Loading...
HomeMy WebLinkAboutFile Documents.415 E Hyman Ave.0087.2017 (3).ACBKBuildingComment2 Subject: PlanCheck Page Label: 11 Author: justinh File Name: Complete 415 Plan Set Resubmission.pdf Show the lift on this plan as well as in elevation to demonstrate that it will fit next to the existing adjacent standpipes, which should also be shown on these plans. Provide a cutsheet on the controls for the lift the demonstrate compliance with ICC A117.1-2009 sec 309 (operable parts). Be sure that the controls are not keyed/lockable as this will be an unassisted lift. Provide a new HOA letter stating that the HOA has approved this lift as it was not part of the scope when the original HOA compliance form was submitted. Complete 415 Plan Set Resubmission.pdf (1) Subject: PlanCheck Page Label: 2 Author: justinh File Name: Permit Application Form & Contact Sheet.415 E Hyman(14).2017.09.pdf Your contractor must fill out their information on the contact sheet and sign the permit. Permit Application Form & Contact Sheet.415 E Hyman(14).2017.09.pdf (1) Subject: PlanCheck Page Label: 2 Author: justinh File Name: Zoning Compliance Form.415 E Hyman.2017.09.pdf Have your contractor fill out this portion of the zoning compliance form and sign it. Zoning Compliance Form.415 E Hyman.2017.09.pdf (1)3'-0"NEW ADA LIFTTO BE INSTALLED 5 DN Show the lift on this plan as well as in elevation to demonstrate that it will fit next to the existing adjacent standpipes, which should also be shown on these plans. Provide a cutsheet on the controls for the lift the demonstrate compliance with ICC A117.1-2009 sec 309 (operable parts). Be sure that the controls are not keyed/lockable as this will be an unassisted lift. Provide a new HOA letter stating that the HOA has approved this lift as it was not part of the scope when the original HOA compliance form was submitted. CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ CityMailing Address E-mailAddress State ZIP ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so. ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file August 2017 Your contractor must fill out their information on the contact sheet and sign the permit. CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) ______________________________ understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: ___________________________________________ Date: ________________________________________________________ August 2017 Have your contractor fill out this portion of the zoning compliance form and sign it. FP Response 12/12/17: Accessibility lift is shown on floor plansA-005, A-101, and A-301. Lift specifications have been provided "Xpress-II-DP-Guide.pdf".HOA Approval letter has been provided. FP Response 12/12/17: Contractor has completed contact sheet and signed the permit. FP Response 12/12/17: Contractor has completed zoning compliance form.