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 10/03/2018 scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and Custom Soil Resource Report 6 10/03/2018 identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 7 10/03/2018 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 10/03/2018 9 Custom Soil Resource Report Soil Map 43384204338430433844043384504338460433847043384804338490433850043385104338520433853043385404338420433843043384404338450433846043384704338480433849043385004338510433852043385304338540340010 340020 340030 340040 340050 340060 340070 340080 340090 340100 340010 340020 340030 340040 340050 340060 340070 340080 340090 340100 39° 10' 53'' N 106° 51' 8'' W39° 10' 53'' N106° 51' 4'' W39° 10' 49'' N 106° 51' 8'' W39° 10' 49'' N 106° 51' 4'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 30 60 120 180 Feet 0 5 10 20 30 Meters Map Scale: 1:622 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. 10/03/2018 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties Survey Area Data: Version 7, Sep 22, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 12, 2011—Sep 22, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background Custom Soil Resource Report 10 10/03/2018 MAP LEGEND MAP INFORMATION imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 11 10/03/2018 Map Unit Legend Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties (CO655) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 14 Callings-Yeljack complex, 25 to 65 percent slopes 0.2 11.5% 117 Yeljack-Callings complex, 12 to 25 percent slopes 1.7 88.5% Totals for Area of Interest 1.9 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the Custom Soil Resource Report 12 10/03/2018 development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 13 10/03/2018 Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties 14—Callings-Yeljack complex, 25 to 65 percent slopes Map Unit Setting National map unit symbol: jq4z Elevation: 7,500 to 9,500 feet Mean annual precipitation: 18 to 20 inches Mean annual air temperature: 39 to 41 degrees F Frost-free period: 70 to 80 days Farmland classification: Not prime farmland Map Unit Composition Callings and similar soils: 50 percent Yeljack and similar soils: 40 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Callings Setting Landform: Ridges, mountain slopes Landform position (three-dimensional): Mountainflank Down-slope shape: Convex Across-slope shape: Convex Parent material: Alluvium derived from sandstone and/or colluvium derived from sandstone Typical profile H1 - 0 to 6 inches: loam H2 - 6 to 12 inches: gravelly loam H3 - 12 to 34 inches: very cobbly clay loam H4 - 34 to 53 inches: very gravelly clay loam H5 - 53 to 60 inches: very cobbly sandy clay loam Properties and qualities Slope: 25 to 65 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Very high Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Moderate (about 6.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: C Ecological site: Brushy Loam (R048AY238CO) Other vegetative classification: BRUSHY LOAM (null_4) Custom Soil Resource Report 14 10/03/2018 Hydric soil rating: No Description of Yeljack Setting Landform: Mountain slopes Landform position (three-dimensional): Mountainflank Down-slope shape: Linear Across-slope shape: Linear Parent material: Alluvium derived from sandstone and/or eolian deposits Typical profile H1 - 0 to 10 inches: silt loam H2 - 10 to 24 inches: silty clay loam H3 - 24 to 60 inches: clay loam Properties and qualities Slope: 25 to 65 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Very high Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.60 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: High (about 11.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: C Ecological site: Mountain Loam (R048AY228CO) Other vegetative classification: Mountain Loam (null_42) Hydric soil rating: No 117—Yeljack-Callings complex, 12 to 25 percent slopes Map Unit Setting National map unit symbol: jq4t Elevation: 7,500 to 9,500 feet Mean annual precipitation: 18 to 20 inches Mean annual air temperature: 39 to 41 degrees F Frost-free period: 70 to 80 days Farmland classification: Not prime farmland Map Unit Composition Yeljack and similar soils: 50 percent Callings and similar soils: 40 percent Estimates are based on observations, descriptions, and transects of the mapunit. Custom Soil Resource Report 15 10/03/2018 Description of Yeljack Setting Landform: Structural benches, mountains Landform position (three-dimensional): Mountainflank Down-slope shape: Linear Across-slope shape: Linear Parent material: Alluvium derived from sandstone and/or eolian deposits Typical profile H1 - 0 to 10 inches: silt loam H2 - 10 to 24 inches: silty clay loam H3 - 24 to 60 inches: clay loam Properties and qualities Slope: 12 to 25 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.60 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: High (about 11.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: C Ecological site: Mountain Loam (R048AY228CO) Other vegetative classification: Mountain Loam (null_42) Hydric soil rating: No Description of Callings Setting Landform: Ridges, mountains Landform position (three-dimensional): Mountainflank Down-slope shape: Linear Across-slope shape: Linear Parent material: Alluvium derived from sandstone and/or colluvium derived from sandstone Typical profile H1 - 0 to 6 inches: loam H2 - 6 to 12 inches: gravelly loam H3 - 12 to 34 inches: very cobbly clay loam H4 - 34 to 53 inches: very gravelly clay loam H5 - 53 to 60 inches: very cobbly sandy clay loam Properties and qualities Slope: 12 to 25 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Custom Soil Resource Report 16 10/03/2018 Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Moderate (about 6.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: C Ecological site: Brushy Loam (R048AY238CO) Other vegetative classification: BRUSHY LOAM (null_4) Hydric soil rating: No Custom Soil Resource Report 17 10/03/2018 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 18 10/03/2018 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 19 10/03/2018 2 Appendix B--FEMA FIRM Map 10/03/2018 10/03/2018 3 Appendix C--Plan Set 10/03/2018 7/19/2018DATE OF PUBLICATIONC100COVER SHEETTHUNDERBOWL 395 THUNDERBOWL LN. ASPEN, CO 816111/11/2018PERMITWOODY CREEK ENGINEERING, LLCP.O. BOX 575WOODY CREEK, COLORADO 81656(P): 970-429-8297WOODYCREEKENGINEERING.COMTHUNDERBOWL395 THUNDERBOWL LN. ASPEN, CO81611NOTES:1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLICIMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS ANDSPECIFICATIONS SET FORTH IN THE CITY OF ASPEN ("COA") MUNICIPALCODE, COA TECHNICAL MANUALS, AND APPLICABLESTATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEENTHESE PLANS AND THE TECHNICAL MANUAL OR ANY APPLICABLESTANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL UTILITYWORK SHALL BE INSPECTED AND APPROVED BY THE UTILITY.2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATIONAND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ISBASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHEREPOSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOTTO BE RELIED UPON AS BEING EXACT OR COMPLETE.3.