Loading...
HomeMy WebLinkAboutFile Documents.465 N Mill St.0054.2018 (3).ACBK465 North Mill Street. Construction Management Plan 1.0 General 1.1 Total Disturbance Area 1570 square feet 1.2 Table of contents This list is a Table of Contents. 2.0 Project Introduction 2.1 Total Project Disturbance area None 2.2 Project Vicinity Map 465 North Mill Street Site Location 2.3 Description that includes: 2.3.1 Background information Water damage. Drywall/asbestos removal and replacement. 2.3.2 Proposed Development Type Commercial: Interior Only. 3.0 Project Documentation 3.1 Describe the Permit Type, List Permit #’s and Include Copies of all Permits We do not have a permit number, as we are applying for a permit. We do not have copies of the permits, as we are applying for permit. 3.2 Indicate project notification per CMP Manual Will notify owners and business in 300 ft area. 05/11/2018 3.3 Project Sign is Constructed and Posted See Below 3.4 Contact List included for 3.4.1 Owner Building – 465 North MIll Street, Lex Tarumianz 970-618-5648 3.4.2 Contractor Aspen Remodeling Inc., Tim McMahon – 970-948-9760 3.4.3 Site Supervisor Tim McMahon- 970-948-9760 4.0 Project Implementation 4.1 Dates of Construction ​May 15th-May 25th, 2018 4.2 Hours of Construction Under Guidelines of CMP Manual and City of Aspen Code 4.3 Construction Schedule Drywall and asbestos removal- May 15-19; Drywall install and tape- May 20-25 4.4 Describe Project Fencing None N/A Interior Only 4.5 Site Map for Tree Protection Fencing/Tree Drip Line None N/A Interior Only 4.6 Parks Issues – Driplines, Permits, Demo None N/A Interior Only 5.0 Site Management 5.1 Right of Way Management Plan None N/A Interior Only 5.2 Emergency Vehicle Access and Ordinance None N/A Interior Only 5.3 Construction Parking Detail None N/A Parking lot available 5.4 Map Showing Locations (Staging Areas) (see Map) 05/11/2018 Staging will be in the two parking spaces in front of Dwell Pro. 6.0 Traffic Control 6.1 General Project takes place inside in controlled Space so no traffic impacts. 6.2 Project Haul Routes Per the CMP Manual 6.3 Weight and Size Limitations of Vehicles Standard Vehicles 6.4 Construction vehicles Activities Defined 6.4.1 Specify Delivery Vehicle None N/A 6.4.2 Maximum number of deliveries at a time 2 6.4.2.1 Hours of Delivery Working hours of 7:30am to 5:30pm Monday through Friday and 9am to 5pm on Saturdays 6.4.2.2 Exceptions to delivery schedule None 6.5 Include Traffic Control Plan Prepared by a Certified Traffic Control Supervisor None N/A 6.5.1 Site Access Location 6.5.2 Street/site signage control 6.5.3 Traffic control related to peak traffic hours and special event 6.5.4 Traffic flagging areas and hours 7.0 Pedestrian Protection None N/A 8.0 Sediment and Erosion Control 05/11/2018 None N/A 8.1 Storm Water Pollution Prevention Plan 8.1.1 Erosion Control Measures 8.1.2 Mud Track Location 8.1.3 Tire Washing Location 8.1.4 Concreter Washing Location 9.0 Fugitive Dust Control None N/A 9.1 Complete a fugitive dust control Plan 9.1.1 Sediment Tracking techniques 9.1.2 Water Trucks 9.1.3 24 hour Contact 10.0 Emissions None N/A 10.1 Assure Proper Vehicle Maintenance 10.2 Opacity – no darker than 40% 11.0 Noise Suppression Per City Code 11.1 Specify Noise equipment/methods used per CMP Manual 11.2 Noise modeling by noise engineer 11.3 Continued noise monitoring location and information 05/11/2018 465 North Mill Street Aspen, CO 81615 Building Permit # ____________________ General Contractor Aspen Remodeling Inc., Tim McMahon 970-948-9760 Contact Jeff Whisler 631-335-4063 Emergency Phone 631-335-4063 In the event of an emergency call 911 05/11/2018 05/11/2018 05/11/2018