HomeMy WebLinkAboutMaster Permit.404 Midland Park Pl.0257.2018 (2).ARBKDATE:MASTER PERMIT:PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION THE On OF ASPEN
PROPERTY INFORMATION
ADDRESS 404 Midland Park Place UNITS PARCEL ID #273707412720
LOT.BLOCK.MBDIVISION Midland park condo
OWNER NAME Peate CELL 970-309-5571 EMAIL dougpeate@alpinebank.com
BEST CONTACT Doug PeateNAME CELL 970-309-5571 EMAIL dougpeate@alpinebank.com
PROJECT DETAILS
WORK'JN 'DETAIL Replacement windows
VALUATION I'1
SCfFTOFW&RKAREA.
UNIT SQ FT1.070
LOT SIZEfsciFrTN/A
DISTURBEDEXTERIORAREA
NEW SQ FT N/A
SQ FT OF ROOMS.WITH UTii.nTYWORK
Use of Building
D Commerical
B Multi-FamilyD Single FamilyD Mixed-Use
Will there beany roof/wall
penetrations?
D Yes§] No
Class of Work Fixture Counts
D NewD Addition
D AlterationB RepairD IFFR
D Tenant FinishD DemolitionD Change OrderD
ZONE DISTRICT Res-APCHA
Jbilets, Bidets
Bathtub
Lavatory (Wash Basin)
Shower
_Kitchen Sink (+Disposal)
Dishwasher
.Laundry Bar, Utility Sink
_Clothes Washer
_FloorSink
_Floor Drain
_Water Heater (Pan Req)
_# Gas Outlets
Water Treatment
Other
Equipment Checklist
.Forced Air/Gravlty Systems
.Wall, Suspended, or Unit Heaters
.Gas Log
.Gas Appliancew
.Appliance Vents
.Heat, Refrlg, Cooling, or
Absorption Unit
.Boilers (includes vent)
_Air Handling Unit
.Cooling Systems
Ventilation Fans
.Range Hood
_ff of Gas System Outlets
.Snowmelt System Sq Ft_
Project Valuation; Cost of project as defined in Valuation Affadavit.
Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.
Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.
Lot Size: Total surveyed square footage of property.
Disturbed Exterior Area: Square footage of lot affected by permit application.
New Sq Ft: Total added square footage for additions to net livable or net leasble space.
Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work. |
NOTICE: This permit becomes null and
void if work or construction authorized
is not commenced within 180 days, or
If construction or work is suspended or
abandoned for a period of 180 days at
any time after work is commenced.
~Re^FOR CITY USE ONLY
5UBMITTAL FEES
Plan Check
Engineering
Zoning (50%)
Energy Code
CM P (50%)
Parks Review
Utility Review
Lot Area
:ensus Code
SSUANCE
Permit Fee
Zoning (50%)
CM P (50%)
REMP
Plan Check
(Hourly)
Zoning
(Hourly)
Engineering
(Hourly)
GIS
:EES ISSUANCE FEES
Parks Impact
SchoolDed.
TDM Impact
Ped. Amenity
Housing Cash in Lieu
Stormwater
City Use Tax
County Use Tax
3eed Restricted
t of Dwellings Plans Locatior
viewer
Reviewing JMeeds Sign- DateOeDartment Review
ning
'c
ilding
e
IP
ate r
)rmwater
nitation,
v. Health
rks
ndscape
iciency
Issue
uance
CITY OF ASPEN December 2017 130 S. GALENA STTASPENTCO 81611}
0257.2018.ARBK
X
X
X
X
X
10/15/2018
30
MS
SV 10/16
SV 10/16
10/16
10/16
16.25
16.50
16.50
3.75
25.00
10/16/2018
Dr 10/16/18
JH
JH
DAM 10/17/18
DAM
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY T,™L
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project,
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-AII drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set,
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
Daron Rienks(D.C. Rienks Custom Construction)I (contractor name) ' _ understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all ai^pticaj^teYp^i^imitations,
Contractor Signature:
Date:/Q-//-/8
CITY OF ASPENAu^2o^ _130 S. GALENA ST^^^ CO 81611110/15/2018
10/16/2018
ADDRESS:PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET THE Cm OF ASFEN
FOR PLAN REVIEW QUESTIONS
Name
FOR INSPECTION QUESTIONS
Name
I OWNER
Phone_E-mail
Phone_E-mail
Name uoug reare Phone y/u-^ua-oo/ i Cell Phone a/u-^uy-oo^ i
»& 404 Midland Park PlaceAddress .City.Aspen State co ZIP 81611
^a" dougpeate@alpinebank.com
I OWNER'S AUTHORIZED AGENT
Name Phone Cell Phone
MfAddress
E-mailAddress.