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THEAPPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE CRITERIA ANDSPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSIONAGREEMENTS NEEDED FOR THE JOB ONSITE AT ALL TIMES.4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OFSAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING,SHORING,TRAFFIC CONTROL, AND SECURITY.5.IF DURING THE CONSTRUCTION PROCESS CONDITIONS AREENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOTIDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALLCONTACT THE WOODY CREEK ENGINEERING, LLC IMMEDIATELY.6.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TOTHE LATEST REVISION OF SAID STANDARD UNLESS SPECIFICALLY STATEDOTHERWISE.7.THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN INACCORDANCE WITH MUTCD TO THE APPROPRIATE RIGHT-OF-WAYAUTHORITY (TOWN, COUNTY OR STATE) FOR APPROVAL PRIOR TO ANYCONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALLTRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THECONSTRUCTION ACTIVITIES.8.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR ANDMATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDEDIMPROVEMENTS SHOWN ON THESE DRAWINGS OR AS DESIGNATED TO BEPROVIDED, INSTALLED, OR CONSTRUCTED UNLESS SPECIFICALLYNOTED OTHERWISE.9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYSFREE AND CLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROMTHE SITE.10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING AS-BUILTINFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THECONSTRUCTION SITE AND AVAILABLE AT ALL TIMES.11.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BESCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN,CONTACT WOODY CREEK ENGINEERING, LLC FOR CLARIFICATION ANDANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.15. THE CONTRACTOR SHALL COMPLY WITH ALL TERMS AND CONDITIONS OFTHE COLORADO PERMIT FOR STORM WATER DISCHARGE, THE STORMWATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN.16.ALL STRUCTURAL EROSION CONTROL MEASURES SHALL BEINSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO ANY OTHEREARTH-DISTURBING ACTIVITY. ALL EROSION CONTROL MEASURES SHALL BEMAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME ASTHE ENTIRE DISTURBED AREA IS STABILIZED WITH HARD SURFACE ORLANDSCAPING.17.THE CONTRACTOR SHALL SEQUENCE INSTALLATION OF UTILITIES INSUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. INGENERAL, STORM SEWER AND SANITARY SEWER SHOULD BECONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRYUTILITIES.VICINITY MAP0100 200 400 800Scale: 1" = 200'N7/20/2018CHANGE ORDER 11/11/20187/20/201810/03/2018 EB:1 AREA: 0.69 Acre 30196.82 SF 8250.008255.008260. 0 0 8250.00 8255.00 82 6 0 . 0 0 8240.0 0 8245.00 8240.00 8245. 0 0 MATCH DRIVEWAY/45.0 46.0 47.0 48.0 46.5 46.5 47.0 46.5 46.5 48.0 48.0 50.0 52.0 49.0 54.0 52.0 50.0 51.0 56.0 50.0 52.0 51.5 53.0 53.0 54.0 54.0 55.0 +2' above FG/46.5 +1.5' above FG/46.0 +1.5' above FG/47.0 +1.5' above FG/47.0 +1' above FG/46.5 46.547.5 45.5 PB:8 1351 SF PB:7 450 SF PB:4.0 1009 SF PB:14 644 SF PB:1.0 9780 SF PB:11 662 SF PB:3.0 1033 SF PB:2.0 8308 SF PB:6.0 695 SF PB:13 1218 SF PB:16 295 SF PB:9 496 SF PB:5.0 2484 SF PB:10 148 SF PB:15 450 SF PB:12 181 SF PB:6.1 339 SF PB:6.2 122 SF PB:2.1 534 SF 8250.008255.008260. 0 0 8250.00 8255.00 82 6 0 . 0 0 8240.0 0 8245.00 8240.00 8245. 0 0 7/19/2018 DATE OF PUBLICATION C200 BASINSTHUNDERBOWL 395 THUNDERBOWL LN.ASPEN, CO 816111/18/2018 PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM EXISTING BASINS PROPOSED BASINS 0 10 20 40 80 Scale: 1" = 20' N 7/20/2018 CHANGE ORDER 1 1/11/20187/20/2018 10/03/2018 MATCH DRIVEWAY/45.0 46.0 47.0 48.0 46.5 46.5 47.0 46.5 46.5 48.0 48.0 50.0 52.0 49.0 54.0 52.0 50.0 51.0 56.0 50.0 52.0 51.5 53.0 53.0 54.0 54.0 55.0 +2' above FG/46.5 +1.5' above FG/46.0 +1.5' above FG/47.0 +1.5' above FG/47.0 +1' above FG/46.5 46.547.5 45.5 8247 0+000+57-4.0% TW: 8252.00 TW: 8246.00 PLANTER8245.218245.718246.21TW: 8248.00 TW: 8248.00 TW: 8253.00 TW: 8256.00 TW: 8247.50 TW: 8248.00-0.1%7/19/2018 DATE OF PUBLICATION C300 G&D OVERVIEWTHUNDERBOWL395 THUNDERBOWL LN.ASPEN, CO 816111/18/2018 PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 10 20 40 80 Scale: 1" = 20' N 7/20/2018 CHANGE ORDER 1 EXISTING CONTOUR PROPOSED CONTOUR7910 SPOT ELEVATION XXXX.XX CONC. = CONCRETE HP = HIGH POINT TD = TRENCH DRAIN PROPERTY LINE FLOW PATHS PIPE SUMMARY INLET SUMMARY 1/11/20187/20/2018 10/03/2018 8250.008250.00 8255.00 8240.0 0 8245.00 8240.00 8245. 0 0 8247 BW: 8246.98 8245.21 8247.56 8246.69 8246.02 8246.36 8245.50 8244.85 8243.29 8243.00 8243.51 8250.18 8255.31 8245.21 8245.21 8245.00 8244.91-8.0%- 28 .9%5.6%-25.4%0.0%-2.4%8245.00 8238.00 8238.00 10.00' Activity Envelope 5.0' Activity Envelope N 42°9'23" E 171.22'Bui ld ing Enve lope Building E n v e l o p e 10' Private Ski Easment & 10' Sewer Easement 5.0' Activity Envelope 10.0' Utility Easement -3.4%-6.7%-0.9%-1.1%TRENCH DRAIN - 32 FT RIM:8244.73 INV IN:8242.24 6" PVC INV IN:8242.24 6" PVC INV OUT:8242.24 6" PVC -3.3%8245.218244.918244.91 8244.918244.91 8244.75 8244.75 -4.0%-5.0%-5.0%-0.6%8245.55 8246.37 8247.00 8247.50 8255.60 TW: 8246.00 PLANTER -10.0% -10.0%8245.218245.718246.21-1.9%-1.9%- 1 . 9% 8246.18 8245.90 8246.00 8246.00 8246.33 8246.508246.50 8247.01 8244.94 8244.94 8244.94 8244.94 8245.05 8245.05 8244.94 8244.94 8244.85 8245.08 8245.218245.21 8245.21 8245.21 8245.218245.21 8245.05 8245.05 8245.05 8244.008244.00 INLET-6 RIM:8243.80 INV IN:8242.34 4" PVC INV OUT:8242.34 4" PVC DOWNSPOUT CONNECTION 3 CONNECT ROOF DRAINS 1, 2, 3 & 12 RIM:8246.03 INV OUT:8242.89 4" PVC INLET-3 RIM:8245.07 INV OUT:8242.84 4" PVC INLET-1 RIM:8248.46 INV OUT:8245.96 6" PVC INLET-2 RIM:8250.18 INV IN:8245.42 6" PVC INV OUT:8242.39 6" PVC INLET-9 RIM:8244.71 INV OUT:8242.42 4" PVC INLET-8 RIM:8247.48 INV OUT:8243.00 4" PVC DOWNSPOUT CONNECTION 1 CONNECT ROOF DRAIN 8, 9 & 10 RIM:8245.59 INV OUT:8241.70 4" PVC DOWNSPOUT CONNECTION 2 CONNECT ROOF DRAIN 11 RIM:8244.03 INV OUT:8240.30 4" PVC INLET-7 RIM:8245.97 INV IN:8240.15 6" PVC INV OUT:8240.15 6" PVC INLET-5 RIM:8243.91 INV OUT:8241.49 4" PVC 8245.848245.84 TRENCH DRAIN 2 TRENCH DRAIN 3 TRENCH DRAIN 1TW: 8247.50 8240.00 8241.0 0 824 2 . 0 0 8243.00 824 4 . 0 0 824 5 . 0 0 824 6 . 0 0 8246.008247.00 825 5 . 0 0 8 2 5 2 . 0 0 8253.00 8246.00 8247.00 8246.00 8 2 4 8 . 0 0 8245.00 8242. 0 0 8241. 0 0 8240. 0 0 8239. 0 08238. 