Loading...
HomeMy WebLinkAboutFile Documents.415 E Hyman Ave.0082.2017.ACBKBuildingComment1 Subject: PlanCheck Page: A2.2 Author: justinh File Name: Plan Set.415 E Hyman Ave.2017.09.pdf An occupancy sensor will be required for the new lighting in the equipment room, note this on the plan. Plan Set.415 E Hyman Ave.2017.09.pdf (4) Subject: PlanCheck Page: A2.2 Author: justinh File Name: Plan Set.415 E Hyman Ave.2017.09.pdf You must demonstrate that the new equipment room will have compliant ventilation per IBC 3005.2. Subject: PlanCheck Page: S1.01 Author: justinh File Name: Plan Set.415 E Hyman Ave.2017.09.pdf A signed special inspection agreement is required for structural steel welding. Subject: PlanCheck Page: S1.01 Author: justinh File Name: Plan Set.415 E Hyman Ave.2017.09.pdf This is a IIIA building and this scope of work requires disturbing the existing fire rated floor assembly to add structural elements to the floor to support the new equipment. Provide a listed/tested assembly for this floor that meets the 1 hour fire rated requirement. UNIT 16 .:HifiB ·~(WAfll" f-E.fl '"' 3'-0" 7'-0"3'-11 3/4"7 7/8"4 3/8" 2'-5 1/4" 10'-8" NEW ELEVATOREQUIPMENT ROOM(IBC 3005.4 EXCEPTION 2.) NEW EQUIPMENTROOM DOOR (IBC 3005.1) NEW LINEAR FLUORESCENTLIGHT FIXTURE POWER UNITTANK ELEVATOR 1/2"3'-3"1'-5"3"2'-10 1/2" An occupancy sensor will be required for the new lighting in the equipment room, note this on the plan.3'-0" 7'-0"3'-11 3/4"7 4 3/8" 2'-5 1/4"3'-8 5/8"3 1/2"5'-1/8"10'-8"14'-5/8" CENTTURE TANK SKYLIGHT3'-3"1'-5"3"2'-10 1/2" You must demonstrate that the new equipment room will have compliant ventilation per IBC 3005.2. A signed special inspection agreement is required for structural steel welding. This is a IIIA building and this scope of work requires disturbing the existing fire rated floor assembly to add structural elements to the floor to support the new equipment. Provide a listed/tested assembly for this floor that meets the 1 hour fire rated requirement. Noted on plan 2/A2.2 See attached letter from Josh Anthe, T&E Marshall Enterprises. Also noted on plan 2/A2.2. See attached 415 E Hyman Special Inspection Agreement. See fire rated beam and floor assembly details on sheet A0.1.