Loading...
HomeMy WebLinkAboutFile Documents.407 W Hallam St.0097.2018 (7).ARBK GZO SHEET METAL & ROOFING INC. P.O. Box 1475, Aspen, CO 81612 Cell # 970 379 9977 Office # 970 920 7697 Fax # 970 920 7090 Email:gzo1@comcast.net Project: 407 West Hallum Aspen, CO 81611 Prepared for: Welcome Home Management Plans: Field Measure Proposal Date: 5/16/17 Older section of roof is starting to rust @ valley on front side as well as various locations throughout the roof. 04/11/2018 Repair/replace front entry section with valley and various other panels. • Please note these will not match since they will not have weathered the same as the existing panels. Estimated cost:………………………………………$16,500.00 Roof Replacement (Older section majority of house) Costs: New standing seam…………………………………...$41,600.00 Tear off and removal………..………………………..$ 9,600.00 Permit estimated at………………………………….. $ 3,500.00 Snow and Ice Management System on Metal roof Left side of entry Add new box gutter and down pipe………………..$ 778.00 Snow fence 20 stanchions for fence………………..$1,700.00 Heat tape 68 ft @ $ per……………………. ……....$ 952.00 Connection kit……………………………………....$ 75.00 Right side of house Add snow fence @ Chimney 6 Stanchions @ $85…………………………………$ 510.00 Low section Right side Snow fence with 5 stanchions………………………$ 425.00 Back of house Add 2 sections of snow fence lower section 36 stanchions @ $85………………………………..$3,060.00 High section snow fence 30 stanchions @ $85 per……………………………$2,550.00 Replace gutter……………………………………….$ 828.00 04/11/2018 Rehang existing heat tape with flags on snow fence. Potential 40 flags on the snow fence to hold heat tape…….$200.00 Rehang existing heat tape will need 10-12 hrs. @ $85..$850-1,020 04/11/2018