Loading...
HomeMy WebLinkAboutMaster Permit.401 Castle Creek Rd.0070.2018.ACBKMS0070.2018.ACBKPC SVXXX45162.50333.1362.50162.50512.50BB6/12/18xDr6/12/18BN8/15/1800000PUB / PDJH 8/21/18JH 8/21/18Jenny Hamblin 303-957-7200 jenny.hamblin@pinnacleco.net PERMIT NUMBER- ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET T[CmarAaoa FOR PI.AN REVIEW UESTIONS Name Cnc hurley• _pM1nnee601668-1393 E<tuN tael"rleyliprmaderea no •' • N, NIA P1pllO WA E -mall WA Name Acton VMy Hpapily gpty CeII Phil 401 Castle Creek Rd Gw Aspen 61aseC0 31P81611 E mall AaI OWNER S AUTHORIZED AGENT Name Efk Hurl¢y ppMIa80169e"t 39J Cellimmue Aeeree 1426 N Marvin Sl #101 Gn Gilbert Rate AZ BP85233 nan::laa eric.hurley@pinnacleco.net Name Se"Am"a lune Cell Phone =Irez Gly state ZIP Addneiss ARCHITECT OR DESIGNER• •• Name Phone Cell Phone =et cnr sure vv Urr Atlanta, CIVIL ENGINEER OF ••• Name Phone Cell Phone AJJres tiny stare nv E -mall Address STRUCTUAL ENGINEER OF ••a Name Glen Hunt #3]860 Phone l4e016tw-9566 Cell Phone gdafes 1426 N Marvin St #101 myGilben Stal BP85233 Addrss GENERAL CONTRACTOR Name TBB Ph•Pe cell Phone M tier some av E-mail Mires INSPECTIONS: The General Contractor must sthedule inspections online. Please visit spenpitkin.mm/Departmems/Community-DevelopmentForms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or Cancel the provisicighlilaililif other state or local law regulating construction ort eperformance of construction. It is my responsibility to review th vd pl an ed any comments that are containedlemon an esthat the structure and/or p s built in compliance w cwaunor • sielwum Dace E] Check' 6u create ner builder (single it omeso ust take a test and cmnplete eowne wilding affidavit. (CITY U ner builder approved by: Date: Affidavit on file CITY OF ASPEN is tmT 130 S. GALENA ST I ASPEN CO 81611 PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT SCOPE OF WORK CHECKLIST Tw Cmor Aver LAND USE QUESTIONS If you check any of the boxes below, please consult with the Planner of the Day (planneroftheday@gmail.mm) before submitting your permit application. Does your permit involve any of the following> Part of an approved COA Land Use Review Work involves Landmark Parcel or Historic District ❑Work affects net leasable, net livable, or ❑ Located in 100 -year flood plain or within 100' of high non -unit space water mark Work involves lot splitting or combining a lot Work involves changes in occupancy to structure ElWork involves exterior of structure Changes to elevator or stair configuration ❑ Changing the number of residential units ❑ Changes to the use of existing structure or space IJChanges to number or location of onsite parking ADDITIONAL SCOPE OF WORK QUESTIONS Does your permit involve any of the following? Exterior lighting added or changed Work involves exterior wall penetrations Work involves roof penetrations Work involves digging or excavation Work adds removes, or changes plumbing fixtures Work involves restaurant or food service ❑Disturbs 1,000 sq ft or more of soil within 12 months ❑ Affects parking spaces/meters, loading zones, or alleys IJWork occurs in public right of way Adding structures or systems over utility lines Work affects trees or occurs within the dripline of a tree Work within City Mall boundaries CITY OF ASPEN-�x�-,in, 130 S. GALENA ST I ASPEN CO 81611 XXXX2X2JH 8/21/18X PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM TRcmffaRD All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or Authorized Agent representing the property owner. The following certification shall accompany the application for a permit. E� ADDRESS C UNITN PKCEI IDp 2 V� 1210 I, the property owner, certify as follows: (pick one) This property is not subject to a homeowner's association or other form of private covenant. p This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. 0 This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. - R amup/ate 1 I v Owner SignaturellAom Owner Printed Name OR C I� Authorized Agent Signature Date rV lit ge4VAuthorized Agent Printed Name CITY OF ASPEN..e.,,xDv 130 S. GALENA ST I ASPEN CO 81611 PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFADAVIT AFFIDAVIT POLICY W 1i[ Cm a Aa All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permitvaluation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No.40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R308.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand that this document is a public document. Owner Signature: Owner Printed Name: Date: or, Authorized Agent Signa Date: C �C 18 Authorized Agent Prin ame: PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST Txr Orta Am ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the air for days, weeks, or even months before settling out of the air. The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred. The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989 "ban" on asbestos -containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule" and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos -containing product categories was set aside and DID NOT TAKE EFFECT. Therefore, ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST ❑ Yes ®No Residential: Will you be removing more than 32 sq ft, 501inear feet (e.g-, pipe insulation), or the volume equivalent of a 55 -gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? OYes®No Commercial: Will you be removing more than 160 sq it, 260 linear feet (e -g., pipe insulation), or the volume equivalent of a 55 -gallon dm m of any material besides concrete, wood, bricks, or steel — examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it- After removal, the abatement firm must provide a letter to the Building Division stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued- (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.co.us/ap/ asbestos/index-html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https.//www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. hereby certify that the above information is true and complete. Valley Hospital OwnerAspen Phone# Applicant Eric Huey Phone If (480) 688-1393 (print name) Applicant Signature Date Please call the City of 4p.n Envjrtal He h rt at 920-5039 atamy tim if you have q uesti o ns about asbestos, interp test results, or of ers. CITY OF ASPENAA„.=o.x 130 S. GALENA ST I ASPEN CO 81611 PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection priorto project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single -family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms priorto concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural orfinished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observed measurement. Additional roof plans showing location of measurements may be necessary. if CITY OF ASPENAUZ, 2M7 130 S. GALENA ST I ASPEN CO 81611 PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY Tx G aAmu 4 -Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5 -The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6 -All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7 -The report must include the signature, date, and stamp of Colorado Professional land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zon, Contractor nat e: Date. IV W­ J CITY OF ASPEN-,,.,� air 130 S. GALENA ST I ASPEN CO 81611