Loading...
HomeMy WebLinkAboutFile Documents.425 North St.0177.2018 (2).ARBKAJAX ROOFING COMPANY CONSTRUCTION MANAGEMENT PLAN 425 W. North ASPEN, CO 1. General 1.1 Total Project Demo – 4,260 SF of roofing materials 1.2 Table of Contents 2. Project Introduction 2.1 No soil disturbance is anticipated 2.2 See Attachment for Project Vicinity Map 2.3 Description of work Includes removal of existing wood roof. Install new roof. 3. Project Documentation 3.1 Permits Roof Permit Only 3.2 Project Notification A letter/email of explanation of the project will be given to all neighbors including two phone numbers if issues arise by the HOA Manager. 3.3 Project Sign Project will last less than 30 days so no sign is required 3.4 Contact List Roof Contractor – Ajax Roofing Company Jay Salle 618-3169 Lyle Cox 970-901-1762 4. Project Implementation 4.1 Dates of Construction Start approximately July 9th 4.2 Hours of Construction 8am – 5pm Monday through Friday 9am – 5pm Saturday (although no Saturday work is anticipated) 4.3 Construction Schedule Removal of Existing Roof:10 working day New Roof:10 working day 4.4 Site Fencing Site fencing around the area on our plan for materials disposal and toilet. 4.5 Site Map for Trees – N/A 4.6 Park Issues – N/A 07/02/2018 AJAX ROOFING COMPANY 5. Project Management 5.1 Parking Request w/ Site Plan We will park in the driveway 5.2 Emergency Vehicle Access 5.3 Construction Parking Details 5.4 Staging Area See plan. Materials will be on the roof. Old materials will be in storage area on plan and taken to the dump daily 5.5 Construction Trailer, Materials Storage, Waste Management Temp toilet in fenced area. 6. Traffic Control – Not Applicable 7. Pedestrian Protection – Not Applicable 8. Sediment and Erosion Control – Not Applicable 9. Fugitive Dust Control – Not Applicable 10. Emissions - Agreed 11.Noise Suppression The only tools we will be using are hand tools. No electric or gas tools will be used. 07/02/2018