.City_State.ZIP_
I APPLICATION BEST CONTACT
Name
MajlirAddress
E-mailAddress.
I ARCHITECT OR DESIGNER OF RECORD
Name
MjAddress
E-mailAddress.
Phone
.dty_
Phone
.city_
Cell Phone
State
Cell Phone
State
ZIP
ZIP
CIVIL ENGINEER OF RECORD
Name Phone Cell Phone
MapAddress
E-mailAddress.
.City_State_ZIP_
ISTRUCTUAL ENGINEER OF RECORD
Name Phone Cell Phone
MaAddress .city_State_ZIP_
E-mailAddress.
GENERAL CONTRACTOR
Name Dc Risnks Custom Construction Phone Cell Phone 37U-SR'0-7-':F5T
?gs PO Box 3473 .City.Aspen State co ZIP 81612
E-maii dcrienks(a)Jive.comAddress ""' "" ••—>•=>•• • '-••
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violatepr cancel the provisions of any other state or local law regulating construction or the performance
of construction. ItjsTny re^oi^si^fty to review the approved plans and any comments that are contained thereon and see that the
structure and/or^ojec^s^jXt/Q^omRN'a^ce with all applicable codes.-^^^^__^------- -- _ gate l(^/i-l&
Q Chectdf youare a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(Cm' USE ONLY) Owner builder approved by:_Date:Affidavit on file
CITY OF ASPENAugustzoi7 130S.GALENAST TASPE^^^^^^^^^^^^10/15/2018
10/16/2018
ADDRESS:PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST THE Qn OF ASPEN
LAND USE QUESTIONS
If you check any of the boxes below, please consult with the Planner of the Day (planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following?
Part of an approved COA Land Use Review | | Work involves Landmark Parcel or Historic District
plain or within 100' of highWork affects net leasable, net livable, or
non-unit space
Located in 100-year
water mark
food
Work involves lot splitting or combining a lot | | Work involves ch^figes in occupancy to structure
Work involves exterior of structure | | Changes to el^ator or stair configuration
Changing the number of residential units | | Changes to/fhe use of existing structure or space
Changes to number or location ofonsite parking
ADDITIONAL SCOPE OF WORK QUESTIONS
Does your permit involve any of the following?
Exterior lighting added or changed
Work involves roof penetrations
Work adds, removes, or changes
ixtures
Disturbs 1,000 sq ft or more of sojfwithin12 months
Work occurs in public right of y^ay
Work affects trees or occur/within the
dripline of a tree
Work involves exterior wall penetrations
Work involves digging or excavation
Work involves restaurant or food service
Affects parking spaces/meters, loading zones, or alleys
Adding structures or systems over utility lines
Work within City Mall boundaries
CITY OF ASPEN August 2017 130 S.GALENA STLASPEN, CO 81611110/15/2018
10/16/2018
PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC tm Cm OF ASPEN
BUILDING CODE INFORMATION
Code Editions
D 2015 IRC
(As Adopted and Amended)
D 2015 IBC
(As Adopted and Amended)
D20151EBC
(As Adopted
and Amended)
D Other (Please Explain)
Fire Sprinkler System | Existing? g^s | Required? g^s | Type D NFPA 13 D NFPA 13 R D NFPA 13 D
Type Of Construction D VA D VB D IV D IIIA D IIIB D HAD IIB D IA D IB | Fire Alarms Installed D Yes D No
Required Special Inspections D High-Strength Bolting D Epoxy Anchors
D Permanent Micropiles D Sprayed Fire-Resistants
D Structual Steel Welding
D Other
Energy Code Compliance D Prescriptive Table D OtherD RESCheck UA Alternative D COMCheck UA Alternative
Exterior Energy Use Total Approved On-Site(Existing + New)Snowmelt Spa.Pool
Building Type/Occupancy Group D A_ D B D F_ DE D R_
D B (A <50) D H_ D M D S_
Dl_ DU
D One Family D Two Family
D Townhouse
UNIT DESCRIPTION AS PROPOSED
Gross Area of Building:
