Loading...
HomeMy WebLinkAboutFile Documents.520 E Cooper Ave.0085.2018 (3).ACBK Page 1 of 1 TRANSMITTAL Project: 520 E Cooper Ave, Unit C7 – MP ASPENOF C7 LLC Subject: Permit Submittal for Interior Only Alteration Date: 22 August 2018 To: Justin Hahn/Sofie Varga From: Alison Agley Via: City of Aspen Portal Attachments: See Below If you do not receive all attachments listed below, please call immediately. Dear Justin and Sophie, Please find downloaded to the portal the below items. We have named them from the building departments “document naming standards” and have included what we had discussed at our pre-submittal meeting on August 9, 2018. Let me know if you have any questions. We have REG on call for mechanical engineering/coordination and Evolve Structural Design if we find anything that needs further calculations once demo is started. Please find downloaded, the below files: 00_Owner’s Letter 00_Transmittal 01_Permit Application Form 02_Contact Sheet 03_Scope of Work Checklist 04_ IBC Building Description Form 05_ HOA Certification 06_Valuation Affidavit 07_Asbestos Questionnaire 08_Asbestos Test & Clearance Report 09_Zoning Compliance Verification Policy 10_Energy Code Compliance: (COMCHECK) 11_Construction Management Plan 12_ECU Calculations 13_Structural Demo Letter 14_Permit Drawing Set_2018-08-15 15_Spec Sheets (Lighting, Office Wall Systems, ADA Lockers) Thank you and please be in touch with any questions or requests for more information. Alison Agley 970.274.9796 alison.agley@rowlandbroughton.com