HomeMy WebLinkAboutFile Documents.527 S West End St.0009.2018.ARBK1517 Blake Avenue, Suite 101
Glenwood Springs, CO 81601
Telephone ~ 970.945.8676
Fax ~ 970.945.2555
www.hceng.com
An Employee-Owned Company
Date: January 31, 2018
To: Justin Forman, Senior Project Manager I, City of Aspen
Office: 970-429-2783, Cell: 970-319-2210, justin.forman@cityofaspen.com
From: Roger Neal
High Country Engineering, Inc
1517 Blake Avenue, Suite 101
Glenwood Springs, CO 81601
Phone 970-945-8676, rneal@hceng.com
Address: 527 South West End Street
HCE Job No. 2141005.01
Permit Number: 0009.2018.ARBK
All comments highlighted have been addressed by High Country Engineering in response to COA
comments dated January 31, 2018.
ENGINEERING REVIEW COMMENTS AND CORRECTIONS
Permit Set
1.Add note that sidewalk in CITY ROW will need ROW permit.
Note has been provided on sheet C.1.001 that sidewalk in ROW needs ROW permit.
2.Boulder to be removed out of City Right-of-Way permanently.
Note has been provided on sheet C.1.001 to remove boulder from ROW permanently.
3.City Standard in URMP shows 70% ASTM C-33 and 30% organics (peat mix). See sheet
8-81.
Note has been revised on sheet C.1.001, for the Bio-Retention Pond Detail, to match the
COA standard in the URMP; 70% ASTM C-33 and 30% Peat Mix.
4.Although not a requirement with a minor drainage review, Engineering Department feels
it would be beneficial to communicate to the property owner on how to properly maintain
and operate the proposed BMP.
Maintenance and operation for the proposed BMP has been provided on sheet C.1.001,
please see note 5.
Roger D. Neal, P.E.
Licensed Professional Engineer, State of Colorado, License No. 29975
Land Surveying Civil Engineering
03/23/2018
Reviewed by Engineering
03/30/2018 9:14:48 AM
"It should be known that this review shall not
relieve the applicant of their responsibility to
comply with the requirements of the City of
Aspen. The review and approval by the City is
offered only to assist the applicant's
understanding of the applicable Engineering
requirements." The issuance of a permit based
on construction documents and other data shall
not prevent the City of Aspen from requiring the
correction of errors in the construction
documents and other data.