HomeMy WebLinkAboutFile Documents.602 E Cooper Ave.0006.2018 (3).ACBKConstruction Management Plan
602 East Cooper Suite 202
1.0 General:
Total Square Footage Interior Remodel 1700 SQ.Ft.
2.0 Project Introduction:
2.1Total Disturbance area is confined to Interior.
2.2 Project Vicinity Map attached. On Plan Cover sheet
2.3 Description of Work:
Demo non structural interior partition walls. Install wood flooring.
Install pre fab office partition walls.
3.0 Project Documentation:
3.1 Permit Types none have been issued thus far. Electrical,
Mechanical, Etc. will be applied for as needed.
3.2 N/A
3.3 N/A.
3.4 Project sign N/A.
3.5 Owners Name: Burrell Group 505-690-8625
Contractor: Jim Iglehart Construction 970-379-5990.
Site Supervisor: Jim Iglehart 970-379-5990.
Safety Officer: Jim Iglehart 970-379-5990.
4.0 Project Implementation:
4.1 Dates of Construction: Upon issuance of Building permit.
4.2 Per the City guidelines as listed in the Construction
Management Guidelines.
4.3 Construction Schedule: Anticipate 2 months of construction.
4.4 Project Fencing N/A.
4.5 Site Map N/A.
4.6 Parks: Not needed.
5.0 Project Management:
5.1 Parking Management not needed.
5.2 Emergency vehicle access Ordinance 35 N/A
5.3 Maps: N/A
01/18/2018
Minimal CMP
submitted. All
applicableregulations apply!
Will be checked
regularly in field for
compliance.
5.4
6.0 Traffic Control:
6.2 Project Haul Routes: N/A
6.3 Weight and Size Limitations N/A.
6.4 Minor deliveries for carpet and office partition walls will
happen periodically. No set schedule for this activity.
6.5 Traffic Control Plan: N/A.
8.0Sediment and erosion control: N/A.
9.0 Fugitive dust control: N/A.
10.0 Emissions: N/A.
11.0 Noise Suppression: N/A.
01/18/2018