Loading...
HomeMy WebLinkAboutFile Documents.845 Meadows Rd.0048.2018 (7).ACBK"West,Wide or Width"H. PT.HORIZ.HC.GR.GradeHigh PointHandicap(ped)HorizontalYD.W.YardUnit PaverGeneral ContractorGA.G.C.FT.FTG.F.O.S.Face of StudsFootingGaugeFoot or FeetU.PVRInch(es)Top of BeamTop of MasonryTop of PlateTop of ParapetC.M.U.Concrete Masonry UnitFire Extinguisher CabinetFinished Floor ElevationFace of ConcreteFL.FloorF.O.C.F.O.F.FLASH.FND.FlashingFoundationFace of FinishF.E.C.FFIN.F.F.E.F.H.EXT.F.D.EXC.EX.Flow lineFire HydrantFinish(ed)ExistingExcavateExteriorFloor DrainT.O.PL.T.O.M.T.O.P.T.O.BM.Expansion JointDTL.DetailELEV.EMER.ENCL.ELEC.EL.E.(E) eE.J.DWG.ElevationElectricalElevatorEmergencyEnclosureDrawingExistingEastDIMN(S).DS.DAMP.DEP.CONC.CTR.COL.C/ODampproofingDepress(ed)Dimension(s)DownspoutColumnCenterCleanoutConcreteAbove finished FloorBottom of WallC.J.CLCLRC.B.BM.B.O.W.BRG.BLDG.BET.Catch BasinControl JointCenterlineClearBuildingBottomBearingBetweenA.D.ARCH.ASPH.ADD'LA.F.F.Area DrainAsphaltAddition(al)Architect(ural)IN.ABBREVIATIONSNot To ScaleCoefficientNational FirePerforatedNoiseRreductionNoise ReductionOpposite SurfaceOpposite HandOutside DiameterNot In Contract Polyvinyl ChloridePlastic LaminateProtection AssociationQuarry TilePrefinishedRefrigeratorPrecast ConcretePounds Per Lineal FootReinforce (ed)Reflected Ceiling PlanRequest For InformationReference/Refer ToReflect (ed) (ive) (or)Radius / RadiantPrefabricatedRequest For ProposalRevis (e) (ed) (ion)Right Hand (ed)NorthNominalNaturalNN.R.C.NOM.NAT.N.R.N.T.S.N.I.C.NFPAOpposite OverheadOverall On Center OpeningPanelPointPlateParkingParallelPlasterPerimeterPaintedPlywoodOPP.S.OPP.OPP.H.O.H.0.A.O.D.O.C.OPNG.PNL.PERF.PKG.PAR.PVCPLAS.P.LAM.PL.PERIM.PTD.PT.PLYWD.PWDR.Return AirRegisterRequiredPLFQ.T.PREFIN.PSFPSIPREFAB.REINF.R.C.P.R.F.I.R.A.RAD.RFL.REG.REFR.REF.R.F.P.REQ'D.REV.R.H.P.C.CONC.PowderVERT.V.C.T.V.G.WSCT.V.R.VAR.W.W.F.W.P.W.C.V.I.F.WithW/WDW.WD.W/OW.W.M.W.PT.Vertical GrainVerticalVinyl Composition TileWainscotVaries / VariableVapor RetarderWelded Wire FabricWaterproofingWoodWithoutWindowWater ClosetVerify In FieldWelded Wire MeshWorking PointIntermediateInclude (ing)Laminate(d)LaboratoryLight WeightMechanicalInside DiameterHot Water HeaterManufacture (er)Masonry OpeningMaster BedroomMiscellaneousHourInvertInteriorInsulationJoistJointKitchenKnock OutINTERM.INSUL.INV.INT.H.W.H.I.D.INCL.HR.JST.JT.K.O.KIT.LabelLintelLightLeft Hand LavatoryLive LoadLow PointMasonryManholeMaximumMaterialMembraneMediumLBL.LTL.LAM.LABLT.WT.L.H.LT.LAV.L.L.L.PT.M.H.MAS.MFR.MAX.MAT'L.M.O.MEMB.MED.M.BR.MECH.MeterMullionMountModularMouldingMountedMinimumMillimeterMMISC.MT.MOD.MLDG.MULL.MTD.MIN.MMMTL.MetalRiserRoomSCHED.SECT.RM.R.D.R.O.R.S.SouthSteelS.C.SPKR.SHT.SIM.SPEC.ST. STL.STA.STOR.SQ.STL.STD.SYS.STRUCT.SUSP.SYM.TEL.S.T.C.S.D.T&GTHK.THR.TOL.TYP.T.O.J.T.O.C.T.B.T.O.F.T.P.D.T.P.H.T.O.L.T.O.S.T.O.W.T.B.D.T.V.SHTH'G.U.C.UNFIN.U.N.O.U.B.C.Solid CoreSpeakerSound TransmissionScheduleSheathingSheetSectionSimilarSpecification (s)StandardStationStorageSquareStainless