HomeMy WebLinkAboutFile Documents.520 S Original St.0110.2018 (2).ARBK Construction Management Plan 550 S. Original St. Unit A 1. Project Introduction 1.1. This project is located on the top floor of the Arrowhead condominium building located at 520 S. Original St. The space is 2,300SF of floor area covering the entire 3rd level. 1.2. Vicinity Map: Qa Qa 1.3. The apartment complex building is located on the SE corner of S. Original and E. Dean St. This project is currently in an indeterminate state of construction where major demolition and MEP rough in has been accomplished and put on hold. Minimal redesign of the existing space had been completed and GF Woods has been contracted to finish the remaining scope of this remodel consisting of interior finish work. Project duration is expected to be 7-8 months. 2. Project Documentation 2.1. Adjacent units will be notified of work and provided contact information via the posting of the project sign. All immediate neighbors and the HOA will be notified directly of this construction and informed on an as need basis of possible construction impacts. Because impacts beyond the licensed ROW area are not anticipated, specific notification and on-site meeting should not be necessary. 2,897SF 520 04/20/2018 2.2. A project sign will be posted on the entry door of the building with the contractor's contact information. 2.3. Contact List: Owner: Shea Trust General Contractor: G.F.Woods Construction, Eric Wynne (970) 319-6938 Site Supervisor: Jeremy Nolan (970) 366-9959 Safety Officer: Jeremy Nolan (970) 366-9959 Traffic Officer: Jeremy Nolan (970) 366-9959 3. Project Implementation 3.1. Dates of Construction: Construction is expected to last approximately 8 months (March 1, 2018 – November 30, 2018) and will only occur on approved dates Monday through Saturday. 3.2. Hours of Construction: Construction activity will only occur during the allowed hours of 7:30AM and 5:30PM Mon - Friday and 9AM to 5PM on Saturdays. 3.3. Excavation will not occur or encroach within 5’ of the property line. 3.4. Project is all interior scope so no job site fencing will be installed. 3.5. Project shall uphold utmost respect for public health and welfare. 4. Project Management 4.1. Parking for subcontractors and GF Woods Construction employees will be limited to street parking. Temporary material staging will be located within the garage in the basement of the structure and in the private street parking spaces allocated to the unit off Dean St. 4.2. Parking at the site is limited and is all metered, private or 2 hr. carpooling and public transit will be encouraged and utilized to the greatest extent practicable. 4.3. Map of Construction Management Plan is attached as Exhibit A. 5. Traffic Control 5.1. Traffic Control Supervisor will manage operations, if and when necessary. 5.2. Designated haul routes will be followed. Exhibit B 5.3. Maximum vehicle weight shall not exceed 10,000lbs. 5.4. Any traffic control required for deliveries will be coordinated with the City of Aspen Engineering Department. Deliveries will not be scheduled outside of the approved hours of construction. No more than one delivery truck can be accommodated at any time. Deliveries will be either from Dean St. or from S Original in early morning hours to cause the least disturbance. 5.5. A Traffic Control Plan is not included as road blockages or traffic stoppages are not scheduled or anticipated due to the limited scope and nature of the project. 6. Pedestrian Protection 6.1. Pedestrian safety will be maintained per City Code Section 21.04.060, MUTCD Chapter 6D, the Americans with Disability Act, and IBC Chapter 33. 7. Sediment and Erosion Control – NA 8. Fugitive Dust Control – N/A. 9. Emissions – All construction vehicles will be maintained and in good running order. 10. Noise Suppression 10.1. Construction noise will be limited to 80 decibels at the property line whenever possible. And are not expected to be a concern with all construction activity contained indoors. 10.2. Loud or obtrusive work will be completed during the approved hours of 9AM to 5PM (Monday through Friday only). Neighbors will be notified 3 days advance. unit with the 04/20/2018 DW U N IT A P A R K IN G SO U T H O R IG IN A L ST R E E T GLORY HOLE PARK U N IT A P A R K IN G & Tem p. St a gi n g & Tem p. St a gi n gVehic le Un load ing Zone Vehicl e U nl o a di n g Z o n e Garage Staging AccessUnit access via stair or elevator Unit access via staircase Exhibit A 04/20/2018 E MAIN S T W MAI N S T E DURA N T A V E E HOP K I N S A V E GI B S O N A V E E COO P E R A V E W HAL L A M S T W BLE E K E R S T N THIRD STS ASPEN STW FRA N C I S S T N FIFTH STW HOP K I N S A V E N MILL STNORTH S T N SIXTH STW SMU G G L E R S T N FOURTH STS MONARCH STPARK AVES MILL STR E D M T N R D N FIRST STS ORIGINAL STLAKE AVEN SECOND STS GARMISCH STLO N E P I N E R D O A K L N S HUNTER STS WEST END STE BLEE K E R S T N SPRING STNEALE AVEVINE ST S FIRST STSHADY LNMIDLAND AVEE HYM A N A V E S GALENA STGILLESPIE AVE W HYM A N A V E DEAN S T KIN G S T RI O G R A N D E P LN EIGHTH STS SPRUCE STMA P L E L N PARK CIRN GARMISCH STRACE STE HALL A M S T WATER S A V EN ASPEN STS THIRD STN SPRUCE ST TEAL CTA J A X A V ENICHOLAS LN W COO P E R A V E JUAN S T WILLIAMS WYASPEN MTN R DPUPPY SM ITH ST QUEEN ST CLEVELAND STLACET LN FOUN D E R S P L A C E C O T T O NW O O D L N S RIVERSIDE AVEN SEVENTH STPEARL CT SOUTH AVE SUMMI T S T GILBE R T S TS FIFTH STS SIXTH STW NO R T H S T S FOURTH STS SPRING STN RIVERSIDE AVES SPRING STDEAN S T S GALENA STN SEVENTH STP A R K C I R DEAN S TS MILL STASPEN MTN RDMap prepared by Engineering and GIS Department City of Aspen, CO 81611 May 4,2007 0 600300 Feet Legend Designated Heavy Haul Route Roads Parcels City Boundary OFFICIAL HEAVY HAUL ROUTE MAP Exhibit B 04/20/2018