Loading...
HomeMy WebLinkAboutFile Documents.415 E Hyman Ave.0033.2018.ACBK0033-2018-ACBK_BuildingComment1 Subject: PlanCheck Page Label: A-05 Author: justinh File Name: Change Order Plan Set.415 E Hyman.2018.02.pdf Provide a structural detail for these new window headers. Change Order Plan Set.415 E Hyman.2018.02.pdf (5) Subject: PlanCheck Page Label: A-401 Author: justinh File Name: Change Order Plan Set.415 E Hyman.2018.02.pdf Your knee and toe clearance is drawn backwards with the knee clearance at the lip of the sink rather than the back, it is also missing dimensions showing compliance with ANSI 306.2 and 306.3. Please revise. Subject: PlanCheck Page Label: A-501 Author: justinh File Name: Change Order Plan Set.415 E Hyman.2018.02.pdf Provide a cutsheet on this 20-minute rated window assembly. Subject: PlanCheck Page Label: EL1-1 Author: justinh File Name: Change Order Plan Set.415 E Hyman.2018.02.pdf Provide compliant lighting controls per IECC C405.2. All private offices, the conference room and copy room require occupancy sensors per C405.2.1, other spaces not on occupancy sensors or daylight sensors are required to be on time switch controls. Currently you are only showing the daylight zones and manual light reduction controls (dimmers). Subject: PlanCheck Page Label: EL1-1 Author: justinh File Name: Change Order Plan Set.415 E Hyman.2018.02.pdf These lights are outside and should be on a exterior lighting ComCheck, please submit that document and remove these three from the interior lighting ComCheck. 1'-0"3'-0"1'-0" 5'-0"3'-0"2'-0"PRIVATE OFFICE111 PRIVATE OFFICE109PRIVATE OFFICE110 44 5'-0"5'-0" 5 BA-301 IN-SWINGAUTOMATICDOOR AUTOMATICPUSH BUTTON AUTOMATICPUSH BUTTON EXISTINGELEVATOR COMMON SPACE DN 01 Provide a structural detail for these new window headers. 60" CIRCTURNING 5'-0"2'-0"3'-0"2'-0"2'-87"2'-1"2'-2"2'-8"1'-6"1'-10" 1'-6"1'-6"1'-3"1'-3"1'-5"1'-3"2'-8"1'-4"2'-10"1'-2"2'-6"SINK WITHACCESSIBLE KNEECLEARANCEPER A-006 UPPER CABINETS/PANTRY DW REF 2'-10"9"2'-11"2'-8"1'-4"2'-6"2'-0"3'-0" 1'-3"1'-0"1'-0"1"3'-4"7" SURFACE WITHACCESSIBLE KNEECLEARANCESEE A-005 EXISTING WINDOWTO REMAIN SCALE: 01 MAIN SCALE: 3/4" = 1'-0"02 KITCHEN SCALE: 3/4" = 1'-0"04 KITCHEN Your knee and toe clearance isdrawn backwards with the knee clearance at the lip of the sinkrather than the back, it is also missing dimensions showingcompliance with ANSI 306.2and 306.3. Please revise. EXISTING JOIST PER STRUCT WOOD FLOORING SHEATHING REF STRUCT BXU EXISTING WOOD STUD FIRE RATEDSEALANT 20-MIN RATEDGLASS TYPE X GYPBOTH SIDES COMMON SPACESOTHEBY'SOFFICES 01 SCALE: 1 1/2"= 1'C-1 UNRESTRAI Provide a cutsheet on this 20-minute rated window assembly. PRIVATE OFFICE 107 PRIVATE OFFICE 106 PRIVATE OFFICE 105 PRIVATE OFFICE 108 Provide compliant lighting controls per IECC C405.2. All private offices, the conference room and copy room require occupancy sensors per C405.2.1, other spaces not on occupancy sensors or daylight sensors are required to be on time switch controls. Currently you are only showing the daylight zones and manual light reduction controls (dimmers). AFF DESKS 102 HYMAN MALLDN SOTHEBY'S ASPENThese lights are outside and should be on a exterior lighting ComCheck, please submit that document and remove these three from the interior lighting ComCheck. All offices have manual on auto off dimmer switchesshown on the plans. Switches are labeled "MAD"Added ceiling mounted occupancy sensors in the copy center. See the attached plans for switch revisions. The com check has been revised, moving the 3 outside down lightsto the exterior section. See attached revised Co Check report. Structural details (A-504) and existing photos provided Knee and toe clearance updated and dimensioned on sheet A-401 per ANSI 306.2 &306.3. Cut sheet provided for 20-minute rated window assembly. Subject: PlanCheck Page Label: 1 Author: justinh File Name: COMcheck.415 E Hyman.2018.02.pdf Provide a cutsheet on the track lighting that verifies the wattage used on the ComCheck and the NRTL listing (only the down light was included in the cutsheets provided). COMcheck.415 E Hyman.2018.02.pdf (1) A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Office 2321 0.82 1903 1903Total Allowed Watts = Proposed Interior Lighting Power E(C X D)DFixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast BLamps/ Fixture C# of Fixtures Office (2321 sq.ft.) LED 1: C: LED DOWN LIGHT: LED Linear 10W:1 65 10 650 Track lighting 1: TRACK: TRACK WITH 4 - 9W LED HEADS: Wattage based on 4 feet of track 0 0 120 120 770Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with thebuilding plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.0 and to comply with anyapplicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES Project Title: Data filename: SOTHEBY'S ASPEN Z:\2017 Projects\17108 Sotheby's Aspen\energy - com check\17108 SOTHEBYS ASPENCOMCHECK - REVISED 2-19-18.cck 02/19/18Report date: 51 ofPage Provide a cutsheet on the track lighting that verifies the wattage used on the ComCheck and the NRTL listing (only the down light was included in the cutsheets provided). Cutsheet provided on track lighting used on the ComCheck,