SteelSystemSuspendedSymmetricalStructure / StructuralTelephoneThick (ness)ThresholdTelevisionTolerance CoefficientTongue And GrooveTypicalUnfinishedUndercutTop Of JoistTreadUniform Building CodeTop Of ColumnTop Of ConcreteTowel BarTop Of FootingRoof DrainRough OpeningRough SawnSmoke Detector / Storm Drain (site) /Schematic DesignToilet PaperDispenserToilet PaperHolderTop Of LedgeTop Of SlabTop Of WallTo Be DeterminedOtherwiseUnless NotedUnderwritersLaboratories, Inc.TR.U.L.dDemolitionLengthLG.Monitoring WellM.W.Not ApplicableN.A.Overflow DrainOFD.Pounds Per Square FootPounds Per Square InchProperty LinePPower PoleP.P.Remove(R)Roof DrainR.D.RegardingRE:Retain(ing)RET.Right Of WayR.O.W.RSR.SSouthS.F.Square FeetSIM.SimilarS.O.G.Slab On GradeTop Of CurbTop Of SteelWasher and DryerW/DD/WDishwasherG.D.Garbage DisposalGENERAL NOTES:1.ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL LAWS, RULES AND REGULATIONSOF THE 2015 INTERNATIONAL BUILDING CODE FOR A TYPE 5B BUILDING, (A-2 & B) PLUMBING CODE,ELECTRIC CODE, FIRE DEPARTMENT RULES AND REGULATIONS, UTILITY COMPANY REQUIREMENTS,BUILDING MANAGEMENT'S ALTERATION AGREEMENT AND HOUSE RULES, ALL OTHER CITY, STATE ANDFEDERAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT, AND THE BEST TRADE PRACTICES.2.BEFORE COMMENCING WORK, THE CONTRACTOR SHALL FILE ALL REQUIRED INSURANCECERTIFICATES WITH THE DEPARTMENT OF BUILDINGS, OBTAIN ALL REQUIRED PERMITS, TESTS ANDINSPECTIONS, AND PAY ALL FEES REQUIRED BY THE GOVERNING CITY OF ASPEN AND PITKIN COUNTYAGENCIES.3.CONTRACTOR IS TO PROVIDE CERTIFICATES OF LIABILITY INSURANCE AND PROOF OF WORKMAN'SCOMPENSATION AND DISABILITY COVERAGE AS PER THE ALTERATION AGREEMENT.4.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COORDINATION INCLUDING THE WORK DONE BYOTHERS. CONTRACTOR SHALL COORDINATE WITH THE BUILDING MANAGEMENT AND BUILDINGSUPERINTENDENT OF BUILDING RULES AND REGULATIONS DURING ALTERATION. ALL RULES SHALL BESTRICTLY ADHERED TO. ANY COSTS RELATED TO THE USE OF BUILDING FACILITIES AND EQUIPMENT SHALLBE PAID FOR BY THIS CONTRACTOR AND AT NO ADDITIONAL EXPENSE TO THE OWNER.5.CONTRACTOR SHALL VISIT AND EXAMINE CLOSELY ALL EXISTING CONDITIONS AT THE SITE AND THOSEAREAS AFFECTING WORK AS REFERENCED IN DRAWINGS AND SPECIFICATIONS. IMPLEMENTATIONREQUIRED TO EXECUTE THIS WORK IS THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISENOTED. CONTRACTOR ACCEPTS ALL SUCH CONDITIONS AND REQUIREMENTS AND ASSUMES ALLRESPONSIBILITY AND COSTS RESULTING FROM FAILURE TO OBTAIN KNOWLEDGE OF THEM.6. CONTRACTOR SHALL INDEMNIFY THE OWNER (THE ASPEN INSTITUTE) AND HIS AGENTS (JEFFREYBERKUS ARCHITECTS, INC.) FOR AND AGAINST ALL SUITS, CLAIMS OR LIABILITY ON ACCOUNT OF PERSONALINJURIES OR PROPERTY DAMAGE ARISING OUT OF NEGLIGENT ACTS OF THE CONTRACTOR ORSUBCONTRACTORS IN THE PERFORMANCE OF WORK COVERED BY THE CONTRACT.7.MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT REQUIRED FOR PROPER CONSTRUCTIONFOR ANY PART OF THE WORK SHALL BE INCLUDED AS IF THEY WERE INDICATED IN THE DRAWINGS.8.DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS SHALL ALWAYS TAKE PRECEDENCE OVERSCALED DRAWINGS.9.ALL WORK SHALL BE CARRIED OUT IN A PROFESSIONAL MANNER IN ACCORDANCE WITH INDUSTRY ANDCODE STANDARDS FOR EACH SPECIFIC TRADE AND FOR THE OVERALL PROJECT IN GENERAL.10.