Loading...
HomeMy WebLinkAboutFile Documents.501 E Hyman Ave.0079.2018 (2).ACBK Construction Manager/General Contractor FCI Constructors, Inc. 3070 I-70B, Building A (81504) (970) 434-9093 (970) 434-7583 Fax P.O. Box 1767 Grand Junction, CO 81502 UTE CITY BUILDING – PITKIN COUNTY ELECTIONS OFFICE INTERIOR DEMOLITION CONSTRUCTION MANAGEMENT PLAN SUBMITTED TO: CITY OF ASPEN ENGINEERING DEPARTMENT 130 SOUTH GALENA ST. ASPEN, CO 81611 07/11/18 TABLE OF CONTENTS 1 ................................................................................ PROJECT INTRODUCTION & LOCATION 5 .............................. PROJECT DOCUMENTATION (PERMITS, PROJECT SIGN, CONTACTS) 9 .............................................. PROJECT IMPLEMENTATION (CONSTRUCTION SCHEDULE) 10.......................................................................................... SITE MANAGEMENT (SITE PLAN) 15................................................................................................................ TRAFFIC CONTROL 20......................................................................................... SEDIMENT & EROSION CONTROL 21..................................................................................................... FUGITIVE DUST CONTROL 22.............................................................................................................................. EMISSIONS 23............................................................................................................ NOISE SUPPRESSION 07/11/18 PROJECT INTRODUCTION FCI Constructors, Inc. will be completing interior demolition and modifications at the downstairs unit of the Vectra Bank Building located at 534 E. Hyman Ave. in downtown Aspen. This work is being completed for Pitkin County to remove the temporary Elections Offices setup currently in place and return the rented/leased space to its original condition as requested be the landlord and as agreed to between the landlord and Pitkin County. There is no exterior/site work associated with this project. All work is within the interior of the building. There will be no effect on public utilities that we know of. Page 1 07/11/18 PROJECT LOCATION Describe and Compute the Total Project Disturbance Area: The project located at 501 E. Hyman Ave. will consist of the demo/modification of the lower level unit within the building. Project Location & Vicinity Map Project extents/location/directional arrow/adjacent street names. SEE ATTACHED “PROJECT LOCATION & VICINITY MAP” Project Description Background information/development type/effect on public utilities (storm sewer/sanitary sewer/water/etc.) There will be no effect on public utilities that we know of. Page 2 07/11/18 Page 3 Please note the following: - All work associated with this project is at the interior of the building. There will be no site/soil disturbance involved. - This project does not have any effect on public utilities (storm sewer, sanitary sewer, water mains, etc.). PROJECT LOCATION & VICINITY MAP Page 1 of 2 N 07/11/18 Imagery ©2015 Google, Map data ©2015 Google 50 ft 501 E Hyman Ave Aspen, CO 81611 Street View 501 E Hyman Ave Ute City Building Page 1 of 2501 E Hyman Ave -Google Maps 11/3/2015https://www.google.com/maps/place/501+E+Hyman+Ave,+Aspen,+CO+81611/@39.1885... Page 4 PROJECT LOCATION & VICINITY MAP Page 2 of 2 N 07/11/18 PROJECT DOCUMENTATION Permits List applicable permits (describe & copy as an appendix) -Building Permits: Demo/Electrical/Mechanical Public Notification Project Representative: Mike McLain – Project Superintendent: 970-217-3893 Brady Blackmer – Project Manager: 970-434-9093 (Office) Preconstruction Meeting Date & Time: TBD – Work to be completed August 2018. Precon meeting to be set-up at least 2 weeks prior to this start date. Project Sign See attached example. Sign will be made per the City Standards See attached LOGISTICS MAP for location Contact Designation In Case of Emergency Call 911 Owner: Pitkin County Jodi Smith: 970-429-1900 485 Rio Grande Place #101 Aspen, CO 81611 Contractor: FCI Constructors, Inc. 3070 I-70 B, Bldg. A Grand Junction, CO 81504 Office: 970-434-9093 Project Superintendent Mike McLain: 970-217-3893 / mmclain@fciol.com Project Manager Brady Blackmer: O: 970-434-9093, C: 970-433-1600 / bblackmer@fciol.com State Certified Safety Officer