Loading...
HomeMy WebLinkAboutFile Documents.432 E Hyman Ave.0174.2017 (3).ARBK Woods Building Tenant Improvement 430 E. Hyman Ave Aspen, CO 81611 Construction Management Plan To: City of Aspen Building Department 130 South Galena Aspen, CO 81611 From: Greg Woods, President G.F. Woods Construction Inc 430 E Hyman Ave Aspen, CO 81611 970-544-1833 City of Aspen Received 8/7/17 Building Department Construction Management Plan 430 E. Hyman Ave 1. Project Introduction 1.1. Approximately one thousand, three hundred seven (1,300) square feet of interior tenant finish will occur. This includes building removing and replacing all the current finishes of the existing apartment located at 432 E. Hyman Ave. Material storage will be located inside the building with staging/storage will be in the space itself. 1.2. Vicinity Map: 1.3. The property contains a mixed use building located in downtown Aspen neighboring to the Aspen Elks Building. There are six occupied tenants in the same building currently located on various floors. Scope of this remodel will be completed in 1 phase. We anticipate starting the project in early Aug with the expectation of total project buildout taking no more than four months. This building is serviced by public utilities. There are no plans for upgrading any of the utility services. 2. Project Documentation 2.1. Adjacent properties will be notified of work and provided contact information via the posting of the project sign the immediate neighbor will be notified of this construction an informed on an as need basis of possible construction impacts. This sign will include a brief scope of work and list contractor’s contact information. Because impacts beyond the licensed ROW area are not anticipated, specific notification and on-site meeting should not be necessary. 2.2. A project sign will be posted on the entry door of the building with the contractor's contact information. 2.3. Contact List: Owner: Woods Family Partnership 970-379-5356 General Contractor: G.F.Woods Construction, Greg Woods (970) 544-1833 / (970) 948-6483 City of Aspen Received 8/7/17 Building Department Site Supervisor: Greg Woods (970) 948-6483 Safety Officer: Greg Woods (970) 948-6483 Traffic Officer: Greg Woods (970) 948-6483 3. Project Implementation 3.1. Dates of Construction: Construction is expected to last 4 months (Aug 14, 2017 – Dec 10, 2017) and will only occur on approved dates Monday through Saturday. 3.2. Hours of Construction: Construction activity will only occur during the allowed hours of 7:30AM and 5:30PM Mon - Friday and 9AM to 5PM on Saturdays. 3.3. Excavation will not occur or encroach within 5’ of the property line. 3.4. Project is all interior scope so no job site fencing will be installed. 3.5. Project shall uphold utmost respect for public health and welfare. 4. Project Management 4.1. Parking for subcontractors and GF Woods Construction employees will be limited to street parking. Temporary material staging will be located inside the unit space on the 3rd floor. Contractors working at this site will use the public restrooms located at Wagner Park. All deliveries for the project will be taken immediately up to the 3rd floor. Contractor is requesting one Parking Permit for the site superintendent as the property and parking for the property is all located in the down town core. 4.2. Trash haul will be taken from the job site on an as needed basis and will be stored on the 3rd floor until ready to be removed. 4.3. Parking at the site is limited and is all metered. Carpooling and public transit will be encouraged and utilized to the greatest extent practicable. 5. Traffic Control 5.1. Traffic Control Supervisor will manage operations, if and when necessary. 5.2. Designated haul routes will be followed. Exhibit A 5.3. Maximum vehicle weight shall not exceed 10,000lbs. 5.4. Any traffic control required for deliveries will be coordinated with the City of Aspen Engineering Department. Deliveries will not be scheduled outside of the approved hours of construction. No more than one delivery truck can be accommodated at any time. Deliveries will be unloaded via the entry doors on the Hyman Ave in early morning hours or through the alleyway to the south of the building. 5.5. A Traffic Control Plan is not included as road blockages or traffic stoppages are not scheduled or anticipated due to the limited scope and nature of the project. 6. Pedestrian Protection 6.1. Pedestrian safety will be maintained per City Code Section 21.04.060, MUTCD Chapter 6D, the Americans with Disability Act, and IBC Chapter 33. 7. Sediment and Erosion Control – NA 8. Fugitive Dust Control – N/A. 9. Emissions – All construction vehicles will be maintained and in good running order. 10. Noise Suppression 10.1. Construction noise will be limited to 80 decibels at the property line whenever possible. And are not expected to be a concern with all construction activity contained indoors. 10.2. Loud or obtrusive work will be completed during the approved hours of 9AM to 5PM (Monday through Friday only). Neighbors will be notified 3 days advance. City of Aspen Received 8/7/17 Building Department City of Aspen Received 8/7/17Building Department