HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0255.2018 (18).ARBK395 Thunderbowl Change Order.pdf Markup Summary Page: C700 UTILITIES Author: haileyg Water service to this property was pre-tapped. Contractor to verify size and condition of existing tap. If the existing tap is 2” and in good condition then it is to be utilized. A new tap will only be installed if the existing pretap is inadequate per COA Water Dept personnel. As of 11/2/18 Water Department personnel had not been onsite to verify the condition of the existing tap. haileyg (9) Page: C700 UTILITIES Author: haileyg Show utility pedestals and tie in points. Page: C301 G&D NORTH Author: haileyg Verify flow path from the sand filter discharge will not be directed at the existing utility pedestals. Page: C301 G&D NORTH Author: haileyg The landscape plans show three rain barrels in this vicinity. Include this information on the civil sheets and show how downspouts are routed to the rain barrels. Page: C700 UTILITIES Author: haileyg Show gas main and tie in point. Page: C700 UTILITIES Author: haileyg Water main location needs to be verified and surveyed. Water service to this property was pre-tapped. Contractor to verify size and condition of existing tap. If the existing tap is 2” and in good condition then it is to be utilized. A new tap will only be installed if the existing pretap is inadequate per COA Water Dept personnel. As of 11/2/18 Water Department personnel had not been onsite to verify the condition of the existing tap. 0'ctivityShow utility pedestals and tie in points. 8238.00 10.00' Activity Envelope 33% % Verify flow path from the sand filter discharge will not be directed at the existing utilitypedestals. 8240.00 8243.51 8244 8242.0 0 8244.00 The landscape plans show three rain barrels in this vicinity. Include this information on the civil sheets and show how downspouts are routed to the rain barrels. Show gas main and tie in point. Water main location needs to be verified and surveyed. Understood. We have added a note to the plans stating: "Contractor to verify size and condition of existing tap. If the existing tap is a 2" service and in good condition, then it shall be utilized. Otherwise, abandon existing tap and install a new tap per COA Water Dept standards. We have added utility pedestals to the plans. We have rerouted the outlet to discharge to the roadside ditch. A rain chain will discharge to the 1st of three rain barrels. All three rain barrels are set on free draining gravel. Within the gravel we have added a perforated pipe to capture and direct overflows to the sand filter. See C501. The gas main connection is made at the northern extent of the property. A note was added to the plan to show connection point. The water main was located at surveyed. The water service will be connect at the existing curb stop. 06/18/2019 Page: C301 G&D NORTH Author: haileyg Call out invert out elevations of pipe A and Pipe B into the basin Page: C301 G&D NORTH Author: haileyg Show culvert has capacity for offsite flow. Page: C301 G&D NORTH Author: haileyg The landscape plans call out boulders sized to retain grade RE civil. There is not information on the civil sheets in regards to the boulder retaining wall. What is the height and slope of the retaining wall? 8240.0 8243.00-8.0%9% 5.6% 8238.00 Envelope Building Envel o p e 0'tivityvelope 10.0'Utility Easement 8244.94 8240.00 8241.00 8242. 0 0 8239.008238. 0 0 82 4 10.67' of 4" PVC @ 1.33% 13.32' of 4" PVC @ 1.33% Call out invert out elevations ofpipe A and Pipe B into the basin 8246.69 8246.02 INLET-7 RIM:8245.97 INV IN:8240.15 6" PVC INV OUT:8240.15 6" PVC INV IN:8239.80 4" PVC INV OUT:8239.80 6" PVC Show culvert has capacity for offsite flow. 8255.00 5.0' Activity Envelope 10' Private Ski Easment & 10' Sewer Easement 82 INLET-3 RIM:8245.07 42.84 4" PVC INLET-2 RIM:8250.18 45.42 6" PVC 42.39 6" PVC 82 5 2 . 0 0 TEE 6 RIM:8245.12 42.24 6" PVC 42.24 4" PVC 42.24 6" PVC PIPE K VC @ 5.00% RIM:8245.51 42.01 6" PVC 42.01 4" PVC 42.01 6" PVC The landscape plans call out boulders sized to retain grade RE civil. There is not information on the civil sheets in regards to the boulder retaining wall. What is the height and slope of the retaining wall? We have added the inverts to the plans. We have prepared a memo describing the capacity of the existing roadside ditch and capacity of the proposed 15" RCP pipe. We have added top and bottom of wall information. 06/18/2019