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A CODE COMPLIANT, FULLY OPERATIONALINSTALLATION FOR ALL WORK AS INDICATED ON THESE DRAWINGS AND SPECIFICATIONS AND SHALLINCLUDE ALL COMPONENTS FOR ITEMS SHOWN WHETHER OR NOT SHOWN IN DETAIL.11.MATERIALS, PRODUCTS, AND EQUIPMENT DESCRIBED IN THE BID DOCUMENTS ESTABLISH ASTANDARD OF REQUIRED FUNCTION, DIMENSION, APPEARANCE, AND QUALITY. SUBSTITUTIONS SHALL BEMADE ONLY WITH APPROVAL OF THE OWNER AND ARCHITECT, AND WITH FULL DISCLOSURE OF THEDIFFERENCES BETWEEN THE SPECIFIED AND THE SUBSTITUTED ITEMS AS REQUIRED BY DIVISION 1 OF THEPROJECT MANUAL.12.CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL EXISTING CONDITIONS ANDDIMENSIONS IN THE FIELD PRIOR TO BEGINNING CONSTRUCTION WORK, AND SHALL EXAMINE THECONTRACT DOCUMENTS, AND SHALL NOTIFY ARCHITECT OF DISCREPANCIES BETWEEN ASSUMED ANDEXISTING CONDITIONS SO THAT APPROPRIATE CHANGES, CORRECTIONS, OR ADJUSTMENTS CAN BE MADEIF SO NECESSARY.13.CONTRACTOR SHALL INSURE THAT ALL REQUIRED BUILDING CODE AND LIFE SAFETY INSPECTIONSARE PERFORMED AND RECORDED.14.ALL DIMENSIONS INDICATED ARE TO FACE OF STUD (F.O.S.) UNLESS OTHERWISE NOTED. NOTIFYARCHITECT OF ANY DISCREPANCIES OR IF THERE ARE ANY QUESTIONS. PROVIDE FLOOR PLAN LAYOUT INCHALK LINE FOR ARCHITECT APPROVAL PRIOR TO WALL CONSTRUCTION.15.(V.I.F.) DIMENSIONS INDICATES LEAST CRITICAL FIGURE. DETERMINE ACTUAL VALUE IN FIELD ANDNOTIFY ARCHITECT. 'HARD' DIMENSIONS TO EITHER SIDE CONTROL FINAL DIMENSIONS.16.CONTRACTOR SHALL DESIGN AND INSTALL ADEQUATE SHORING AND BRACING FOR ALL STRUCTURALOR REMOVAL TASKS, INCLUDED BUT NOT LIMITED TO ADJACENT SITES, BUILDINGS AND PUBLIC RITES OFWAY. ANY REQUIRED PERMITS SHALL BE OBTAINED FROM LOCAL JURISDICTIONS FOR NECESSARY WORK.19. IN CASE OF CONFLICT OF INFORMATION IN THE DRAWINGS AND SPECIFICATIONS, THE COSTLIERINSTRUCTIONS AND SCOPE SHALL PREVAIL UNLESS DETERMINED OTHERWISE BY THE ARCHITECT.CONTRACTOR TO CONTACT ARCHITECT WITH ANY DISCREPANCIES, CONFLICTS, ETC. PRIOR TOCONSTRUCTION.20. CONTRACTOR SHALL PROVIDE AND PAY FOR A TELEPHONE AND THE TELEPHONE SERVICE FOR THEDURATION OF THE PROJECT. TO USE THE OWNER'S TELEPHONE OR SERVICE AT ANY TIME DURING THECOURSE OF WORK IS FORBIDDEN.21. ALL EXHAUST SYSTEMS MUST BE COMPLETELY SEALED DURING AND AFTER INSTALLATION. SHUT OFFVALVES TO BE PROVIDED AT THE RISER 'T' WITH AN ACCESS PANEL. LOCATIONS TO BE COORDINATED INTHE FIELD WITH ARCHITECT.22. CONTRACTOR TO MAINTAIN FIRE RATED CONSTRUCTION AS REQUIRED AT SHAFTS, STRUCTURALMEMBERS, ETC. CONTRACTOR TO PROVIDE FIRESTOPPING AT ALL PENETRATIONS (NEW AND EXISTING)THROUGH DEMISING WALLS, SLABS, CHASES, ETC. CONTRACTOR TO PATCH AND FIRESTOP WITH 2-HOURRATING ANY OPENINGS IN THE SLAB.23. WHERE CHASES, SHAFTS, DEMISING WALLS, AND STRUCTURAL ELEMENTS ARE OPENED DURINGCONSTRUCTION, PROVIDE FIRESTOPPING AS REQUIRED BY CODE AT ALL