0 0 PLANTER 1 RIM:8245.69 INV OUT:8241.77 4" TEE 1 RIM:8244.87 INV IN:8241.93 6" PVC INV IN:8241.93 4" PVC INV OUT:8241.93 6" PVC PIPE H 24.45' of 4" PVC @ 2.00% TEE 2 RIM:8245.21 INV IN:8241.36 6" PVC INV IN:8241.36 4" INV OUT:8241.36 6" PVC PIPE L 20.42' of 4" @ 2.00% TEE 3 RIM:8245.37 INV IN:8239.80 6" PVC INV IN:8239.80 4" PVC INV OUT:8239.80 6" PVC PIPE G 9.52' of 4" PVC @ 20.00% TEE 4 RIM:8243.58 INV IN:8238.73 6" PVC INV IN:8238.73 4" PVC INV OUT:8238.73 6" PVC PIPE C 7.83' of 4" PVC @ 20.00% TEE 5 RIM:8243.48 INV IN:8238.55 4" PVC INV IN:8238.55 6" PVC INV OUT:8238.55 6" PVC PIPE F 6.40' of 4" PVC @ 20.00% TD 3 OUTLET RIM:8244.87 INV IN:8244.05 6" PVC INV OUT:8239.83 4" PVC TEE 6 RIM:8245.12 INV IN:8242.24 6" PVC INV IN:8242.24 4" PVC INV OUT:8242.24 6" PVC PIPE K 12.03' of 4" PVC @ 5.00% PIPE J 4.42' of 4" PVC @ 20.00% INLET 4 RIM:8245.51 INV IN:8242.01 6" PVC INV IN:8242.01 4" PVC INV OUT:8242.01 6" PVC PIPE I 3.35' of 4" PVC @ 20.00% TEE 7 RIM:8243.62 INV IN:8240.82 6" PVC INV IN:8240.82 4" PVC INV OUT:8240.82 6" PVC TEE 8 RIM:8243.51 INV IN:8240.47 6" PVC INV IN:8240.47 4" PVC INV OUT:8240.47 6" PVC PLANTER 2 RIM:8244.57 INV OUT:8242.54 4" PVC PIPE M 10.36' of 4" PVC @ 20.00% TEE 9 RIM:8243.52 INV IN:8240.09 6" PVC INV IN:8240.09 4" PVC INV OUT:8240.09 6" PVC PIPE E 14.15' of 4" PVC @ 15.90% TRENCH DRAIN 2 31.68' of 6" PVC @ 2.00% TD 2 OUTLET RIM:8244.42 INV IN:8243.82 6" PVC INV OUT:8242.54 4" PVC PLANTER 3 RIM:8246.44 INV IN:8242.45 4" PVC INV IN:8242.45 4" INV OUT:8242.45 4" PVC PLANTER 4 RIM:8246.44 INV OUT:8242.65 4"-0.1%82 4 5 . 0 0 8 2 4 3 . 0 0 8245.088244.00 PIPE D 20.32' of 4" PVC @ 9.15% 15.62' of 6" PVC @ 2.00% TEE 2A RIM:8245.47 INV IN:8241.14 6" PVC INV IN:8241.14 4" PVC INV OUT:8241.14 6" PVC 10.67' of 4" PVC @ 1.33% 13.32' of 4" PVC @ 1.33% 7/19/2018 DATE OF PUBLICATION C301 G&D NORTHTHUNDERBOWL395 THUNDERBOWL LN.ASPEN, CO 816111/11/2018 PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N EXISTING CONTOUR PROPOSED CONTOUR7910 SPOT ELEVATION XXXX.XX CONC. = CONCRETE HP = HIGH POINT TD = TRENCH DRAIN PROPERTY LINE 7/20/2018 CHANGE ORDER 1 1/11/20187/20/2018 10/03/2018 MATCH DRIVEWAY/45.0 46.0 47.0 48.0 46.5 46.5 47.0 46.5 46.5 48.0 48.0 50.0 52.0 49.0 54.0 52.0 50.0 51.0 56.0 50.0 52.0 51.5 53.0 53.0 54.0 54.0 55.0 +2' above FG/46.5 +1.5' above FG/46.0 +1.5' above FG/47.0 +1.5' above FG/47.0 +1' above FG/46.5 46.547.5 45.5 8247 TW: 8256.00 BW: 8246.98 TW: 8248.00 BW: 8245.50 8245.21 8247.56 8246.69 8246.02 8246.36 8245.50 8244.85 8243.29 8243.00 8243.51 8250.18 BW: 8253.00 BW: 8253.00 8255.31 8256.97 8245.21 8245.21 8245.00 8251.97 8249.88 TW: 8253.00 TW: 8253.00 BW: 8248.00 TW: 8255.99 BW: 8253.00 BW: 8248.00 BW: 8248.00 BW: 8249.50 8249.50 8244.91 TW: 8248.00 -27.1%-8.0%-28 .9%-25.4%-22 .0% 0.0%-2.4%8245.00 5.0' Activity Envelope N 18°46 '46" W 157.88 'Bui ld ing Enve lope Building E n v e l o p e 10' Private Ski Easment & 10' Sewer Easement -3.4%-6.7%-0.9%-1.1%-2 . 2 % TRENCH DRAIN - 32 FT RIM:8244.73 INV IN:8242.24 6" PVC INV IN:8242.24 6" PVC INV OUT:8242.24 6" PVC 0+000+57-3.3%8245.218244.918244.91 8244.918244.91 8244.75 8244.75 -4.0%-5.0%-5.0%-0.6%8245.55 8246.37 8244.81 BW: 8245.00 BW: 8244.54 8245.02 8245.11 8245.50 8245.25 8247.00 8247.50 8247.80 TW: 8252.00 8255.60 TW: 8246.00 PLANTER -10.0% -10.0%8245.218245.718246.21-1.9%-1.9%-1 . 9% 8246.18 8245.90 8246.00 8246.00 8246.33 8246.508246.50 8247.01 8244.94 8244.94 8244.94 8244.94 8245.05 8245.05 8244.94 8244.94 8244.85 8245.08 8245.218245.21 8245.21 8245.21 8245.218245.21 8245.05 8245.05 8245.05 8244.008244.00 TW: 8248.00 INLET-6 RIM:8243.80 INV IN:8242.34 4" PVC INV OUT:8242.34 4" PVC DOWNSPOUT CONNECTION 3 CONNECT ROOF DRAINS 1, 2, 3 & 12 RIM:8246.03 INV OUT:8242.89 4" PVC INLET-3 RIM:8245.07 INV OUT:8242.84 4" PVC INLET-1 RIM:8248.46 INV OUT:8245.96 6" PVC INLET-2 RIM:8250.18 INV IN:8245.42 6" PVC INV OUT:8242.39 6" PVC INLET-9 RIM:8244.71 INV OUT:8242.42 4" PVC INLET-8 RIM:8247.48 INV OUT:8243.00 4" PVC DOWNSPOUT CONNECTION 1 CONNECT ROOF DRAIN 8, 9 & 10 RIM:8245.59 INV OUT:8241.70 4" PVC DOWNSPOUT CONNECTION 2 CONNECT ROOF DRAIN 11 RIM:8244.03 INV OUT:8240.30 4" PVC INLET-7 RIM:8245.97 INV IN:8240.15 6" PVC INV OUT:8240.15 6" PVC INLET-5 RIM:8243.91 INV OUT:8241.49 4" PVC TW: 8248.00 TW: 8253.00 TW: 8256.00 8253.00 8245.848245.84 TRENCH DRAIN 2 TRENCH DRAIN 3 TRENCH DRAIN 1TW: 8247.50 TW: 8248.008240.00 8241.0 0 82 4 2 . 0 0 8243.00 824 4 . 0 0 824 5 . 0 0 824 6 . 0 0 8246.008247.00 8248.0 0 8249.008251.00 8253.00 8255.00 8260.00 826 2 . 0 0 8255 . 0 0 8 2 6 0 . 0 0 8 2 5 2 . 0 0 8253.00 8246.00 8247.00 8246.00 8 2 4 8 . 0 0 8245.00 8242. 0 0 8241. 0 0 8240. 0 0 8245. 00 PLANTER 1 RIM:8245.69 INV OUT:8241.77 4" TEE 1 RIM:8244.87 INV IN:8241.93 6" PVC INV IN:8241.93 4" PVC INV OUT:8241.93 6" PVC PIPE H 24.45' of 4" PVC @ 2.00% TEE 2 RIM:8245.21 INV IN:8241.36 6" PVC INV IN:8241.36 4" INV OUT:8241.36 6" PVC PIPE L 20.42' of 4" @ 2.00% TEE 3 RIM:8245.37 INV IN:8239.80 6" PVC INV IN:8239.80 4" PVC INV OUT:8239.80 6" PVC PIPE G 9.52' of 4" PVC @ 20.00% TEE 4 RIM:8243.58 INV IN:8238.73 6" PVC INV IN:8238.73 4" PVC INV OUT:8238.73 6" PVC PIPE C 7.83' of 4" PVC @ 20.00% TEE 5 RIM:8243.48 INV IN:8238.55 4" PVC INV IN:8238.55 6" PVC INV OUT:8238.55 6" PVC PIPE F 6.40' of 4" PVC @ 20.00% TD 3 OUTLET RIM:8244.87 INV IN:8244.05 6" PVC INV OUT:8239.83 4" PVC TEE 6 RIM:8245.12 INV IN:8242.24 6" PVC INV IN:8242.24 4" PVC INV OUT:8242.24 6" PVC PIPE K 12.03' of 4" PVC @ 5.00% PIPE J 4.42' of 4" PVC @ 20.00% INLET 4 RIM:8245.51 INV IN:8242.01 6" PVC INV IN:8242.01 4" PVC INV OUT:8242.01 6" PVC PIPE I 3.35' of 4" PVC @ 20.00% TEE 7 RIM:8243.62 INV IN:8240.82 6" PVC INV IN:8240.82 4" PVC INV OUT:8240.82 6" PVC TEE 8 RIM:8243.51 INV IN:8240.47 6" PVC INV IN:8240.47 4" PVC INV OUT:8240.47 6" PVC PLANTER 2 RIM:8244.57 INV OUT:8242.54 4" PVC PIPE M 10.36' of 4" PVC @ 20.00% TEE 9 RIM:8243.52 INV IN:8240.09 6" PVC INV IN:8240.09 4" PVC INV OUT:8240.09 6" PVC PIPE E 14.15' of 4" PVC @ 15.90% TRENCH DRAIN 2 31.68' of 6" PVC @ 2.00% TD 2 OUTLET RIM:8244.42 INV IN:8243.82 6" PVC INV OUT:8242.54 4" PVC PLANTER 3 RIM:8246.44 INV IN:8242.45 4" PVC INV IN:8242.45 4" INV OUT:8242.45 4" PVC PLANTER 4 RIM:8246.44 INV OUT:8242.65 4"-0.1%824 5 . 0 0 8 2 4 3 . 0 0 8245.088244.00 PIPE D 20.32' of 4" PVC @ 9.15% 15.62' of 6" PVC @ 2.00% TEE 2A RIM:8245.47 INV IN:8241.14 6" PVC INV IN:8241.14 4" PVC INV OUT:8241.14 6" PVC 7/19/2018 DATE OF PUBLICATION C302 G&D SOUTHTHUNDERBOWL395 THUNDERBOWL LN.ASPEN, CO 816111/11/2018 PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N 7/20/2018 CHANGE ORDER 1 EXISTING CONTOUR PROPOSED CONTOUR7910 SPOT ELEVATION XXXX.XX CONC. = CONCRETE HP = HIGH POINT TD = TRENCH DRAIN TW=TOP OF WALL BW=BOTTOM OF WALL NULL=GRADE PROPERTY LINE FLOW PATH 1/11/20187/20/2018 10/03/2018 ElevationStation PIPE A PROFILE 8238 8239 8240 8241 8242 8243 8244 8245 8246 8247 8248 8249 8250 8251 8252 -0+020+00 0+25 0+50 0+75 1+00 1+25 1+35 EXISTING PROPOSED 10.72' of 6" PVC @ 5.00% 7.50' of 6" PVC @ 2.00% 13.85' of 6" PVC @ 2.00% 6.37' of 6" PVC @ 2.00% 28.14' of 6" PVC @ 2.80% 6.97' of 6" PVC @ 5.00% INLET-2 RIM:8250.18 INV IN:8245.42 6" PVC INV OUT:8242.39 6" PVC INLET-1 RIM:8248.46 INV OUT:8245.96 6" PVC INLET 4 RIM:8245.51 INV IN:8242.01 6" PVC INV IN:8242.01 4" PVC INV OUT:8242.01 6" PVC 41.87' of 6" PVC @ 5.00% 7.50' of 6" PVC @ 5.00% 7/19/2018 DATE OF PUBLICATION C400 PIPE PROFILESTHUNDERBOWL395 THUNDERBOWL LN.ASPEN, CO 816111/11/18 PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 7/20/2018 CHANGE ORDER 1 1/11/20187/20/2018 10/03/2018 ElevationStation Pipe B PROFILE 8238 8239 8240 8241 8242 8243 8244 8245 8246 8247 8248 8249 8250 8251 -0+020+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 1+80 EXISTING PROPOSED 12.48' of 6" PVC @ 2.52%17.18' of 6" PVC @ 2.59% 35.39' of 6" PVC @ 1.56%21.35' of 6" PVC @ 2.53% INLET-7 RIM:8245.97 INV IN:8240.15 6"PVC INV IN:8240.15 6" PVC INV OUT:8240.15 6" PVC 13.29' of 6" PVC @ 2.67% 8.81' of 6" PVC @ 2.01% TRENCH DRAIN - 32 FT RIM:8244.73 INV IN:8242.24 6" PVC INV IN:8242.24 6" PVC INV OUT:8242.24 6" PVC 22.42' of 6" PVC @ 2.52%8.98' of 6" PVC @ 2.52% 40.07' of 6" PVC @ 2.67% 7/19/2018 DATE OF PUBLICATION C401 PIPE PROFILESTHUNDERBOWL395 THUNDERBOWL LN.ASPEN, CO 816111/11/2018 PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 7/20/2018 CHANGE ORDER 1/11/20187/20/2018 10/03/2018 6-IN OUTLET PIPE SLOPE=1.33% 2" DISCHARGE PIPE CHECK VALVES LIFT OUT ADAPTERS 4"Ø FOUNDATION DRAIN COLLECTOR PIPER FOUNDATION DRAIN LIFT STATION PLAN PRECAST 40" RISERS PIPES IN (SEE PLAN) PRECAST SOLID REMOVABLE LID STANDARD RISER SECTION(S) WITH NATIVE BACKFILL PERFORATED RISER SECTION(S) WITH 3 4" WASHED ROCK 2 FT AROUND DRYWELL AND 1 FT BELOW THE DRYWELL NOTES: 1. PRECAST MANHOLE TO MEET ASTM C-467. 