Loading...
HomeMy WebLinkAboutFile Documents.602 E Cooper Ave.0006.2018 (24).ACBKConstruction Management Plan 602 East Cooper Suite 202 1.0 General: Total Square Footage Interior Remodel 1700 SQ.Ft. 2.0 Project Introduction: 2.1Total Disturbance area is confined to Interior. 2.2 Project Vicinity Map attached. On Plan Cover sheet 2.3 Description of Work: Demo non structural interior partition walls. Install wood flooring. Install pre fab office partition walls. 3.0 Project Documentation: 3.1 Permit Types none have been issued thus far. Electrical, Mechanical, Etc. will be applied for as needed. 3.2 N/A 3.3 N/A. 3.4 Project sign N/A. 3.5 Owners Name: Burrell Group 505-690-8625 Contractor: Jim Iglehart Construction 970-379-5990. Site Supervisor: Jim Iglehart 970-379-5990. Safety Officer: Jim Iglehart 970-379-5990. 4.0 Project Implementation: 4.1 Dates of Construction: Upon issuance of Building permit. 4.2 Per the City guidelines as listed in the Construction Management Guidelines. 4.3 Construction Schedule: Anticipate 2 months of construction. 4.4 Project Fencing N/A. 4.5 Site Map N/A. 4.6 Parks: Not needed. 5.0 Project Management: 5.1 Parking Management not needed. 5.2 Emergency vehicle access Ordinance 35 N/A 5.3 Maps: N/A 01/18/2018 Minimal CMP submitted. All applicableregulations apply! Will be checked regularly in field for compliance. 5.4 6.0 Traffic Control: 6.2 Project Haul Routes: N/A 6.3 Weight and Size Limitations N/A. 6.4 Minor deliveries for carpet and office partition walls will happen periodically. No set schedule for this activity. 6.5 Traffic Control Plan: N/A. 8.0Sediment and erosion control: N/A. 9.0 Fugitive dust control: N/A. 10.0 Emissions: N/A. 11.0 Noise Suppression: N/A. 01/18/2018