Page: C700 UTILITIES
Author: haileyg Water service to this property was
pre-tapped. Contractor to verify size and
condition of existing tap. If the existing tap
is 2” and in good condition then it is to be
utilized. A new tap will only be installed if
the existing pretap is inadequate per COA
Water Dept personnel.
As of 11/2/18 Water Department
personnel had not been onsite to verify
the condition of the existing tap.
haileyg (9)
Page: C700 UTILITIES
Author: haileyg Show utility pedestals and tie in points.
Page: C301 G&D NORTH
Author: haileyg Verify flow path from the sand filter
discharge will not be directed at the
existing utility pedestals.
Page: C301 G&D NORTH
Author: haileyg The landscape plans show three rain
barrels in this vicinity. Include this
information on the civil sheets and show
how downspouts are routed to the rain
barrels.
Page: C700 UTILITIES
Author: haileyg Show gas main and tie in point.
Page: C700 UTILITIES
Author: haileyg Water main location needs to be verified
and surveyed.
Water service to this property
was pre-tapped. Contractor to
verify size and condition of
existing tap. If the existing tap is
2” and in good condition then it
is to be utilized. A new tap will
only be installed if the existing
pretap is inadequate per COA
Water Dept personnel.
As of 11/2/18 Water
Department personnel had not
been onsite to verify the
condition of the existing tap. 0'ctivityShow utility pedestals and tie in
points.
8238.00
10.00'
Activity
Envelope
33%
%
Verify flow path from the sand
filter discharge will not be
directed at the existing utilitypedestals.
8240.00
8243.51
8244
8242.0
0
8244.00
The landscape plans show
three rain barrels in this vicinity.
Include this information on the
civil sheets and show how
downspouts are routed to the
rain barrels.
Show gas main and tie in point.
Water main location needs to
be verified and surveyed.
Understood. We have added a note to the plans
stating: "Contractor to verify size and condition
of existing tap. If the existing tap is a 2"
service and in good condition, then it shall be
utilized. Otherwise, abandon existing tap and
install a new tap per COA Water Dept
standards.
We have added utility pedestals to the plans.
We have rerouted the outlet to discharge to the
roadside ditch.
A rain chain will discharge to the 1st of three
rain barrels. All three rain barrels are set on
free draining gravel. Within the gravel we have
added a perforated pipe to capture and direct
overflows to the sand filter. See C501.
The gas main connection is made at the
northern extent of the property. A note was
added to the plan to show connection point.
The water main was located at surveyed. The
water service will be connect at the existing
curb stop.
06/18/2019
Page: C301 G&D NORTH
Author: haileyg Call out invert out elevations of pipe A
and Pipe B into the basin
Page: C301 G&D NORTH
Author: haileyg Show culvert has capacity for offsite flow.
Page: C301 G&D NORTH
Author: haileyg The landscape plans call out boulders
sized to retain grade RE civil. There is not
information on the civil sheets in regards
to the boulder retaining wall. What is the
height and slope of the retaining wall?
8240.0
8243.00-8.0%9%
5.6%
8238.00
Envelope
Building Envel
o
p
e
0'tivityvelope
10.0'Utility Easement
8244.94
8240.00
8241.00
8242.
0
0
8239.008238.
0
0
82
4
10.67' of 4" PVC @ 1.33%
13.32' of 4" PVC @ 1.33%
Call out invert out elevations ofpipe A and Pipe B into the basin
8246.69
8246.02
INLET-7
RIM:8245.97
INV IN:8240.15 6" PVC
INV OUT:8240.15 6" PVC
INV IN:8239.80 4" PVC
INV OUT:8239.80 6" PVC
Show culvert has capacity for
offsite flow.
8255.00
5.0'
Activity
Envelope
10' Private Ski Easment
& 10' Sewer Easement
82
INLET-3
RIM:8245.07
42.84 4" PVC
INLET-2
RIM:8250.18
45.42 6" PVC
42.39 6" PVC
82
5
2
.
0
0
TEE 6
RIM:8245.12
42.24 6" PVC
42.24 4" PVC
42.24 6" PVC
PIPE K
VC @ 5.00%
RIM:8245.51
42.01 6" PVC
42.01 4" PVC
42.01 6" PVC
The landscape plans call out
boulders sized to retain grade
RE civil. There is not
information on the civil sheets in
regards to the boulder retaining
wall. What is the height and
slope of the retaining wall?
We have added the inverts to the plans.
We have prepared a memo describing the
capacity of the existing roadside ditch and
capacity of the proposed 15" RCP pipe.
We have added top and bottom of wall
information.
06/18/2019