2. THE EDGE OF THE DRYWELL SHALL BE INSTALLED AT LEAST 10 FEET AWAY FROM ANY FOUNDATION WALL. 3. COMPACT BACKFILL TO 95% STANDARD PROCTOR. 4. BACKFILL EXCAVATION STRUCTURE WITH COMPACTED 1-1/2" WASHED ROCK TO THE TOP OF THE DRYWELL AND WITH STRUCTURAL NATIVE MATERIAL TO 12" BELOW FINISH GRADE. COMPACT BACKFILL TO 95% STANDARD PROCTOR.24Ø RECESS MANHOLE LID 1 8" TO 1 4" BELOW FINISH GRADE CAST IRON OR ALUM. MANHOLE STEPS, POSITION OVER SHELF IN VERTICAL LINE AT 15" o.c. MAX. FLEXIBLE PLASTIC SEALING COMPUND (RAM-NEK) AT ALL JOINTS 4" FOUNDATION DRAIN ZOELLER "EXTRA PROTECTION" TWO PUMP SYSTEM 7/19/2018 DATE OF PUBLICATION C500 DETAILSTHUNDERBOWL 395 THUNDERBOWL LN.ASPEN, CO 816111/11/2018 PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 7/20/2018 CHANGE ORDER 1 OUTLET PIPE 9" SQUARE STRUCTURAL FOAM GRATE TRENCH DRAIN GRATE FOUNDATION DRAIN AND DRYWELL DETAILS (ALSO SEE C501) SITE WALL DRAINAGE 4" ROUND STRUCTURAL FOAM GRATE SLOT DRAIN INLET SUMMARY 1/11/20187/20/2018 10/03/2018 7/19/2018 DATE OF PUBLICATION C501 DETAILSTHUNDERBOWL 395 THUNDERBOWL LN.ASPEN, CO 816111/11/2018 PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 7/20/2018 CHANGE ORDER 1 SCOUR STOP PAD FOUNDATION DRAIN AND DRYWELL DETAILS (ALSO SEE C500) 1/11/20187/20/2018 10/03/2018 MATCHDRIVEWAY/45.046.047.048.046.546.547.046.546.548.048.050.052.049.054.052.050.051.056.050.052.051.553.053.054.054.055.0+2'aboveFG/46.5+1.5' aboveFG/46.0+1.5'aboveFG/47.0+1.5'aboveFG/47.0+1'aboveFG/46.546.547.545.510.00'ActivityEnvelope5.0'ActivityEnvelopeN 4 2 ° 9 ' 2 3 " E 1 7 1 . 2 2 'N 18°46'46" W 157.88'Building EnvelopeBuilding Envelope10' Private Ski Easment& 10' Sewer Easement5.0'ActivityEnvelope10.0'Utility Easement-4.0%-0.1% 7/19/2018 DATE OF PUBLICATION C600 EROSION AND SEDIMENT CONTROLTHUNDERBOWL 395 THUNDERBOWL LN.ASPEN, CO 816115/25/2017 CONCEPTUAL G&D WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10'NSED. FENCE 7/20/2017 PROGRESS GRADING PROPERTY LINE 1/11/20187/20/2018 10/03/2018 MATCHDRIVEWAY/45.046.047.048.046.546.547.046.546.548.048.050.052.049.054.052.050.051.056.050.052.051.553.053.054.054.055.0+2'aboveFG/46.5+1.5' aboveFG/46.0+1.5'aboveFG/47.0+1.5'aboveFG/47.0+1'aboveFG/46.546.547.545.5W SS SS E 10.00'ActivityEnvelope5.0'ActivityEnvelopeN 4 2 ° 9 ' 2 3 " E 1 7 1 . 2 2 'N 18°46'46" W 157.88'Building EnvelopeBuilding Envelope10' Private Ski Easment& 10' Sewer Easement5.0'ActivityEnvelope10.0'Utility Easement-4.0%-0.1% 7/19/2018 DATE OF PUBLICATION C700 UTILITIESTHUNDERBOWL 395 THUNDERBOWL LN.ASPEN, CO 816111/11/2018 PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10'NUTILITY SERVICE E=ELECTRIC UG=UNDERGROUND GAS SS=SANITARY SEWER W=WATER Tel=PHONE LINE Cable=CABLE LINE WATER METER ELECTRIC METER W E 7/20/2018 CHANGE ORDER 1 EXISTING CONTOUR PROPOSED CONTOUR7910 SPOT ELEVATION XXXX.XX CONC. = CONCRETE HP = HIGH POINT TD = TRENCH DRAIN PROPERTY LINE 1/11/20187/20/2018 10/03/2018 MATCHDRIVEWAY/45.046.047.048.046.546.547.046.546.548.048.050.052.049.054.052.050.051.056.050.052.051.553.053.054.054.055.0+2'aboveFG/46.5+1.5' aboveFG/46.0+1.5'aboveFG/47.0+1.5'aboveFG/47.0+1'aboveFG/46.546.547.545.510.00'ActivityEnvelope5.0'ActivityEnvelopeN 4 2 ° 9 ' 2 3 " E 1 7 1 . 2 2 'N 18°46'46" W 157.88'Building EnvelopeBuilding Envelope10' Private Ski Easment& 10' Sewer Easement5.0'ActivityEnvelope10.0'Utility Easement-4.0%-0.1% 7/19/2018 DATE OF PUBLICATION C800 FOUNDATION DRAINAGE PLANTHUNDERBOWL395 THUNDERBOWL LN.ASPEN, CO 816111/11/2018 PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10'N7/20/2018 CHANGE ORDER 1 PROPERTY LINE 1/11/20187/20/2018 10/03/2018 4 Appendix D--Hydrologic Calculations 10/03/2018 City of Aspen Urban Runoff Management Plan Chapter 8 – Water Quality 8-30 Rev 11/2014 Figure 8.13 Aspen Water Quality Capture Volume 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100WQCV (watershed-inches) Effective Imperviousness of Tributary Area to BMP (percent) WQCV SF 10/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =EB : 1 Area =0.693 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.15 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1000 312 0.15 N/A 0.37 14.17 1 2 3 4 5 312 Computed Tc =14.17 Regional Tc =11.73 User-Entered Tc =11.73 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =1.99 inch/hr Peak Flowrate, Qp =0.207 cfs Rainfall Intensity at Regional Tc, I =2.23 inch/hr Peak Flowrate, Qp =0.232 cfs Rainfall Intensity at User-Defined Tc, I =2.23 inch/hr Peak Flowrate, Qp =0.232 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl EB : 1 Paved Areas & 5YR-EB1 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 1 Area =0.225 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.15 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1000 312 0.15 N/A 0.37 14.17 1 2 3 4 5 312 Computed Tc =14.17 Regional Tc =11.73 User-Entered Tc =11.73 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =1.99 inch/hr Peak Flowrate, Qp =0.067 cfs Rainfall Intensity at Regional Tc, I =2.23 inch/hr Peak Flowrate, Qp =0.075 cfs Rainfall Intensity at User-Defined Tc, I =2.23 inch/hr Peak Flowrate, Qp =0.075 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 1 Paved Areas & 5YR-PB1 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 2 Area =0.191 Acres Percent Imperviousness =38.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.34 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.34 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.2050 100 0.34 N/A 0.33 5.07 1 2 3 4 5 100 Computed Tc =5.07 Regional Tc =10.56 User-Entered Tc =5.07 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.28 inch/hr Peak Flowrate, Qp =0.212 cfs Rainfall Intensity at Regional Tc, I =2.36 inch/hr Peak Flowrate, Qp =0.153 cfs Rainfall Intensity at User-Defined Tc, I =3.28 inch/hr Peak Flowrate, Qp =0.212 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 2 Paved Areas & 5YR-PB2 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 2.1 Area =0.012 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0800 10 0.90 N/A 0.28 0.59 1 2 3 4 5 10 Computed Tc =0.59 Regional Tc =10.06 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.75 inch/hr Peak Flowrate, Qp =0.051 cfs Rainfall Intensity at Regional Tc, I =2.42 inch/hr Peak Flowrate, Qp =0.026 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.035 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 2.1 Paved Areas & 5YR-PB2.1 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 3.0 Area =0.024 Acres Percent Imperviousness =2.