Loading...
HomeMy WebLinkAboutFile Documents.520 E Durant Ave.0095.2017 (8).ACBK3 2.Approval of fabricator. Approval shall be based upon review of the fabricator’s written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3.Completion of fabrication. Upon completion of fabrication, the approved fabricator shall submit certificate of compliance to the building official stating that the work was performed in accordance with the approved construction documents. G.Building Department Responsibilities 1.Approve special-inspection program. The building department shall approve all special inspectors and special-inspection requirements. 2.Enforce special inspection. Work requiring special inspection and the building inspector shall monitor the performance of special inspectors. His\Her approval, in addition to that of the special inspector, must be obtained prior to placement of concrete, covering of structural steel, or other similar materials. 3.Review inspection reports. The building official should review special-inspection progress and final reports. 4.Perform final inspection. The building official should perform the final inspection and approval for a project [IBC Sec. 109.3.1] after the final special-inspection report has been reviewed and approved. Project Address: __________________________________ Permit Number:______________________ ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special Inspection Agency: __________________________ Owner: __________________________ Engineer/ Architect: __________________________ Contractor: __________________________ Approved Fabricator: __________________________ Inspected Fabricator: __________________________ (circle one) CITY OF ASPEN PITKIN COUNTY: Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Printed Name: __________________________ Printed Name __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Date: __________________________ Date __________________________ Date: __________________________ Date: __________________________ Date: __________________________ Date: __________________________ Date: __________________________ W. John Hufker, III The Libman Group 2017-10-27 2017-10-27 0009.2017.ACBK520 E. DURANT AVE. Aspen Insulation Chris Hutto, CET 2017-11-03Ground Engineering 0095.2017.ACBK