Loading...
HomeMy WebLinkAboutFile Documents.520 E Cooper Ave.0124.2018 (2).ACBKCOMcheck Software Version COMcheck-Web Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:Alteration Permit No.0085.2018.ACBK Permit Date:10/12/2018 Construction Site: 520 E Cooper Aspen, Colorado 81611 Owner/Agent:Designer/Contractor: Project Information Energy Code: 520 E COOPER UNIT C7&C9 CHANGE ORDER Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts 1-Shared Office Space (Common Space Types:Office - Open Plan)3076 0.98 3014 2-Ski Lockers (Common Space Types:Locker Room)946 0.75 710 3724Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixture Shared Office Space (Common Space Types: Office - Open Plan, 3076 sq.ft.) LED - Surface Mounted LED: S1: LED Panel 19W:1 66 19 1254 LED - Linear Tape LED: R1: LED Linear Lamp 15W:1 122 12 1464 Ski Lockers (Common Space Types: Locker Room, 946 sq.ft.) LED - Surface Mounted LED: S1: LED Panel 19W:1 17 19 323 3041Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheck-Web and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Interior Lighting PASSES Project Title: Data filename: 520 E COOPER UNIT C7&C9 CHANGE ORDER 12/12/18Report date: 51 ofPage Owner/Agent: Brandi Solberg Mission Peak Capital 1908 Main St Kansas City, Missouri 64108 646 742-7535 brandi.solberg@missionpeakcapital .com Designer/Contractor: Alison Agley Rowland + Broughton 234 E Hopkins Aspen, Colorado 81611 9702749796 alison.agley@rowlandbroughton.co m 02/01/2019 justinh Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version COMcheck-Web Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 520 E COOPER UNIT C7&C9 CHANGE ORDER 12/12/18Report date: 52 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable C405.2.4 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 520 E COOPER UNIT C7&C9 CHANGE ORDER 12/12/18Report date: 53 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 520 E COOPER UNIT C7&C9 CHANGE ORDER 12/12/18Report date: 54 ofPage Project Title: Data filename: 520 E COOPER UNIT C7&C9 CHANGE ORDER 12/12/18Report date: 55 ofPage