EXISTING OR NEW OPENINGS. AUL RATED FIRESTOPPING SYSTEM IS TO BE PROVIDED AS MANUFACTURED BY STI, HILTI OR EQUAL (ULRATING ON SUBSTITUTIONS IS REQUIRED).24.WHERE EXISTING VAPOR BARRIER AND INSULATION HAS BEEN REMOVED, CONTRACTOR TO REPLACEAND HAVE INSPECTED.25.ALL FRAMING AND BLOCKING WOOD AND PLYWOOD SUBSTRATES WILL BE NON-COMBUSTIBLE ATCOMMERCIAL USE.26.CONTRACTOR TO PROVIDE AND MAINTAIN REQUIRED FIRE EXTINGUISHERS ON THE SITE.27.ALL TERRACE HOSE BIBS WILL RECEIVE DEDICATED SHUT-OFF VALVES, DRAIN HOSES, AND ACCESSPANELS IN PROXIMITY OF BIBS. INSULATION AND VAPOR BARRIERS WILL BE PROVIDED AND MAINTAINED.28.BUILDING RISERS, INCLUDING PLUMBING AND ELECTRICAL ARE TO BE LOCATED PER MEPDOCUMENTS. ANY CONFLICTS ARE TO BE BROUGHT TO THE ATTENTION OF BOTH THE MEP CONSULTANTAND ARCHITECT FOR RESOLUTION.29.CONTRACTOR TO PROVIDE PROTECTION AS PER THE GENERAL MANAGER'S REQUIREMENTS. ALLTOILET EXHAUSTS ARE TO BE COVERED, HVAC UNITS PROTECTED OR REMOVED FROM THE SITE, THEHALLWAYS PROTECTED WITH MASONITE AND STICKY MATS PROVIDED EACH DAY AT THE ELEVATORS ANDAT THE FRONT DOOR. PROVIDE A FIRE EXTINGUISHER ON THE JOB SITE AT ALL TIMES30.PREVENT DIRT AND DUST FROM PERMEATING OTHER PARTS OF THE BUILDING DURINGCONSTRUCTION. MATERIALS AND OTHER RUBBISH WILL BE PLACED IN BARRELS OR BAGS. EMPTY BOXES,CONTAINERS, AND PACKING MATERIALS SHALL BE REMOVED DAILY AND RECYCLED WHEN APPLICABLE.31.ALL PIPING AND WIRING SHALL BE REMOVED TO A POINT OF CONCEALMENT AND SHALL BE PROPERLYCAPPED OR PLUGGED. ALL EXISTING AND NEW VALVES SHALL BE ACCESSIBLE EITHER EXPOSED OR FROMACCESS PANELS. ALL PLUMBING MUST BE INSULATED. THE PROPOSED WORK REQUIRED AT LEAST APARTIAL DRAIN-DOWN OF THE WATER SYSTEMS, TO BE COORDINATED WITH THE BUILDING.32.PLUMBING WORK SHALL BE PERFORMED BY PERSONS LICENSED IN THEIR TRADES WHO SHALLARRANGE AND OBTAIN THROUGH THE DEPARTMENT OF BUILDINGS ALL REQUIRED PERMITS, INSPECTIONSAND REQUIRED SIGN OFFS. NO PLUMBING SHALL PROJECT INTO OR BELOW THE STRUCTURAL SLABUNLESS LAID PRIOR TO ORIGINAL SLAB POUR.33.ALL NEW WALL FRAMING MUST BE METAL STUD CONSTRUCTION AND INCLUDE SOUND ATTENUATIONINSULATION WHERE POSSIBLE. FIRE RATED LUMBER TREATED WITH HAZARDOUS MATERIALS MAY NOT BEUSED. PROVIDE MOLD RESISTANT GYPSUM PANEL BY SPECIFIED COMPANY PER SPECIFICATION OR EQUALWHEREVER WALLS OR CEILINGS ARE REPLACED. ALL WALLS MUST BE COMPLETELY SHEATHED AND ALLOPENINGS IN BLOCK WALLS MUST BE PATCHED OR PLASTERED PRIOR TO INSTALLATION OF CABINETRY.THE INTEGRITY OF THE FIRE RATING OF ALL DEMISING WALLS MUST BE MAINTAINED.34.5 LB. ABC FIRE EXTINGUISHERS AND SMOKE DETECTORS ARE TO BE MAINTAINED IN WORKING ORDERDURING CONSTRUCTION.35.PRIOR TO THE INSTALLATION OF THE NEW KITCHEN CABINETS AND OTHER NEW CABINET WORK INTHE PROJECT, VERIFY THAT THE EXTERIOR WALL VAPOR BARRIERS AND DEMISING WALL CONDITIONSFIRE-RATINGS HAVE BEEN PROPERLY MAINTAINED. IN ADDITION, THE INSTALLATION OF CABINETWORKMAY NOT BLOCK ACCESS TO BUILDING SYSTEMS.36.UPON THE COMPLETION OF ALL WORK, PROVIDE COMPLETE CLEANING OF ENTIRE BUILDING ,INCLUDING REMOVAL OF ALL DUST AND