GENERAL NOTES:
1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND
STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE
STRUCTURAL ENGINEER.
2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE
A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.
3.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACT
ENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONS
SHOWN ON PLANS.
4.ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY
CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES.
5.INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES.
SHEET DETAIL NOTES:
LOCATE SNOW/ICE SENSOR BETWEEN TUBING. LOCATE EXACT
LOCATION WITH G.C. PRIOR TO INSTALLATION. DO NOT INSTALL IN
DIRECT SUNLIGHT OR UNDER OVER HANGS.
REFER TO M-120 - M-123 FOR ASSOCIATED MANIFOLD LOCATION AND
PIPING.
1
1S
SZ
2
9 SF
SZ
1
9 SF
SZ
6
368 SF
SM
6
SZ
7
355.19 SF
SZ
8
75.49 SF
2
2
2
2
2
2
2 2
2
of www.aec-vail.comaPO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620Mechanical, Electrical & Lighting Design ServicesArchitectural Engineering ConsultantsTelephone: 970-748-8520ceDrawn By:Checked By:
DATE:ISSUE:
AEC PROJECT #:LOT 7THUNDERBOWLASPEN, CO17032.00An Office with LEEDâ„¢ Accredited Professionals11-16-18 DUCT UPDATES 3
01-04-19 GENERATOR UPDATE 4
02-07-19 GRILLE UPDATES 5
02-12-19 RADIANT UPDATE 6
02-26-19 PERMIT COMMENTS 7
05-10-19 C.O. RESPONSES
DGD TOC
SITE
MECHANICAL
PIPING
PLAN
SCALE 1/8" = 1'-0"
M-124
10 15
NORTH
SITE MECHANICAL PIPING PLAN
SCALE: 1/4" = 1'0"
06/18/2019