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.16 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.16 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.2031 64 0.16 N/A 0.21 5.01 1 2 3 4 5 64 Computed Tc =5.01 Regional Tc =10.36 User-Entered Tc =5.01 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.013 cfs Rainfall Intensity at Regional Tc, I =2.39 inch/hr Peak Flowrate, Qp =0.009 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.013 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 3.0 Paved Areas & 5YR-PB3.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 4.0 Area =0.023 Acres Percent Imperviousness =34.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.32 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.32 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.2500 45 0.32 N/A 0.23 3.26 1 2 3 4 5 45 Computed Tc =3.26 Regional Tc =10.25 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.75 inch/hr Peak Flowrate, Qp =0.028 cfs Rainfall Intensity at Regional Tc, I =2.40 inch/hr Peak Flowrate, Qp =0.018 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.024 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 4.0 Paved Areas & 5YR-PB4.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 5.0 Area =0.057 Acres Percent Imperviousness =2.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.16 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.16 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1786 28 0.16 N/A 0.13 3.46 1 2 3 4 5 28 Computed Tc =3.46 Regional Tc =10.16 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.69 inch/hr Peak Flowrate, Qp =0.034 cfs Rainfall Intensity at Regional Tc, I =2.41 inch/hr Peak Flowrate, Qp =0.022 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.031 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 5.0 Paved Areas & 5YR-PB5.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 6.0 Area =0.016 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0200 5 0.90 N/A 0.13 0.66 1 2 3 4 5 5 Computed Tc =0.66 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.71 inch/hr Peak Flowrate, Qp =0.068 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.035 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.047 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 6.0 Paved Areas & 5YR-PB6.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 6.1 Area =0.008 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.80 inch/hr Peak Flowrate, Qp =0.034 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.017 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.024 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 6.1 Paved Areas & 5YR-PB6.1 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 6.2 Area =0.003 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.80 inch/hr Peak Flowrate, Qp =0.013 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.007 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.009 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 6.2 Paved Areas & 5YR-PB6.2 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 7.0 Area =0.010 Acres Percent Imperviousness =60.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.46 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.46 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.46 N/A 0.05 1.53 1 2 3 4 5 5 Computed Tc =1.53 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.34 inch/hr Peak Flowrate, Qp =0.020 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.011 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.015 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 7.0 Paved Areas & 5YR-PB7.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 8.0 Area =0.031 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.80 inch/hr Peak Flowrate, Qp =0.133 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.067 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.091 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 8.0 Paved Areas & 5YR-PB8.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 9.0 Area =0.011 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.80 inch/hr Peak Flowrate, Qp =0.047 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.024 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.032 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 9.0 Paved Areas & 5YR-PB9.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 9.0 Area =0.003 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.80 inch/hr Peak Flowrate, Qp =0.013 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.007 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.009 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 10.0 Paved Areas & 5YR-PB10.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 11.0 Area =0.015 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.80 inch/hr Peak Flowrate, Qp =0.065 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.033 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.044 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 11.0 Paved Areas & 5YR-PB11.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 12.0 Area =0.004 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.80 inch/hr Peak Flowrate, Qp =0.017 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.009 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.012 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 12.0 Paved Areas & 5YR-PB12.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 13.0 Area =0.028 Acres Percent Imperviousness =38.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.34 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.34 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.34 N/A 0.05 1.80 1 2 3 4 5 5 Computed Tc =1.80 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.24 inch/hr Peak Flowrate, Qp =0.040 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.023 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.031 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 13.0 Paved Areas & 5YR-PB13.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 14.0 Area =0.015 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.80 inch/hr Peak Flowrate, Qp =0.065 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.033 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.044 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 14.0 Paved Areas & 5YR-PB14.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 15.0 Area =0.010 Acres Percent Imperviousness =26.