DEBRIS.36.1.ELECTRICAL WORK SHALL BE PERFORMED BY PERSONS LICENSED IN THEIR TRADES WHO SHALLARRANGE AND OBTAIN THROUGH THE BUREAU OF ELECTRICAL CONTROL ALL REQUIRED PERMITS,INSPECTIONS, AND REQUIRED SIGN OFFS. CONTRACTOR TO PROVIDE A CERTIFICATE OF ELECTRICALINSPECTION UPON COMPLETION OF THE WORK.36.2.LOCATE ALL OUTLETS AND FIXTURES AS PER ALL APPLICABLE LOCAL CODES.36.3.REVIEW EXACT LIGHT LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION. CONTRACTOR TONOTIFY ARCHITECT OF ANY DISCREPANCIES WITH LAYOUT, DIMENSIONS, CONFLICT, AND ANY UNEXPECTEDEXISTING CONDITIONS.36.4.ELECTRICAL OUTLETS WITHIN 6' OF WATER SUPPLY SHALL BE GFI TYPE.36.5.ALL RECEPTACLE, SWITCHES OR LAMP HOLDER BOXES SHALL BE SET FLUSH WITH ADJACENTFINISHED SURFACES.36.6.WHEN CENTERING LIGHT FIXTURES ON THE WALL, SUBTRACT CASING DIMENSIONS WHERENECESSARY FOR "CLEAR" WALL SPACE. REFERENCE ALL RELEVANT INTERIOR ELEVATIONS & DETAILS.36.7.OUTLETS, FIXTURES, J-BOXES FOR WINDOW TREATMENTS, ETC LOCATED ON BOTH DEMISING WALLSAND THE EXTERIOR WALLS MUST MAINTAIN THE EXISTING 2-HOUR FIRE RATING.36.8.ALL CEILING MOUNTED SPEAKERS MUST HAVE BACK BOXES TO PROVIDE SOUND ATTENUATION.37.REVIEW EXACT DIMENSIONS AND LOCATIONS OF THE MEDICAL CABINET'S DOOR SWING PRIOR TOINSTALLATION. CONTRACTOR TO NOTIFY ARCHITECT OF ANY DISCREPANCIES WITH LAYOUT, DIMENSIONS,CONFLICT WITH ANY PLUMBING FIXTURES, AND ANY UNEXPECTED CONDITIONS.2015 IECC COMPLIANCE:THE ADDITION/REMODEL OF THE ASPEN MEADOWS BUILDING SHALL MEET THE FOLLOWING BUILDINGENVELOPE REQUIREMENTS AS DISCUSSED WITH THE ASPEN CODE OFFICIALS ON OCTOBER 31ST,2016:·THE EXTERIOR ASSEMBLIES OF THE ADDITION WILL MEET THE UA TRADE OFF METHODREQUIREMENTS OF THE 2015 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) WITH 42%GLAZING.SHEET INDEXA0.01COVER SHEETGENERALCIVILC-0-01CIVIL ENGINEER - COVER SHEETC-0-02LEGEND, NOTES, AND ABBEVIATIONSA0.02GENERAL INFORMATION SHEETC-1-01EXISTING CONDITIONSC-1-02DEMOLITION PLANC-1-04PROPOSED SITE PLANC-1-05EROSION CONTROL PLANC-1-06PATIO GRADING AND DRAINAGE PLANC-1-07BICYCLE TRAIL PLAN AND PROFILEC-1-08FOUNDATION DRAIN PLANC-4-01PRE-PROJECT LOT COVERAGEC-5-01CIVIL DETAILSC-1-03EXCAVATION AND STABILIZATION PLANC-5-02CIVIL DETAILSC-5-03EROSION CONTROL BEST MANAGEMENT PRACTICESC-5-04EROSION CONTROL BEST MANAGEMENT PRACTICESLANDSCAPEL-1.0EXISTING CONDITIONS & TREE REMOVAL PLANL-1.1LANDSCAPE PLANL-2.0PRELIMINARY LIGHTING PLANARCHITECTURALA1.10ARCHITECTURAL SITE PLANFAR1EXISTING & PROPOSED BASEMENT LEVEL FLOOR AREAFAR2PROPOSED BASEMENT LEVEL FLOOR AREAFAR3PROPOSED LOWER & UPPER LEVEL FLOOR AREAEGRESS1OCCUPANCY / MEANS OF EGRESS PLAN / BASEMENT LEVELA2.00eEXISTING BASEMENT LEVEL PLANA2.10eEXISTING LOWER LEVEL PLANA2.20eEXISTING UPPER LEVEL PLANA2.30eEXISTING ROOF PLANA2.00dBASEMENT LEVEL PLAN (DEMO)A2.00BASEMENT LEVEL PLAN (OVERALL)A3.01EXTERIOR ELEVATIONSM1.00MECHANICAL GENERAL NOTES AND LEGENDM1.01MECHANICAL SCHEDULESA2.01BASEMENT LEVEL FLOOR PLAN (NORTH) ENLARGEDA2.02A2.10LOWER LEVEL PLAN (OVERALL)A2.11LOWER LEVEL FLOOR PLAN (NORTH) ENLARGEDA2.12LOWER LEVEL FLOOR PLAN (SOUTH) ENLARGEDA2.20UPPER