HomeMy WebLinkAboutFile Documents.845 Meadows Rd.0048.2018 (4).ACBKCOMcheck Software Version 4.0.8.1
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Construction Site:
845 Meadows Road
Aspen, CO 81611
Owner/Agent:
The Aspen Institute
1000 North 3rd Street
Aspen, CO 81611
Designer/Contractor:
Clanton & Associates, Inc.
4699 Nautilus Court South, Suite
102
Boulder, CO 80301
303-530-7229
Project Information
Energy Code:
Aspen Meadows Reception Renovation and Pavilion Addition
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-Dining: Bar Lounge/Leisure 14440 1.01 14584
14584Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
Dining: Bar Lounge/Leisure (14440 sq.ft.)
LED 1: F1: surface mounted area light: Other:1 24 26 624
LED 2: F1A: 4-ft wall mounted wraparound: Other:1 2 22 44
LED 3: F1B: 2-ft surface mounted wraparound: Other:1 1 17 17
LED 4: F2: 2x2 recessed luminaire: Other:1 11 19 209
LED 5: F3: 4-ft surface mounted luminaire: Other:1 2 20 40
LED 6: F4: 4-ft wall mounted vanity: Other:1 4 22 88
LED 9: F7: 4-ft surface mounted luminaire: Other:1 4 27 108
LED 10: F8: 1x4 recessed food service: Other:1 5 50 250
LED 11: F9: 2x4 recessed food service: Other:1 14 48 672
LED 12: F10: 6-in recessed food service: Other:1 20 23 460
LED 13: F11: Continuous task light - lf: Other:1 50 6 300
LED 14: F12: Round surface mounted area: Other:1 3 13 39
LED 15: F13: 20-ft recessed slot wall wash: Other:1 1 90 90
LED 16: F14: 4-in recessed adjustable: Other:1 23 18 414
LED 17: F14A: 4-in recessed adjustable remode: Other:1 1 12 12
LED 18: F15: Wall-mounted vanity light: Other:1 7 20 140
LED 19: F16A: 12' Linear lensed downlight: Other:1 1 54 54
LED 20: F16B: 16' Linear lensed downlight: Other:1 1 72 72
LED 21: F16C: 6' Linear lensed downlight: Other:1 1 27 27
LED 22: F16D: 4' Linear lensed downlight: Other:1 2 18 36
LED 23: F17: Surface mounted decorative: Other:1 7 30 210
LED 24: F18: LV steplight - Xfr: Other:1 3 60 180
Project Title:
Data filename:
Aspen Meadows Reception Renovation and Pavilion Addition
Z:\16120 Aspen Meadows Pavilion Addition\Calculations\Energy Calcs\Aspen Meadows Pavilion -
Alterations.cck
04/04/18Report date:
61 ofPage
05/
0
4
/
2
0
1
8
nic
k
t
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
LED 25: F19: Cable Track - Xfr: Other:1 12 300 3600
LED 26: F20: Decorative pendant: Other:1 4 180 720
LED 27: F21: Monopoint accent light: Other:1 13 14 182
LED 33: F26: Decorative pendant - xfr: Other:1 2 60 120
LED 34: F27: Monopoint accent light: Other:1 12 14 168
LED 28: Tea Set: Tea Set Puck Light - Xfr: Other:1 1 60 60
8936Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.1 and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES
Project Title:
Data filename:
Aspen Meadows Reception Renovation and Pavilion Addition
Z:\16120 Aspen Meadows Pavilion Addition\Calculations\Energy Calcs\Aspen Meadows Pavilion -
Alterations.cck
04/04/18Report date:
62 ofPage
Josie Wratten - Senior Designer April 4, 2018
05/
0
4
/
2
0
1
8
nic
k
t
Inspection Checklist
Requirements: 0.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.0.8.1
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the interior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Meadows Reception Renovation and Pavilion Addition
Z:\16120 Aspen Meadows Pavilion Addition\Calculations\Energy Calcs\Aspen Meadows Pavilion -
Alterations.cck
04/04/18Report date:
63 ofPage
05/
0
4
/
2
0
1
8
nic
k
t
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.2.1
[EL15]1
Lighting controls installed to uniformly
reduce the lighting load by at least
50%.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1
[EL18]1
Occupancy sensors installed in
required spaces.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1,
C405.2.2.
3
[EL23]2
Independent lighting controls installed
per approved lighting plans and all
manual controls readily accessible and
visible to occupants.
Complies
Does Not
Not Observable
Not Applicable
C405.2.2.
1
[EL22]2
Automatic controls to shut off all
building lighting installed in all
buildings.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3
[EL16]2
Daylight zones provided with
individual controls that control the
lights independent of general area
lighting.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3,
C405.2.3.
1,
C405.2.3.
2
[EL20]1
Primary sidelighted areas are
equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3,
C405.2.3.
1,
C405.2.3.
3
[EL21]1
Enclosed spaces with daylight area
under skylights and rooftop monitors
are equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
C405.2.4
[EL4]1
Separate lighting control devices for
specific uses installed per approved
lighting plans.
Complies
Does Not
Not Observable
Not Applicable
C405.2.4
[EL8]1
Additional interior lighting power
allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
Complies
Does Not
Not Observable
Not Applicable
C405.3
[EL6]1
Exit signs do not exceed 5 watts per
face.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Meadows Reception Renovation and Pavilion Addition
Z:\16120 Aspen Meadows Pavilion Addition\Calculations\Energy Calcs\Aspen Meadows Pavilion -
Alterations.cck
04/04/18Report date:
64 ofPage
05/
0
4
/
2
0
1
8
nic
k
t
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C303.3,
C408.2.5.
2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
C405.4.1
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
C408.2.5.
1
[FI16]3
Furnished as-built drawings for
electric power systems within 90 days
of system acceptance.
Complies
Does Not
Not Observable
Not Applicable
C408.3
[FI33]1
Lighting systems have been tested to
ensure proper calibration, adjustment,
programming, and operation.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Meadows Reception Renovation and Pavilion Addition
Z:\16120 Aspen Meadows Pavilion Addition\Calculations\Energy Calcs\Aspen Meadows Pavilion -
Alterations.cck
04/04/18Report date:
65 ofPage
05/
0
4
/
2
0
1
8
nic
k
t
Project Title:
Data filename:
Aspen Meadows Reception Renovation and Pavilion Addition
Z:\16120 Aspen Meadows Pavilion Addition\Calculations\Energy Calcs\Aspen Meadows Pavilion -
Alterations.cck
04/04/18Report date:
66 ofPage
05/
0
4
/
2
0
1
8
nic
k
t