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.29 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.29 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.29 N/A 0.04 1.93 1 2 3 4 5 5 Computed Tc =1.93 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.19 inch/hr Peak Flowrate, Qp =0.012 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.007 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.009 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 15.0 Paved Areas & 5YR-PB15.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 16.0 Area =0.007 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =5 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=0.64 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.90 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =4.80 inch/hr Peak Flowrate, Qp =0.030 cfs Rainfall Intensity at Regional Tc, I =2.43 inch/hr Peak Flowrate, Qp =0.015 cfs Rainfall Intensity at User-Defined Tc, I =3.29 inch/hr Peak Flowrate, Qp =0.021 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 16.0 Paved Areas & 5YR-PB16.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =EB : 1 Area =0.693 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.50 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1000 312 0.15 N/A 0.37 14.17 1 2 3 4 5 312 Computed Tc =14.17 Regional Tc =11.73 User-Entered Tc =11.73 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.83 inch/hr Peak Flowrate, Qp =1.327 cfs Rainfall Intensity at Regional Tc, I =4.28 inch/hr Peak Flowrate, Qp =1.485 cfs Rainfall Intensity at User-Defined Tc, I =4.28 inch/hr Peak Flowrate, Qp =1.4845 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl EB : 1 Paved Areas & 100YR-EB1 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 1 Area =0.225 Acres Percent Imperviousness =0.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.50 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.15 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1000 312 0.15 N/A 0.37 14.17 1 2 3 4 5 312 Computed Tc =14.17 Regional Tc =11.73 User-Entered Tc =11.73 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =3.83 inch/hr Peak Flowrate, Qp =0.431 cfs Rainfall Intensity at Regional Tc, I =4.28 inch/hr Peak Flowrate, Qp =0.482 cfs Rainfall Intensity at User-Defined Tc, I =4.28 inch/hr Peak Flowrate, Qp =0.482 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 1 Paved Areas & 100YR-PB1 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 2 Area =0.191 Acres Percent Imperviousness =38.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.58 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.34 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.2050 100 0.34 N/A 0.33 5.07 1 2 3 4 5 100 Computed Tc =5.07 Regional Tc =10.56 User-Entered Tc =5.07 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =6.29 inch/hr Peak Flowrate, Qp =0.697 cfs Rainfall Intensity at Regional Tc, I =4.54 inch/hr Peak Flowrate, Qp =0.502 cfs Rainfall Intensity at User-Defined Tc, I =6.29 inch/hr Peak Flowrate, Qp =0.697 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 2 Paved Areas & 100YR-PB2 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 2.1 Area =0.012 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0800 10 0.90 N/A 0.28 0.59 1 2 3 4 5 10 Computed Tc =0.59 Regional Tc =10.06 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.12 inch/hr Peak Flowrate, Qp =0.105 cfs Rainfall Intensity at Regional Tc, I =4.66 inch/hr Peak Flowrate, Qp =0.053 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.073 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 2.1 Paved Areas & 100YR-PB2.1 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 3.0 Area =0.024 Acres Percent Imperviousness =2.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.51 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.16 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.2031 64 0.16 N/A 0.21 5.01 1 2 3 4 5 64 Computed Tc =5.01 Regional Tc =10.36 User-Entered Tc =5.01 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =6.32 inch/hr Peak Flowrate, Qp =0.077 cfs Rainfall Intensity at Regional Tc, I =4.59 inch/hr Peak Flowrate, Qp =0.056 cfs Rainfall Intensity at User-Defined Tc, I =6.32 inch/hr Peak Flowrate, Qp =0.077 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 3.0 Paved Areas & 100YR-PB3.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 4.0 Area =0.023 Acres Percent Imperviousness =34.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.57 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.32 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.2500 45 0.32 N/A 0.23 3.26 1 2 3 4 5 45 Computed Tc =3.26 Regional Tc =10.25 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =7.20 inch/hr Peak Flowrate, Qp =0.095 cfs Rainfall Intensity at Regional Tc, I =4.61 inch/hr Peak Flowrate, Qp =0.061 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.083 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 4.0 Paved Areas & 100YR-PB4.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 5.0 Area =0.057 Acres Percent Imperviousness =2.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.51 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.16 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.1786 28 0.16 N/A 0.13 3.46 1 2 3 4 5 28 Computed Tc =3.46 Regional Tc =10.16 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =7.09 inch/hr Peak Flowrate, Qp =0.205 cfs Rainfall Intensity at Regional Tc, I =4.63 inch/hr Peak Flowrate, Qp =0.134 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.183 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 5.0 Paved Areas & 100YR-PB5.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 6.0 Area =0.016 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0200 5 0.90 N/A 0.13 0.66 1 2 3 4 5 5 Computed Tc =0.66 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.06 inch/hr Peak Flowrate, Qp =0.139 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.071 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.097 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 6.0 Paved Areas & 100YR-PB6.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 6.1 Area =0.008 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.22 inch/hr Peak Flowrate, Qp =0.071 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.036 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.048 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 6.1 Paved Areas & 100YR-PB6.1 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 6.2 Area =0.003 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.22 inch/hr Peak Flowrate, Qp =0.026 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.013 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.018 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 6.2 Paved Areas & 100YR-PB6.2 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 7.0 Area =0.010 Acres Percent Imperviousness =60.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.63 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.46 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.46 N/A 0.05 1.53 1 2 3 4 5 5 Computed Tc =1.53 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =8.34 inch/hr Peak Flowrate, Qp =0.053 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.030 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.040 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 7.0 Paved Areas & 100YR-PB7.