LEVEL PLAN (OVERALL)A2.21UPPER LEVEL FLOOR PLAN (NORTH) ENLARGEDA2.22UPPER LEVEL FLOOR PLAN (SOUTH) ENLARGEDA2.30ROOF PLAN (OVERALL)A2.31ROOF PLAN (NORTH) ENLARGEDBASEMENT LEVEL FLOOR PLAN (SOUTH) ENLARGEDA3.02EXTERIOR ELEVATIONSA3.03EXTERIOR ELEVATIONSA3.04EXTERIOR ELEVATIONSA4.01BUILDING SECTIONSA4.02BUILDING SECTIONSA4.03BUILDING SECTIONSA6.01ASSEMBLIES AND DETAILSA6.02ASSEMBLIES AND DETAILSA7.01WINDOW & DOOR SCHEDULESA8.00BASEMENT LEVEL REFLECTED CEILING PLANS0.0SHEET SET, SPECIAL INSPECTION FORM, AND ABBREVIATIONSSTRUCTURALS0.1GENERAL NOTESS0.2TYPICAL CONCRETE DETAILSS0.3TYPICAL FRAMING DETAILSS2.00BASEMENT LEVEL FOUNDATION PLAN - SOUTH WINGS2.01BASEMENT LEVEL FOUNDATION PLAN - NORTH - ENLARGEDS2.02BASEMENT LEVEL FOUNDATION PLAN - SOUTH - ENLARGEDS2.10LOWER LEVEL FOUNDATION & FRAMING PLAN - SOUTH WINGS2.11S2.12LOWER LEVEL FOUNDATION &FRAMING PLAN - NORTH - ENLARGEDLOWER LEVEL FOUNDATION & FRAMING PLAN - SOUTH - ENLARGEDS2.20UPPER LEVEL FRAMING PLAN - SOUTH WINGS2.21UPPER LEVEL FRAMING PLAN - NORTH - ENLARGEDS2.22UPPER LEVEL FRAMING PLAN - SOUTH - ENLARGEDS2.30ROOF FRAMING PLAN - SOUTH WINGS2.31ROOF FRAMING PLAN - NORTH - ENLARGEDS5.1CONCRETE DETAILSS5.2CONCRETE DETAILSS5.3CONCRETE DETAILSS7.1STEEL DETAILSS7.2STEEL DETAILSS7.3STEEL DETAILSM1.02MECHANICAL DETAILSM2.00BASEMENT MECHANICAL PLAN (OVERALL)M2.01BASEMENT MECHANICAL PLAN (NORTH) ENLARGEDM2.02BASEMENT MECHANICAL PLAN (SOUTH) ENLARGEDM2.10LOWER LEVEL MECHANICAL PLAN (OVERALL)P1.00PLUMBING GENERAL NOTES AND LEGENDPLUMBINGP2.00BASEMENT LEVEL WASTE & VENT PLAN (OVERALL)P2.01BASEMENT LEVEL WASTE & VENT PLAN (NORTH) ENLARGEDP2.02BASEMENT LEVEL WASTE & VENT PLAN (SOUTH) ENLARGEDFS-0.1MEADOWS KITCHEN - MASTER PLANFOOD SERVICEFS-1.0MEADOWS KITCHEN - EQUIPMENT PLANFS-1.1MEADOWS KITCHEN - ELECTRICAL PLANFS-1.2MEADOWS KITCHEN - PLUMBING PLANFS-1.3MEADOWS KITCHEN - BUILDING WORKS PLANFS-1.4MEADOWS KITCHEN - HESTAN SHOP DRAWINGFS-0.2PLATO'S KITCHEN - MASTER PLANFS-2.0PLATO'S KITCHEN - EQUIPMENT PLANFS-2.1PLATO'S KITCHEN - UTILITY PLANFS-2.2PLATO'S KITCHEN - BUILDING WORKS PLANFS-2.3PLATO'S KITCHEN - HESTAN SHOP DRAWINGA0.03ORDINANCES & RESOLUTIONSF-0.0FIRE ALARM & FIRE PROTECTION COVER SHEETFIRE ALARM + FIRE PROTECTIONF-1.0FIRE ALARM & FIRE PROTECTION BASEMENT LEVELF-1.1F-1.2FIRE ALARM & FIRE PROTECTION LOWER LEVELFIRE ALARM & FIRE PROTECTION UPPER LEVELEGRESS2OCCUPANCY / MEANS OF EGRESS PLAN / LOWER LEVELEGRESS3OCCUPANCY / MEANS OF EGRESS PLAN / UPPER LEVELL-3.0PLANT LIST & NOTESS5.4CONCRETE DETAILSS5.5CONCRETE DETAILSS6.1MASONRY DETAILSS7.4STEEL DETAILSS7.5STEEL DETAILSM2.11LOWER LEVEL MECHANICAL PLAN (NORTH) ENLARGEDM2.12LOWER LEVEL MECHANICAL PLAN (SOUTH) ENLARGEDM2.20UPPER LEVEL MECHANICAL PLAN (OVERALL)M2.21UPPER LEVEL MECHANICAL PLAN (NORTH) ENLARGEDM2.22UPPER LEVEL MECHANICAL PLAN (SOUTH) ENLARGEDM2.30ROOF MECHANICAL PLAN (OVERALL)M2.31ROOF MECHANICAL PLAN (NORTH) ENLARGEDP2.10LOWER LEVEL WASTE & VENT PLAN (OVERALL)P2.11LOWER LEVEL WASTE & VENT PLAN (NORTH) ENLARGEDP2.12LOWER LEVEL WASTE & VENT PLAN (SOUTH) ENLARGEDP2.20UPPER LEVEL WASTE & VENT