Loading...
HomeMy WebLinkAboutFile Documents.415 E Hyman Ave.0087.2017 (4).ACBKMarkup Summary Subject: PlanCheck Page Label: EL1-1 Author: denism File Name: Plan Set.415 E Hyman.2017.09.pdf Daylight controls required per C405.2.3. Show the daylight zones on the plan, all lighting within those zones must be on compliant daylight controls. Plan Set.415 E Hyman.2017.09.pdf (5) Subject: PlanCheck Page Label: A-05 Author: denism File Name: Plan Set.415 E Hyman.2017.09.pdf Provide an accessible route to the front door from the Mall. IEBC section 9006 and 705.2 Subject: PlanCheck Page Label: A-301 Author: justinh File Name: Plan Set.415 E Hyman.2017.09.pdf Provide a ceiling assembly. Subject: PlanCheck Page Label: A-05 Author: justinh File Name: Plan Set.415 E Hyman.2017.09.pdf Provide more information or a cutsheet on this door/hardware to show it complies with ICC A117.1-2009 sec 309. The required 32" clear width must take into account any projection of the door when in the fully opened position, please verify this. Subject: PlanCheck Page Label: EL1-1 Author: denism File Name: Plan Set.415 E Hyman.2017.09.pdf Show compliant light reduction controls per IECC C405.2.2.2 typical throughout. Private offices require occupant sensor controls per C405.2.1. OPEN OFFICE103 PRIVATE OFFICE 107 PRIVATE OFFICE 106 PRIVATE OFFICE 105 PRIVATE OFFICE109 PRIVATE OFFICE 108 CONFERENCE ROOM104 STAFF DESKS102 SHOWROOM101 STORAGE HYMAN MALLUP DN DN PRIVATE OFFICE110RIVATE OFFICE111 TV DISPLAYS Bighorn Consulting Engineers, Inc.Mechanical & Electrical Engineers569 S. Westgate Dr., Suite 1Grand Junction, CO 81505phone: 970-241-8709, fax: 970-241-9514SOTHEBY'S ASPEN415 E. HYMANASPEN COLORADO 81611Daylight controlsrequired per C405.2.3. Show the daylightzones on the plan, alllighting within thosezones must be oncompliant daylightcontrols. DRAWING ISSU ID BUILD COPYRIGHT PROJECT NO: DRAWN BY: DATE OF PUBL PARCEL ID# ZONE DISTRICT C B DN DN Provide an accessible route to the front door from the Mall. IEBC section 9006 and 705.2 F-1 PEN OFFICE 113 Provide a ceiling assembly. 1'-10"2'-8" 2'-8"2'-0" Provide more information or a cutsheet on this door/hardware to show it complies with ICC A117.1-2009 sec 309. The required 32" clear width must take into account any projection of the door when in the fully opened position, please verify this. OPEN OFFICE PRIVATE OFFICE 107 PRIVATE OFFICE 106 PRIVATE OFFICE 105 PRIVATE OFFICE 108 MECH Show compliant light reduction controls per IECC C405.2.2.2 typical throughout. Private offices require occupant sensor controls per C405.2.1. FP Response: An accessible lift will be installed from the Hyman Mall to the building common space. Contractor to confirm specifications. BCE Response: A note has been added to EL1-1 indicating daylight controls to be required. FP Response: A-301 has been updated to reference C-1 ceiling assembly on A-501. FP Response: Cutsheets have been provided showing door hardware. BCE Response: A note has been added to EL1-1 indicating occupancy sensor controls to be required. 12/05/2017