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 8.0 Area =0.031 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.22 inch/hr Peak Flowrate, Qp =0.273 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.138 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.187 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 8.0 Paved Areas & 100YR-PB8.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 9.0 Area =0.011 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.22 inch/hr Peak Flowrate, Qp =0.097 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.049 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.067 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 9.0 Paved Areas & 100YR-PB9.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 9.0 Area =0.003 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.22 inch/hr Peak Flowrate, Qp =0.026 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.013 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.018 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB :10.0 Paved Areas & 100YR-PB10.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 11.0 Area =0.015 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.22 inch/hr Peak Flowrate, Qp =0.132 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.067 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.091 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 11.0 Paved Areas & 100YR-PB11.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 12.0 Area =0.004 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.22 inch/hr Peak Flowrate, Qp =0.035 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.018 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.024 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 12.0 Paved Areas & 100YR-PB12.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 13.0 Area =0.028 Acres Percent Imperviousness =38.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.58 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.34 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.34 N/A 0.05 1.80 1 2 3 4 5 5 Computed Tc =1.80 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =8.14 inch/hr Peak Flowrate, Qp =0.132 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.076 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.103 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 13.0 Paved Areas & 100YR-PB13.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 14.0 Area =0.015 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.22 inch/hr Peak Flowrate, Qp =0.132 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.067 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.091 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 14.0 Paved Areas & 100YR-PB14.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 15.0 Area =0.010 Acres Percent Imperviousness =26.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.56 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.29 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.29 N/A 0.04 1.93 1 2 3 4 5 5 Computed Tc =1.93 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =8.05 inch/hr Peak Flowrate, Qp =0.045 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.026 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.036 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 15.0 Paved Areas & 100YR-PB15.0 Page 110/03/2018 Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =PB : 16.0 Area =0.007 Acres Percent Imperviousness =100.00 % NRCS Soil Type =C A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =100 years (input return period for design storm) C1 =88.80 (input the value of C1) C2=10.00 (input the value of C2) C3=1.052 (input the value of C3) P1=1.23 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.96 Overide Runoff Coefficient, C =(enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0500 5 0.90 N/A 0.17 0.48 1 2 3 4 5 5 Computed Tc =0.48 Regional Tc =10.03 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =9.22 inch/hr Peak Flowrate, Qp =0.062 cfs Rainfall Intensity at Regional Tc, I =4.67 inch/hr Peak Flowrate, Qp =0.031 cfs Rainfall Intensity at User-Defined Tc, I =6.33 inch/hr Peak Flowrate, Qp =0.042 cfs (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Thunderbowl PB : 16.0 Paved Areas & 100YR-PB16.0 Page 110/03/2018 5 Appendix E--Hydraulic Calculations 10/03/2018 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Saturday, Jun 23 2018 4-in at 80 percent full at 9.15 percent slope Circular Diameter (ft) = 0.33 Invert Elev (ft) = 100.00 Slope (%) = 9.15 N-Value = 0.009 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.26 Q (cfs) = 0.791 Area (sqft) = 0.07 Velocity (ft/s) = 10.78 Wetted Perim (ft) = 0.73 Crit Depth, Yc (ft) = 0.33 Top Width (ft) = 0.26 EGL (ft) = 2.07 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 10/03/2018 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Saturday, Jun 23 2018 4-in at 80 percent full at 15.90 percent slope Circular Diameter (ft) = 0.33 Invert Elev (ft) = 100.00 Slope (%) = 15.90 N-Value = 0.009 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.26 Q (cfs) = 1.043 Area (sqft) = 0.07 Velocity (ft/s) = 14.21 Wetted Perim (ft) = 0.73 Crit Depth, Yc (ft) = 0.33 Top Width (ft) = 0.26 EGL (ft) = 3.40 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 10/03/2018 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Saturday, Jun 23 2018 4-in at 80 percent full at 5.00 percent slope Circular Diameter (ft) = 0.33 Invert Elev (ft) = 100.00 Slope (%) = 5.00 N-Value = 0.009 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.26 Q (cfs) = 0.585 Area (sqft) = 0.07 Velocity (ft/s) = 7.97 Wetted Perim (ft) = 0.73 Crit Depth, Yc (ft) = 0.33 Top Width (ft) = 0.26 EGL (ft) = 1.25 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 10/03/2018 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Saturday, Jun 23 2018 4-in at 80 percent full at 20 percent slope Circular Diameter (ft) = 0.33 Invert Elev (ft) = 100.00 Slope (%) = 20.00 N-Value = 0.009 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.26 Q (cfs) = 1.169 Area (sqft) = 0.07 Velocity (ft/s) = 15.94 Wetted Perim (ft) = 0.73 Crit Depth, Yc (ft) = 0.33 Top Width (ft) = 0.26 EGL (ft) = 4.21 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 10/03/2018 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Saturday, Jun 23 2018 4-in at 80 percent full at 2.00 percent slope Circular Diameter (ft) = 0.33 Invert Elev (ft) = 100.00 Slope (%) = 2.00 N-Value = 0.009 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.26 Q (cfs) = 0.370 Area (sqft) = 0.07 Velocity (ft/s) = 5.04 Wetted Perim (ft) = 0.73 Crit Depth, Yc (ft) = 0.32 Top Width (ft) = 0.26 EGL (ft) = 0.66 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 10/03/2018 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Saturday, Jun 23 2018 OUTLET -- 6-IN PVC PIVE @ SLOPE=1.33 Circular Diameter (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 1.33 N-Value = 0.009 Calculations