Occupant Load: J3_
# Stories Above Grade
Attached Garage
Parking Spaces
# Bedrooms 3
# 3/4 Baths.
# Kitchens 1
# Gas Appliances
J^^^^^^^^^^^^^^^^^^^^^^_ Gross Area of Unit: 1.070
2 # Stories Below Grade 0
Detached Garage Carport
Parking Spaces^_ Parking Spaces J_
# Full Baths 2 Deck Area
# 1/2 Baths.
ft Wood Fireplaces
# Gas Logs_
ADU BUILDING DESCRIPTION
Is there an ADU? D^es[HIM o
# Living Rooms_l_
# Kitchens _L
# Full Baths ^_
# 3/4 Baths
# 1/2 Baths
# Bedrooms 3
# Other Rooms (List)_
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement
Main Level
2nd Floor
3rd Floor
Additional
Reviewed By:Date:
CITY OF ASPEN January 2018 130 S. GALENA ST I ASPEN, CO 81611110/15/2018
10/16/2018
ADDRESS: ___ PERMIT NUMBER;
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM THE Cm-OF ASPEN
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
ADDRESS '404 ^V*V\^ P^ nc<^- UNITff PARCELIDS !>7 ^1 0?^/Z-7 ^0
I, the property owner, certify as follows: (pick one)
D This property is not subject to a homeowners association or other form of private covenant.
This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
D This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature ^/ C7N\^J _ Date JO/H/L^
Owner Printed Name ^~>oo<~. Vee^sC -~7
OR
Owner's Attorney Signature_ Date
Owner's Attorney Printed Name
I CITY OF ASPEN.nuary2018 130 S. GALENA ST I ASPEN, CO 81611110/15/2018
10/16/2018
ADDRESS: __PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST Ins. On OF ASFEN
ASBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the air for days,
weeks, or even months before settling out of the air. The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred. The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989 "ban" on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called "Asbestos Ban and Phaseout Rule" and remanded it to the EPA. Thus, much of the original 1989 EPA ban
on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT. Therefore, ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS CHECKLIST
D Yes B No
Residential: Will you be removing more than 32 sq ft, 50 linear feet (e,g,, pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel - examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
D Yes H No
Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel - examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean, This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdp he. state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www,colorado,gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the.
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
I hereby certify that the above information is true and complete.
Owner W ->5^JT^' Phone # ^0 3^ ^") \
Applicant (print name).b,^, Pe^ phoneft ^70 >^ 5S-?|
Applicant Signature \^/ "^^ _ Date lb/<(/^
Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you have questions
about asbestos, interpreting your test results, or other matters.
CITY W/^PEM^^ 130 S. GALENASH ASPEN, CO 81611110/15/2018
10/16/2018
ADDRESS: _ PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT THE Cm'OF ASPEN
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No, 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official, the valuation is underestimated on the application, the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: W<- ^\ ^^ _Date: (f)Ai/d
Owner Printed Name: <^)o^t^ V^A<L7
or,
Authorized Agent Signature: _ Date:_
Authorized Agent Printed Name:
CITY OF ASPENAu.ust2oi7 130^:GALENAST^^^^^^^^^^ CO 81611110/15/2018
10/16/2018
ADDRESS: _ PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY THE Cm OF ASFEN
Applicability: All development projects must comply with the City's zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question, Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
^TTYOFASPEN Augus^ 130 S. GALENA ST I ASPEN,CO 81611110/15/2018
10/16/2018