TRANSMITTAL
Project: 520 E Cooper Ave, Unit C7 – MP ASPENOF C7 LLC
Subject: Permit Submittal for Interior Only Alteration – REVISIONS AFTER COMMENTS
FROM 9/8/2018
Date: 24 September 2018
To: Justin Hahn/Sofie Varga
From: Alison Agley
Via: City of Aspen Portal
Attachments: See Below
If you do not receive all attachments listed below, please call immediately.
Dear Justin and Sophie,
Please find downloaded to the portal the below items. We have named them from the building departments “document
naming standards” and have included just the drawing sheets that have changes listed below plus spec sheet that were
requested.
Please find downloaded, the below files:
00_Transmittal
08_Asbestos Test & Clearance Report (IN PROGRESS DUE TO FINISH 9/28/2018 – WILL TURN IN)
10_Energy Code Compliance: (COMCHECK – WITH REVISIONS 9-25-2018)
14_Permit Drawing Set_2018-08-15 (SHEETS WITH REVISIONS 9-24-2018)
a) A0.3 – Access and Accessibility Diagrams (photos of existing bathrooms)
b) A2.2e – Existing Plan (existing electrical panel)
c) A2.2 – Proposed Plan (clearance adjustments, swapping swing of existing door)
d) A3.2 – Proposed Lighting Plan (reflecting comcheck)
e) A7.1 – Details (lighting penetrations into the fire rated ceiling type x boxing)
15_Spec Sheets
a) Lighting
b) Fire Dampers
c) Refrigerator
d) Dishwasher
Thank you and please be in touch with any questions or requests for more information.
Alison Agley 970.274.9796
alison.agley@rowlandbroughton.com