Loading...
HomeMy WebLinkAboutFile Documents.520 S Original St.0110.2018 (9).ARBKnie cm ne n_ SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection andlor testing per Section 1704 of the International Building Code (IDC). Project Address: 520 S. Original St. Permit Number: 0110-2018-ARSK BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner's agent, shall complete two copies of this agreement and the attached Special -inspection and Testing Schedule, including the required acknowledgments. A pre -construction conference with the parties involved may be required to review the special -inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews far pre -qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. if required by the building official, they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. ArchitocAeagineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special -inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. 4. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall famish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special -inspection services. The special inspectodagency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] in case of an owner\contractor, the special inspecnr\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. 2. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. 3. Review shop drawings and submit design changes. The engineer or architect of recmd shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special -inspection agency written documentation of my verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved pins. Adequate notice shall be provided so the special inspector has time to become familiar with the project. 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator's shop, IBC Section 1704.2 shall require special inspection of the fabricated items. 2. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator's ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator's scope of work. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2. Approval of fabricator. Approval shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of fabrication. Upon completion of fabrication, the approved fabricator shall submit certificate of compliance to the building official stating that the work was performed in accordance with the approved construction documents. G. Building Department Responsibilities 1. Approve special -inspection program. The building department shall approve all special inspectors and special -inspection requirements. 2. Enforce special inspection. Work requiring special inspection and the building inspector shall monitor the performance of special inspectors. His\Her approval, in addition to that of the special inspector, must be obtained prior to placement of concrete, covering of structural steel, or other similar materials. 3. Review inspection reports. The building official should review special -inspection progress and final reports. 4. Perform Mal inspection. The building official should perform the final inspection and approval for a project [IBC Sec. 109.3.1] after the final special -inspection report has been reviewed and approved. Permit Number: ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. $yeW'm Signature: rinsed Name: Date:"7— Owner. Signature: rate/A`,l"/{y/ d Name Date: Signature: Printed Name: Engineer/Architect: Date: Signature: Printed Name: Contractor: GF Woods Construction Ede Wynne '+"-' Edc Wynne 7/17/18 Approved Fabricator: Signature: Printed Name: Date: Date: Signature: Printed Name: Inspected Fabricator: Printed Name: Date: (circle one) Signature: CITY OF ASPEN PITKIN COUNTY 0 2. Approval of fabricator. Approval shall be based upon review of We fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of fabrication. Upon completion of fabrication, the approved fabricator shall submit certificate of compliance to the building official slating that the work was performed in accordance with the approved construction documents. G. Building Department Responsibilitica 1. Approve special -inspection program. The building department shall approve all special inspectors and special -inspection requirements. 2. Enforce special inspection. Work requiring spmial inspection and the building inspector shall monitor the performance ofspecial inspectors. HisWer approval, in addition to that of the special inspmmq most be obtained prior to placement of concrete, covering ofshuctuml steel, or other similm materials. 3. Review inspection reports. The building official should review special -inspection progress and final reports_ d. Perform final inspection. The building official should pedorm the final inspection and approval for a project (IBC Sm. 109.3.11 after the final special-inspectiun report has been reviewed and approved. Project Address 520 S. Original, Unit A Permit Number. 0110.2018ARBK ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. a', =1 W ME Engined Architect: Signature: Printed Name: Daft Connactar. Signature: Printed Name: Dzte: GF Woods CanslmcLan Eric Wynne 1.,,-^�-�_s Gla Wyann mate Approved Fabricator Sign e: Printed Name: Date: �:,,,ty� 1 _- ��' .,1r�`— _;LZ_4�)r� brspeaaed Fabricator: Signature: Printed Name: Date: (chole one) Signaoue: Printed Name: Date: CITY OF ASPEN PD'KIN COUNTY: -- — 3 2. Approval of fabricator. Approval shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of Lbrication. Upon completion offabriestioo, the approved fabrieatur shall submit certificate of oompliance Be the building official stating that the work was performed in accordance with the approved cambuction documents. G. Building Department Responsibi8tlo 1. Approve special -inspection program. The bu8ding department shall approve all special inspectors and special -inspection requirements. 2. Enforce special inspection. Work requiring special inspection and the building inspector shall monitor the perfomrance ofspecial inspectors. HisWerapproval,in addition to that ofdre special inspector, must be obtained prior In placement of concrete, covetingofs cmmisteel,orolhersirnilynaterials. 3. Review inspection reports. The building official should review special -inspection progress and final reports. I - 0. Perform final inspection. The building official should perform the final inspection and approval for a project [IBC Seo. 109.3.1] after the final special -inspection report has been reviewed and approved Project Address:_S1O.S. Original, Unit A Permit NumLer: 01102018.ARBK ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special Inspection Agency: Signature: Printed Name: Dote: Owner. Sigantme: Printed Nems, Date ea SAY ShTrust OAA -V OA 59fly 5%e, 7. 19.1$ Eoginey/Architect: S' re: Printed Name: Data: Rybak Architecture1 !�— David Ryhak 07/11118 Contractor: Signatum: Printed Name: Date: G.F. Woods Greg Woods Approved Fabricator. Signature: Printed Noma Date: Printed Name: Date: Signature: Inspected Fabricator: Printed Name: Data Signaimo: (Oimla one) CITY OF ASPEN P17K[N()0OMT.' Bonnie uuhio+ 3