Loading...
HomeMy WebLinkAboutFile Documents.515 E Hopkins Ave.0120.2018 (2).ACBK Construction Management Plan Regan construction Bootsy Bellows Aspen 11/16/2018 Page 1 of 6 Address: 515 E. Hopkins Permits Applied for: tenant Finish Property Owner’s name: Bootsy Aspen, LLC Andrew Sandler (617) 233-4504 cell Andrew@bootsybellows.com Architect David Johnson Architects 119 S. Spring Street , Aspen, Colorado 81611 970-925-3444 collin@djarchitects.com Structural Engineer James Jackson Romeo, P.E. Structural Design Consultant, L.L.C. 3901 Mountain Drive, #11, Glenwood Springs, CO 81601 970.945.4742 jim@jjrstructural.com Site Supervisor Willis Buckingham 970-948-9150 wbuckingham@reganconst.com Contractor’s name: Regan construction Phone: 970-923-0010 Email: Office@reganconst.com Willis Buckingham (970)948-9150 wbuckingham@reganconst.com 11/19/2018 Construction Management Plan Regan construction Bootsy Bellows Aspen 11/16/2018 Page 2 of 6 Description of work: Tenant Finish: Relocation of the bar and all components. Remove two walls to increase size of main room. Remove two walls and replace with glass(VIP/Green room). Reconfigure entry to public restrooms. Reconfigure hall from elevator to stairs lower level. Build and install new bottle service seating. Install new finishes throughout. (Flooring, paint, wood paneling, mirrors). Relocate lighting, a/v, audio systems room. Relocate electrical lighting panel. Relocate coat check at entry. Install ADA bar top. Remove large walk in cooler. Remove prep kitchen and replace with dish pit. Add staff bathroom. All work is interior and all trash and recycling will be remove daily without the use of a dumpster. All workers will use the existing bathroom in the lower level of the building. Public notification: Contractor shall send notification to neighbors addressing project phasing, schedule, traffic and/or pedestrian concerns, and hauling/staging operations. Notifications shall address all adjacent neighbors and all residents affected by possible traffic delays. The neighborhood notifications shall take place periodically, throughout the duration of the project, as required. Dates of construction: start: 11/16/2018 completion: 1/16/2018 11/19/2018 Construction Management Plan Regan construction Bootsy Bellows Aspen 11/16/2018 Page 3 of 6 Hours of construction: 7:30 AM-5:30 PM, Monday through Friday 9:00 AM-5:00 PM, Saturday Sequencing schedule: Demo 1 week Plumbing, Electrical, Mechanical 2 weeks Framing & Rough ins 1 week Finishes 3 weeks Total 2 months Vicinity map: S. Galena to landfill Haul Map: S. Galena st. to landfill Attached 11/19/2018 Scanned with CamScanner 11/19/2018 Scanned with CamScanner 11/19/2018