Loading...
HomeMy WebLinkAboutFile Documents.427 E Hyman Ave.0102.2018 (6).ACBKCOMcheck Software Version 4.1.0.0 Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:Alteration Permit Date:OCTOBER 17, 2018 Construction Site: 427 E. HYMAN AVE. ASPEN, CO 81611 Owner/Agent: SCHOOLA, INC. dva OLIVELA 601 MONTGOMERY ST. SUITE 675 SAN FRANCISCO, CA 94111 Designer/Contractor: Rybak Architecture & Development, P.C. 600 E. Hopkkns Ave. Suite 303 Aspen, CO 81611 970 925 1125 Project Information Energy Code: OLIVELA TENANT IMPROVEMENT Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-First Floor (Retail:Sales Area): Exempt 2-Retail:Dressing/Fitting Room 32 0.71 23 3-Common Space Types:Storage <50 sq.ft.35 1.24 43 66Total Allowed Watts = (a)Area claimed must not exceed the illuminated area permitted for this allowance type. (b)Allowance is (B x C) or the actual wattage of the fixtures given in Proposed Power section, whichever is less. Area Category Exemption Qualifications Activity Area # Fixtures Repl./AddedPre-Alt.null Total # Watts Pre-Alt.Post-Alt. First Floor ( Retail:Sales Area 818 sq.ft.)91 2 Exemption: Less than 50% fixture replacement. 10813.000 8101.000 Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures First Floor ( Retail:Sales Area 818 sq.ft.): Exempt Incandescent 1: A: Large Pendant: Incandescent 60W:6 1 360 360 Incandescent 2: B: Small Pendant: Incandescent 60W:1 3 60 180 Retail:Dressing/Fitting Room (32 sq.ft.) LED 2: LED Wall Sconce: Other:3 1 12 12 Common Space Types:Storage <50 sq.ft. (35 sq.ft.) LED 1: D: LED MR 3.2W:4 1 12 12 24Total Proposed Watts = Project Title: Data filename: OLIVELA TENANT IMPROVEMENT C:\Users\DAVE\Dropbox (Rybak Architecture)\RAD CURRENT PROJECTS\Olivela\Project Management\Permit Submittal\Permit\2Olivela COMCheck.cck 11/06/18Report date: 61 ofPage Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.0.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES Project Title: Data filename: OLIVELA TENANT IMPROVEMENT C:\Users\DAVE\Dropbox (Rybak Architecture)\RAD CURRENT PROJECTS\Olivela\Project Management\Permit Submittal\Permit\2Olivela COMCheck.cck 11/06/18Report date: 62 ofPage Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.0.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E-100 Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: OLIVELA TENANT IMPROVEMENT C:\Users\DAVE\Dropbox (Rybak Architecture)\RAD CURRENT PROJECTS\Olivela\Project Management\Permit Submittal\Permit\2Olivela COMCheck.cck 11/06/18Report date: 63 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable Exception: Lighting controlled by occupancy sensors. C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E-100 C405.2.4 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E-100 C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: E-100 Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: OLIVELA TENANT IMPROVEMENT C:\Users\DAVE\Dropbox (Rybak Architecture)\RAD CURRENT PROJECTS\Olivela\Project Management\Permit Submittal\Permit\2Olivela COMCheck.cck 11/06/18Report date: 64 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: OLIVELA TENANT IMPROVEMENT C:\Users\DAVE\Dropbox (Rybak Architecture)\RAD CURRENT PROJECTS\Olivela\Project Management\Permit Submittal\Permit\2Olivela COMCheck.cck 11/06/18Report date: 65 ofPage Project Title: Data filename: OLIVELA TENANT IMPROVEMENT C:\Users\DAVE\Dropbox (Rybak Architecture)\RAD CURRENT PROJECTS\Olivela\Project Management\Permit Submittal\Permit\2Olivela COMCheck.cck 11/06/18Report date: 66 ofPage