Compute by: Known Q Known Q (cfs) = 1.00 Highlighted Depth (ft) = 0.47 Q (cfs) = 1.003 Area (sqft) = 0.19 Velocity (ft/s) = 5.23 Wetted Perim (ft) = 1.33 Crit Depth, Yc (ft) = 0.48 Top Width (ft) = 0.24 EGL (ft) = 0.90 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 10/03/2018 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Saturday, Jun 23 2018 6-in at 80 percent full at 2 percent slope Circular Diameter (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 2.00 N-Value = 0.009 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.40 Q (cfs) = 1.120 Area (sqft) = 0.17 Velocity (ft/s) = 6.65 Wetted Perim (ft) = 1.11 Crit Depth, Yc (ft) = 0.49 Top Width (ft) = 0.40 EGL (ft) = 1.09 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 10/03/2018 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Saturday, Jun 23 2018 6-in at 80 percent full at 1.56 percent slope Circular Diameter (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 1.56 N-Value = 0.009 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.40 Q (cfs) = 0.989 Area (sqft) = 0.17 Velocity (ft/s) = 5.87 Wetted Perim (ft) = 1.11 Crit Depth, Yc (ft) = 0.48 Top Width (ft) = 0.40 EGL (ft) = 0.94 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) 10/03/2018 6 Appendix F—Detention Calculations 10/03/2018 Project: Basin ID: Design Information (Input):Design Information (Input): Catchment Drainage Imperviousness Ia =47.89 percent Catchment Drainage Imperviousness Ia =47.89 percent Catchment Drainage Area A =0.464 acres Catchment Drainage Area A =0.464 acres Predevelopment NRCS Soil Group Type =C A, B, C, or D Predevelopment NRCS Soil Group Type =C A, B, C, or D Return Period for Detention Control T =5 years (2, 5, 10, 25, 50, or 100)Return Period for Detention Control T =100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc =5.03 minutes Time of Concentration of Watershed Tc =5.03 minutes Allowable Unit Release Rate q =cfs/acre Allowable Unit Release Rate q =2.140 cfs/acre One-hour Precipitation P1 =0.64 inches One-hour Precipitation P1 =1.23 inches Design Rainfall IDF Formula i = C1* P1/(C2+Tc)^C3 Design Rainfall IDF Formula i = C1* P1/(C2+Tc)^C3 Coefficient One C1 =88.80 Coefficient One C1 =88.80 Coefficient Two C2 =10 Coefficient Two C2 =10 Coefficient Three C3 =1.052 Coefficient Three C3 =1.052 Determination of Average Outflow from the Basin (Calculated):Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C =Runoff Coefficient C =0.60 Inflow Peak Runoff Qp-in =cfs Inflow Peak Runoff Qp-in =1.76 cfs Allowable Peak Outflow Rate Qp-out =cfs Allowable Peak Outflow Rate Qp-out =0.993 cfs Mod. FAA Minor Storage Volume = 0 cubic feet Mod. FAA Major Storage Volume = 340 cubic feet Mod. FAA Minor Storage Volume = 0.000 acre-ft Mod. FAA Major Storage Volume = 0.008 acre-ft 1 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume minutes inches / hr acre-feet "m"cfs acre-feet acre-feet minutes inches / hr acre-feet "m"cfs acre-feet acre-feet (input)(output)(output)(output)(output)(output)(output)(input)(output)(output)(output)(output)(output)(output) 0 0.00 0.000 0.00 0 0.00 0.000 0.00 0.00 0.000 0.000 1 4.56 0.000 0.00 1 8.77 0.003 1.00 0.99 0.001 0.002 2 4.16 0.000 0.00 2 8.00 0.006 1.00 0.99 0.003 0.003 3 3.83 0.000 0.00 3 7.35 0.008 1.00 0.99 0.004 0.004 4 3.54 0.000 0.00 4 6.80 0.010 1.00 0.99 0.005 0.005 5 3.29 0.000 0.00 5 6.33 0.012 1.00 0.99 0.007 0.005 6 3.08 0.000 0.00 6 5.91 0.014 0.92 0.91 0.008 0.006 7 2.89 0.000 0.00 7 5.54 0.015 0.86 0.85 0.008 0.007 8 2.72 0.000 0.00 8 5.22 0.016 0.81 0.81 0.009 0.007 9 2.57 0.000 0.00 9 4.93 0.017 0.78 0.77 0.010 0.007 10 2.43 0.000 0.00 10 4.67 0.018 0.75 0.75 0.010 0.008 11 2.31 0.000 0.00 11 4.44 0.019 0.73 0.72 0.011 0.008 12 2.20 0.000 0.00 12 4.23 0.019 0.71 0.70 0.012 0.008 13 2.10 0.000 0.00 13 4.03 0.020 0.69 0.69 0.012 0.008 14 2.01 0.000 0.00 14 3.86 0.021 0.68 0.67 0.013 0.008 15 1.92 0.000 0.00 15 3.70 0.021 0.67 0.66 0.014 0.008 16 1.85 0.000 0.00 16 3.55 0.022 0.66 0.65 0.014 0.007 17 1.77 0.000 0.00 17 3.41 0.022 0.65 0.64 0.015 0.007 18 1.71 0.000 0.00 18 3.28 0.023 0.64 0.64 0.016 0.007 19 1.64 0.000 0.00 19 3.16 0.023 0.63 0.63 0.016 0.007 20 1.59 0.000 0.00 20 3.05 0.023 0.63 0.62 0.017 0.006 21 1.53 0.000 0.00 21 2.95 0.024 0.62 0.62 0.018 0.006 22 1.48 0.000 0.00 22 2.85 0.024 0.61 0.61 0.018 0.006 23 1.44 0.000 0.00 23 2.76 0.024 0.61 0.60 0.019 0.005 24 1.39 0.000 0.00 24 2.67 0.025 0.60 0.60 0.020 0.005 25 1.35 0.000 0.00 25 2.59 0.025 0.60 0.60 0.021 0.004 26 1.31 0.000 0.00 26 2.52 0.025 0.60 0.59 0.021 0.004 27 1.27 0.000 0.00 27 2.45 0.025 0.59 0.59 0.022 0.003 28 1.24 0.000 0.00 28 2.38 0.026 0.59 0.59 0.023 0.003 29 1.20 0.000 0.00 29 2.31 0.026 0.59 0.58 0.023 0.002 30 1.17 0.000 0.00 30 2.25 0.026 0.58 0.58 0.024 0.002 31 1.14 0.000 0.00 31 2.20 0.026 0.58 0.58 0.025 0.001 32 1.11 0.000 0.00 32 2.14 0.026 0.58 0.57 0.025 0.001 33 1.09 0.000 0.00 33 2.09 0.026 0.58 0.57 0.026 0.000 34 1.06 0.000 0.00 34 2.04 0.027 0.57 0.57 0.027 0.000 35 1.04 0.000 0.00 35 1.99 0.027 0.57 0.57 0.027 -0.001 36 1.01 0.000 0.00 36 1.95 0.027 0.57 0.57 0.028 -0.001 37 0.99 0.000 0.00 37 1.90 0.027 0.57 0.56 0.029 -0.002 38 0.97 0.000 0.00 38 1.86 0.027 0.57 0.56 0.029 -0.002 39 0.95 0.000 0.00 39 1.82 0.027 0.56 0.56 0.030 -0.003 40 0.93 0.000 0.00 40 1.78 0.027 0.56 0.56 0.031 -0.003 41 0.91 0.000 0.00 41 1.75 0.027 0.56 0.56 0.031 -0.004 42 0.89 0.000 0.00 42 1.71 0.028 0.56 0.56 0.032 -0.005 43 0.87 0.000 0.00 43 1.68 0.028 0.56 0.55 0.033 -0.005 44 0.86 0.000 0.00 44 1.64 0.028 0.56 0.55 0.034 -0.006 45 0.84 0.000 0.00 45 1.61 0.028 0.56 0.55 0.034 -0.006 46 0.82 0.000 0.00 46 1.58 0.028 0.55 0.55 0.035 -0.007 47 0.81 0.000 0.00 47 1.55 0.028 0.55 0.55 0.036 -0.008 48 0.79 0.000 0.00 48 1.52 0.028 0.55 0.55 0.036 -0.008 49 0.78 0.000 0.00 49 1.50 0.028 0.55 0.55 0.037 -0.009 50 0.77 0.000 0.00 50 1.47 0.028 0.55 0.55 0.038 -0.009 51 0.75 0.000 0.00 51 1.45 0.028 0.55 0.55 0.038 -0.010 52 0.74 0.000 0.00 52 1.42 0.028 0.55 0.54 0.039 -0.011 53 0.73 0.000 0.00 53 1.40 0.028 0.55 0.54 0.040 -0.011 54 0.72 0.000 0.00 54 1.37 0.028 0.55 0.54 0.040 -0.012 55 0.70 0.000 0.00 55 1.35 0.029 0.55 0.54 0.041 -0.013 56 0.69 0.000 0.00 56 1.33 0.029 0.54 0.54 0.042 -0.013 57 0.68 0.000 0.00 57 1.31 0.029 0.54 0.54 0.042 -0.014 58 0.67 0.000 0.00 58 1.29 0.029 0.54 0.54 0.043 -0.014 59 0.66 0.000 0.00 59 1.27 0.029 0.54 0.54 0.044 -0.015 60 0.65 0.000 0.00 60 1.25 0.029 0.54 0.54 0.044 -0.016 Mod. FAA Minor Storage Volume (cubic ft.) =0 Mod. FAA Major Storage Volume (cubic ft.) =340 Mod. FAA Minor Storage Volume (acre-ft.) =0.0000 Mod. FAA Major Storage Volume (acre-ft.) =0.0078 Determination of MAJOR Detention Volume Using Modified FAA Method (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.34, Released November 2013 Determination of MINOR Detention Volume Using Modified FAA Method DETENTION VOLUME BY THE MODIFIED FAA METHOD Thunderbowl Site FAA - Change Order, Modified FAA 6/23/2018, 7:28 PM10/03/2018 Project: Basin ID: STAGE-STORAGE SIZING FOR DETENTION BASINS 0.60 0.80 1.00 1.20 Stage (ft. elev.)STAGE FAA - Change Order, Basin 6/23/2018, 7:28 PM10/03/2018