PLAN (OVERALL)P2.21UPPER LEVEL WASTE & VENT PLAN (NORTH) ENLARGEDP2.22UPPER LEVEL WASTE & VENT PLAN (SOUTH) ENLARGEDP2.30ROOF LEVEL WASTE & VENT PLAN (OVERALL)P2.31ROOF LEVEL WASTE & VENT PLAN (NORTH) ENLARGEDP3.00BASEMENT LEVEL PIPING PLAN (OVERALL)P3.01BASEMENT LEVEL PIPING PLAN (NORTH) ENLARGEDP3.02BASEMENT LEVEL PIPING PLAN (SOUTH) ENLARGEDP3.10LOWER LEVEL PIPING PLAN (OVERALL)P3.11LOWER LEVEL PIPING PLAN (NORTH) ENLARGEDP3.12LOWER LEVEL PIPING PLAN (SOUTH) ENLARGEDP3.20UPPER LEVEL PIPING PLAN (OVERALL)P3.21UPPER LEVEL PIPING PLAN (NORTH) ENLARGEDP3.22UPPER LEVEL PIPING PLAN (SOUTH) ENLARGEDP3.30ROOF LEVEL PIPING PLAN (OVERALL)P3.31ROOF LEVEL PIPING PLAN (NORTH) ENLARGEDP4.00WASTE AND VENT ISOMETRICMECHANICALC-1-09UTILITY PLANC-3-01TRAIL CROSS SECTION KEY MAPC-3-02TRAIL CROSS SECTIONSC-3-03TRAIL CROSS SECTIONSC-5-05EROSION CONTROL BEST MANAGEMENT PRACTICESC-1-10A2.10dLOWER LEVEL PLAN (DEMO)A2.20dUPPER LEVEL PLAN (DEMO)SURVEYIMPROVEMENT SURVEYPAVILION TRAIL PLAN AND PROFILERELOCATED FIBER OPTIC LAYOUT PLANC-1-11C-4-02LIMITS OF DISTURBANCESUBMITTED SHEETS NOT PREPARED OR CERTIFIED BY SGM:BY-1TEMPORARY MICROPILE WALL - COVERBY-2TEMPORARY MICROPILE WALL - LOCATIONSBY-3TEMPORARY MICROPILE WALL - PROFILEBY-4TEMPORARY MICROPILE WALL - GENERAL NOTESBY-5TEMPORARY MICROPILE WALL - SECTIONSBY-6TEMPORARY MICROPILE WALL - TYPICAL SECTIONS AND DETAILSBY-1PERMANENT GROUND NAIL - COVERBY-2PERMANENT GROUND NAIL - LOCATIONSBY-3PERMANENT GROUND NAIL - PROFILEBY-4PERMANENT GROUND NAIL - GENERAL NOTESBY-5PERMANENT GROUND NAIL - SECTIONSBY-6PERMANENT GROUND NAIL - TYPICAL SECTIONS AND DETAILSA7.02DOOR SCHEDULEL-1.01POST TREE REMOVAL CONDITIONS PLANFAR4GROSS FLOOR AREAA7.03SCHEDULESA9.01INTERIOR ELEVATIONS - MENS LOCKER 005A9.02INTERIOR ELEVATIONS - WOMENS LOCKER 006A9.03INTERIOR ELEVATIONS - MENS RESTROOM 112A9.04INTERIOR ELEVATIONS - WOMENS RESTROOM 114A9.05INTERIOR ELEVATIONS - WOMENS RESTROOM 114A9.06INTERIOR ELEVATIONS - WOMENS RESTROOM 209A9.07INTERIOR ELEVATIONS - MENS RESTROOM 213MP-1MICROPILE FOUNDATION - COVERMP-2MICROPILE FOUNDATION - LOCATIONSMP-3MICROPILE FOUNDATION - GENERAL NOTESMP-4MICROPILE FOUNDATION - DETAILSA2.32ROOF PLAN (SOUTH) ENLARGEDA4.04BUILDING SECTIONSA5.01WALL SECTIONSA5.02WALL SECTIONSA6.06DETAILSA6.07DETAILSA6.10LOWER LEVEL GUARDRAIL REFERENCE PLANA6.11UPPER LEVEL GUARDRAIL REFERENCE PLANA6.12GUARDRAIL REFERENCE DETAILSA6.13RAMP 02 + STAIR 06A6.14RAMP 02 + STAIR 06A6.15RAMP 02 + STAIR 06 DETAILSA9.08INTERIOR ELEVATIONS - LOUNGE 203A9.09INTERIOR ELEVATIONS - LOUNGE 203A9.10INTERIOR ELEVATIONS - LOUNGE 203A9.11INTERIOR ELEVATIONS - RECEPTION 212A6.08WATERPROOFING DETAILSA6.09DOOR DETAILSA6.09.1DOOR DETAILSA6.16STAIR 01 + STAIR 3 DETAILSA6.17A6.18A6.19A6.20STAIR 01 + STAIR 3 DETAILSSTAIR 01 + STAIR 3 DETAILSSTAIR 01 + STAIR 3 DETAILSSTAIR 02A6.21STAIR 02 DETAILSA8.30LOWER LEVEL EXTERIOR LIGHTING PLANA8.40UPPER LEVEL EXTERIOR LIGHTING PLANA9.12INTERIOR ELEVATIONS - SERVING 103A9.13A9.14INTERIOR DETAILSINTERIOR DETAILSA6.03A6.04A6.05DETAILSASSEMBLIES AND DETAILSASSEMBLIES AND DETAILSA6.30ELEVATOR 