Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.934 S Mill St.0095.2018 (2).ARBK
934 South Mill Street Schedule of Values Division 1 General Requirements Project Management $30,000 Supervision $40,000 Copies and Reprographics $200 Testing/Inspection Services $200 Temp Telephone/Internet $800 First Aid $200 Safety Signage $150 Sanitary Facilities $800 Const Crane $2,500 Selective Demolition $8,000 Progress Cleaning $6,500 Final Cleaning $3,000 Dumpster/Trash Removal $1,500 Construction Protection $3,000 Division 2 Site Construction Division 3 Concrete Division 4 Masonry Stone Cap $1,000 House Flagstone $1,500 Demo exterior Flagstone $2,000 Divison 5 Metels Demo Structural Steel $2,000 Division 6 Framing $20,000 Framing Materials $8,000 Steel Stud's $4,000 Siding, Soffit and Fascia $6,000 Interior Trim $15,000 Sky lights $15,000 Division 7 WThermal and Misture Protection Insulation $4,000 Sky lights $3,000 Division 8 Doors and Windows $40,000 Ext Door/Windows hardware $2,000 Division 9 DFinishes/Drywall $50,000 Slab Tops $3,000 Wood Flooring Refinshing $15,000 4/11/2018 Wood Stairs Refinshing $10,000 Paint $30,000 Division 10 Specialties Division 15 Mechinical Fire Suppression $6,000 HVAC Relocation $6,000 Division 16 Electrical $25,000 General Liability Construction Insurance Total $365,350 4/11/2018