Michael Saks: O: 970-434-9093, C: 303-881-9802 / msaks@fciol.com State Certified Erosion Control Officer Michael Saks: O: 970-434-9093, C: 303-881-9802 / msaks@fciol.com Pitkin County Administration 970-920-5200 Building Maintenance & Project Management 970-920-5377 Page 5 07/11/18 City of Aspen Administration 970-920-5212 Engineering Department 970-920-5080 Fire Department 970-925-5532 Police Department 970-920-5400 Sheriff’s Department 970-920-5300 Roaring Fork Transit Authority 970-920-1905 Utilities Electric: 970-920-5148 Water: 970-920-5110 Sewer: 970-920-5070 Gas: 800-563-0012 Aspen Valley Hospital 970-925-1120 Aspen School District 970-925-3760 Page 6 07/11/18 Page 7 INSERT PROJECT PERMITS AND OTHER RELEVANT DOCUMENTATION HERE WHEN AVAILABLE INSERT PROJECT PERMITS AND OTHER RELEVENT DOCUMENTATION HERE WHEN RECIEVED 07/11/18 PITKIN COUNTY ELECTIONS OFFICE TENANT IMPROVEMENT BUILDING PERMIT: #TBD IN CASE OF EMERGENCY CALL 911 FCI Constructors, Inc. 24 Hour Contact Mike McLain – Superintendent Cell: 970-217-3893 FCI Main Office: 970-434-9093 SAMPLE PROJECT SITE SIGN Page 8 07/11/18 PROJECT IMPLEMENTATION Construction Dates August 1 – August 15 Construction Hours Construction will take place Monday thru Friday from 7:30AM to 5:30PM and Saturdays as needed from 9AM-5PM. Any activity generating noise greater than 80db will take place between the hours of 9AM and 5PM Monday thru Friday only. Observed Holidays (As Applicable) Memorial Day Food & Wine Festival 4th of July Labor Day Thanksgiving Christmas Week New Year’s Day Memorial Day Interior work only may be performed on Presidents Day Sequence (Phasing) of Construction – N/A Adjoining Property Owners Since this project only includes work at the interior of the building, no effect on adjoining properties/adjacent businesses is anticipated. Project Fencing Since this project only includes work at the interior of the building no project fencing is anticipated. Materials will either be staged inside the construction area, or phased for “just-in-time” delivery. Natural Environment Since this project only includes work at the interior of the building, no effect on Aspen’s natural environment is anticipated. Page 9 07/11/18 SITE MANAGEMENT Parking Management Construction workers will be encouraged to carpool to the project site as much as possible. Carpool passes can be picked up daily at the Pitkin County Airport Parking Kiosk located on the Airport Frontage Road. Carpool passes are free and require a minimum of two occupants per vehicle. Kiosk hours are 6 a.m. to 11 a.m. Monday through Friday. Carpool permits are good for street parking in Carpool Zones only as specifically indicated by street signage, illustrated in the attached City of Aspen Residential Permit Parking and City of Aspen Carpool Parking Location map. Subcontractors can also purchase a monthly parking pass for the parking garage, currently $200/month (subject to change). All overflow traffic will park at the public Brush Creek Interceptor lot and take public transportation to the project. See attached City of Aspen Parking Zone Maps. Emergency Vehicle Access & Ordinance 35 Continuous emergency vehicle access will be maintained to the project site. Staging Areas Specify construction staging areas See attached Project Site Plan – if needed, small amounts of materials may be staged in the alleyway at the back of the Ute City Building. Number of truckloads expected to/from site There is no site work associated with this project. Only truckloads will be removal of demoed materials. Construction Trailer, Materials Storage, & Waste Management See the attached Project Site Plan for planned material storage, restroom locations, waste management locations. NOTE: There will not be a job trailer on site. Page 10 07/11/18 Project Site Plan If needed, small amounts of demoed materials may be staged in the alleyway at the back of the Ute City Building. Demoed materials will be brought out of the building via the back door placed in trucks and trailers for removal. Page 101 07/11/18 Page 17Page 12 07/11/18 Page 14City of Aspen Carpool Parking Locations 307/11/18 ALLEYALLEY E MAIN STE MAIN ST E DURANT AVEE DURANT AVE E HOPKINS AVEE HOPKINS AVE DEAN STDEAN ST S ASPEN STS ASPEN STS MONARCH STS MONARCH STS ORIGINAL STS ORIGINAL STS HUNTER STS HUNTER STS GARMISCH STS