Loading...
HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0255.2018 (11).ARBKBUIL D I N G E N V E L O P E 5' ACTIVITY ENVELOPE5' ACTIVITY E N VEL OPE 10' UTILITY EASE ME NTBUILDING ENVELOPE10' PRIVATE SKI & SEWER EASEMENTSZ 5 2681.6 SF SZ 4 146 SF SZ 3 452 SF GENERAL NOTES: 1.OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. 3.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACT ENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONS SHOWN ON PLANS. 4.ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES. 5.INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES. SHEET DETAIL NOTES: LOCATE SNOW/ICE SENSOR BETWEEN TUBING. LOCATE EXACT LOCATION WITH G.C. PRIOR TO INSTALLATION. DO NOT INSTALL IN DIRECT SUNLIGHT OR UNDER OVER HANGS. REFER TO M-120 - M-123 FOR ASSOCIATED MANIFOLD LOCATION AND PIPING. 1 1S SZ 2 9 SF SZ 1 9 SF SZ 6 368 SF SM 6 SZ 7 355.19 SF SZ 8 75.49 SF 2 2 2 2 2 2 2 2 2 of www.aec-vail.comaPO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620Mechanical, Electrical & Lighting Design ServicesArchitectural Engineering ConsultantsTelephone: 970-748-8520ceDrawn By:Checked By: DATE:ISSUE: AEC PROJECT #:LOT 7THUNDERBOWLASPEN, CO17032.00An Office with LEEDâ„¢ Accredited Professionals11-16-18 DUCT UPDATES 3 01-04-19 GENERATOR UPDATE 4 02-07-19 GRILLE UPDATES 5 02-12-19 RADIANT UPDATE 6 02-26-19 PERMIT COMMENTS 7 05-10-19 C.O. RESPONSES DGD TOC SITE MECHANICAL PIPING PLAN SCALE 1/8" = 1'-0" M-124 10 15 NORTH SITE MECHANICAL PIPING PLAN SCALE: 1/4" = 1'0" 06/18/2019