01A6.31ELEVATOR 02A6.32ELEVATOR 01 & 02 DETAILSA9.15INTERIOR DETAILSA8.20UPPER LEVEL REFLECTED CEILING PLANA6.40SITE DETAILSA9.12.1INTERIOR ELEVATIONS - SERVING 103A9.11.1INTERIOR DETAILSA8.10LOWER LEVEL REFLECTED CEILING PLANA9.12.2INTERIOR ELEVATIONS -BERNHARD ROOM FIREPLACEA6.09.2DOOR DETAILSA6.06.1DETAILSC-1-01AHISTORIC SUB-BASINSC-1-04APROPOSED SUB-BASINSC-1-06ADRAINAGE ALIGNMENTSC-1-06BDRAINAGE ALIGNMENTSS1.00SITE PLANS3.0SECTIONSS5.6CONCRETE DETAILSS5.7CONCRETE DETAILSS5.8CONCRETE DETAILSS7.6STEEL DETAILSS7.7STEEL DETAILSS7.8STEEL DETAILSS7.9STEEL DETAILSE1.00ELECTRICAL GENERAL NOTES AND LEGENDELECTRICALE1.01ELECTRICAL ONE LINE DIAGRAME1.02ELECTRICAL SCHEDULEE2.00BASEMENT LEVEL POWER PLAN (OVERALL)E2.01BASEMENT LEVEL POWER PLAN (NORTH) ENLARGEDE2.02BASEMENT LEVEL POWER PLAN (SOUTH) ENLARGEDE2.10LOWER LEVEL POWER PLAN (OVERALL)E1.03ELECTRICAL SCHEDULEE2.11LOWER LEVEL POWER PLAN (NORTH) ENLARGEDE2.12LOWER LEVEL POWER PLAN (SOUTH) ENLARGEDE2.20UPPER LEVEL POWER PLAN (OVERALL)E2.21UPPER LEVEL POWER PLAN (NORTH) ENLARGEDE2.22UPPER LEVEL POWER PLAN (SOUTH) ENLARGEDE2.30ROOF LEVEL POWER PLAN (OVERALL)E2.31ROOF LEVEL POWER PLAN (NORTH) ENLARGEDE1.04ELECTRICAL SCHEDULEE3.00BASEMENT LEVEL LIGHTING PLANE3.01BASEMENT LEVEL LIGHTING PLAN (NORTH) ENLARGEDE3.02BASEMENT LEVEL LIGHTING PLAN (SOUTH) ENLARGEDE3.10LOWER LEVEL LIGHTING PLANE3.11LOWER LEVEL LIGHTING PLAN (NORTH) ENLARGEDE3.12LOWER LEVEL LIGHTING PLAN (SOUTH) ENLARGEDE3.20UPPER LEVEL LIGHTING PLANE3.21UPPER LEVEL LIGHTING PLAN (NORTH) ENLARGEDE3.22UPPER LEVEL LIGHTING PLAN (SOUTH) ENLARGEDE4.00BASEMENT LEVEL EMERGENCY LIGHTING PLANE4.01BASEMENT LEVEL EMERGENCY LIGHTING PLAN (NORTH)E4.02BASEMENT LEVEL EMERGENCY LIGHTING PLAN (SOUTH)E4.10LOWER LEVEL EMERGENCY LIGHTING PLANE4.11LOWER LEVEL EMERGENCY LIGHTING PLAN (NORTH)E4.12LOWER LEVEL EMERGENCY LIGHTING PLAN (SOUTH)E4.20UPPER LEVEL EMERGENCY LIGHTING PLANE4.21UPPER LEVEL EMERGENCY LIGHTING PLAN (NORTH)E4.22UPPER LEVEL EMERGENCY LIGHTING PLAN (SOUTH)M1.03MECHANICAL EQUIPMENT CONTROL SEQUENCEA0.02GENERAL INFORMATIONSHEETFile Path: P:\Proj-2011\11028-Aspen Meadows_Pavilion\03_Drawings\11028_A0-01_Cover Sheet.dwgPlot Date/Time: April 05, 2018 - 11:11 am COPYRIGHT 2018 JEFFREY BERKUS ARCHITECTSTHE INFORMATION AND DESIGN INTENT CONTAINED ON THIS DOCUMENT IS THE PROPERTYOF JEFFREY BERKUS ARCHITECTS. NO PART OF THIS INFORMATION MAY BE USED WITHOUT THEPRIOR WRITTEN PERMISSION OF JEFFREY BERKUS ARCHITECTS. JEFFREY BERKUS ARCHITECTSSHALL RETAIN ALL COMMON LAW STATUTORY AND OTHER RESERVED RIGHTS, INCLUDINGCOPYRIGHT THERETO.Issue:SHEET TITLEPROJECT NO:DWG FILE:11028_A0-01_Cover Sheet.dwgSCALE:ASPEN MEADOWSRECEPTION RENOVATION+ PAVILION ADDITION2017.02.13JEFFREY BERKUSA R C H I T E C T S400 WEST MAIN STREET - SUITE 205ASPEN, CO 81611PHONE 970.925.7017FAX 970.925.7026CONSTRUCTION DOCUMENTS / PERMIT2017.03.07REVISED PRICING DRAWING SET2017.06.30FIRST COMMENT RESPONSES2017.06.1475% CONSTRUCTION DOCUMENTS2017.08.17CONSTRUCTION DOCUMENTS2017.12.05CONSTRUCTION DOCUMENTS REVISIONS2018.04.06BUILDING DEPARTMENT - CHANGE ORDER 01