GARMISCH STE HYMAN AVEE HYMAN AVE E BLEEKER STE BLEEKER STN MILL STN MILL STRIO G R A N D E P L RIO G R A N D E P L E HALLAM STE HALLAM STS MILL STS MILL STN ASPEN STN ASPEN STE COOPER AVEE COOPER AVE N GARMISCH STN GARMISCH STN MONARCH STN MONARCH STNEALE AVENEALE AVE S GALENA STS GALENA STN SPRING STN SPRING STS SPRING STS SPRING STLIBRARY ALLEYLIBRARY ALLEY FOUNDERS PLFOUNDERS PLALLEYALLEY ALLEYALLEY E COOPER AVEE COOPER AVE ALLEYALLEYS SPRING STS SPRING STALLEYALLEY DEAN STDEAN ST ALLEYALLEY ALLEYALLEY ALLEYALLEY S GALENA STS GALENA STALLEYALLEY ALLEYALLEY E HYMAN AVEE HYMAN AVE DEAN STDEAN ST E BLEEKER STE BLEEKER ST ALLEYALLEY S MILL STS MILL STCity of Aspen Commercial Core, HOV and Handicapped Parking http://aspenpitkin.com/parking O0250125 Feet CITY HALL COUNTY COURTHOUSE ELEVATOR TO PARKING GARAGE RIO GRANDE PARKING PLAZA WHEELER OPERA HOUSE AND VISITOR CENTER WAGNER PARK PAEPCKE PARK This map/drawing/image is a graphical representation of the features depicted and is not a legal representation. The accuracy may change depending on the enlargement or reduction. Copyright 2014 City of Aspen/Pitkin County Commercial Core: Pay for Parking within this area at the blue sign State Highway 82 Handicapped Parking Free Carpool Parking with Daily Permit !P ROARING FORK RIVER Page 15 City of Aspen Carpool Parking Locations 4 07/11/18 TRAFFIC CONTROL Haul Routes This interior demo project will not require the use of heavy trucks to haul materials to or from the project. FCI does not see a need to address project haul routes. Please advise if this is not correct. On-Site Vehicle Limitations Define all construction related vehicle activities including max vehicle weights & sizes Pickup Trucks ¾ Ton – 5720lbs 1 Ton – 6027lbs 3-ton Delivery truck - TBD Delivery Requirements There will be no deliveries to the project site. Note: no vehicles to idle more than 5 minutes. Traffic Control Plan It is our understanding that this is not required as all of the work associated within this project is contained to the interior of the building and there is no public right of way associated with our construction activities. Please advise if this is not correct. Page 15 07/11/18 Page 17Page 16 07/11/18 Page 18Page 17 Not applicable to construction work 07/11/18 Page 19Page 18 07/11/18 Page 20Page 19 07/11/18 SEDIMENT & EROSION CONTROL Since this project includes work at the interior of the building (tenant improvement) a Storm Water Pollution Prevention Plan is not applicable. Page 21Page 20 07/11/18 FUGITIVE DUST CONTROL Fugitive Dust Control Plan: FCI does not anticipate any large amounts of dust being generated from this site as all of the construction work will be conducted at the interior of the building. For any dust control related concerns that may come up please contact the onsite Superintendent (contact info can be found at the beginning of this Construction Management Plan). Page 22Page 21 07/11/18 EMISSIONS Proper Vehicle Maintenance All vehicles associated with this construction project will be properly maintained such that the engines will function within manufacturer’s standards or parameters. Emissions Emissions from diesel engines shall be of a shade or density no darker than 40% opacity, except for starting motion no longer than 10 seconds or for stationary operation not exceeding 10 seconds. Page 23Page 22 07/11/18 NOISE SUPPRESSION General Any activity generating noises greater than 80db will be performed Monday thru Friday from 9AM to 5PM only. Please reference the following Construction Noise Suppression Plan. Noise Suppression Plan All reasonable efforts will be made to minimize noise associated with this construction project. This project has the benefit of being completely enclosed at the interior of the building, so no noise associated with heavy equipment, generators, jackhammers, and similar loud construction activities is anticipated. FCI will make all efforts to routinely notify neighbors of expected work activities and associated noise levels. Provide a phone number where the foreman can be reached prior to the start of the project: Project Manager – Brady Blackmer 970-433-1600 Project Superintendent – Mike McLain 970-217-3893 Page 23 07/11/18 Page 26Page 24 07/11/18 Page 27Page 25 07/11/18 Page 28Page 26 07/11/18 Page 29Page 27 07/11/18 Page 30Page 28 07/11/18