On what sheet is this shown? I
do not see where you have
clearly tied the building to the
property line.
Aspen Line Grade Verification Form.905 Chatfield Road.2018.04.pdf (2)
Subject: PlanCheck
Page Label: 1
Author: justinh
File Name: Aspen Line Grade Verification Form.905 Chatfield
Road.2018.04.pdf
This is not what is called out in
the site plan general notes or
civil plan, verify that all plan sets
consistently call out the same
equation and revise this form as
needed. I believe what you are
showing is FF of the existing
house.
Subject: PlanCheck
Page Label: 1 - COVER - COVER SHEET
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Submit a copy of your state
license to demolish. You may
resubmit other responses
without this document, but
building will not be able to fully
approve your permit until this
has been submitted.
PlanSet.Architecture.905ChatfieldRd.2018.04.pdf (20)
Subject: PlanCheck
Page Label: A-100.1 - SITE PLAN -EXISTING & PROPOSED
GRADE
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Show utility meters on the
elevations.
Subject: PlanCheck
Page Label: A-101 - SNOWMELT PLAN
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Civil plans references
snowmelted pavers, are these
intended to be pervious pavers?
If so, provide a detail showing a
compliant perforation pattern
that maintains the R10 insulation
value. Please see the attached
snowmelt perforation calculator
for assistance in designing a
compliant hole pattern.
On what sheet is this
shown? I do not see
where you have
clearly tied the
building to the
property line.
This is not what is
called out in the site
plan general notes or
civil plan, verify that all
plan sets consistently
call out the same
equation and revise
this form as needed.
I believe what you are
showing is FF of the
existing house.
Submit a copy of your state license to demolish. You may
resubmit other responses without this document, but building will
not be able to fully approve your permit until this has been
submitted.SIDE YARDPROPERTY LINE
SETBACK
RE: LANDSCAPE
10'-0"UTILITY METER
LOCATIONS, RE: CIVIL
Show utility meters on
the elevations.
LIVING
TERRACE
DN
DN
EXISTI
TUB &
TO BE
REAR YARD
PROPERTY LINE10'-0"
Civil plans references
snowmelted pavers,
are these intended to
be pervious pavers? If
so, provide a detail
showing a compliant
perforation pattern that
maintains the R10
insulation value.
Please see the
attached snowmelt
perforation calculator
for assistance in
designing a compliant
hole pattern.
Revised, refer to revised sheet A-100.1
Revised, refer to sheet A-201 & A-202
Exterior pavers throughout are not pervious.
Revised, refer to
Aspen Line Grade Verification Form-Rev20180911.pdf
12/03/2018
Comment still
outstanding, building
cannot fully approve
this permit until state
demo license is
submitted.
Subject: PlanCheck
Page Label: A-101 - SNOWMELT PLAN
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Snowmelt in the ROW must be
on a separate zone, please
revise the mechanical plan to
show this and note it on the
architectural snowmelt plan as
well.
Subject: PlanCheck
Page Label: A-113 - OVERALL ROOF PLAN
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
REMP worksheet does not
indicate any solar being used to
mitigate the snowmelt REMP
fee. If you wish to mitigate that
fee with solar on this permit
provide the full solar submittal
and amend the REMP
worksheet and fill out the PV
worksheet tab. You can always
submit this documentation later
with a stand alone solar
submittal and receive a REMP
fee refund (less $750
administrative fee).
Subject: PlanCheck
Page Label: A-113 - OVERALL ROOF PLAN
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Is water able to flow over the
edge of this lower porch roof if
the rain chain drain fails? If not,
provide compliant secondary
drainage.
Subject: PlanCheck
Page Label: A-202 - EXTERIOR ELEVATIONS
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Dimension opening size to show
compliance with IRC 312.1.3.
Subject: PlanCheck
Page Label: A-202 - EXTERIOR ELEVATIONS
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Provide a cutsheet on the glass
guard system that shows
compliance with IRC 301.5 and
compliance with the City's
amendment that requires either
laminate or a top cap.
DN
DN
RETAINING WALL,
RE: LANDSCAPE
FRONT YARD PROPERTY LI
NE25'-0"
ENTRY WALKWAY
SNOWMELT CALCULATIONS
Snowmelt in the ROW
must be on a separate
zone, please revise
the mechanical plan to
show this and note it
on the architectural
snowmelt plan as well.
A-205
1
1A-302
1A-300
A-203
1 1/4" /12"1/4" /12"1/4" /12"
A
A
V1
X1
3/4" / 12"3/4" / 12"V2
1A-305
B22'-6 3/4"1/4" /12"1/4" /12
RD
RD
RD RD
RD
RD
RD
----
LOWER PORCH ROOF 168.00°192.00°
SUNSHADE BELOW
STONE PANEL WALL WITH CAPSTONE
3/4" / 12"
OVERFL
OVERFLOW SCUPPER
8.51 KW PHOTOVOLTAIC SYSTEM.TO BE DESIGN/BUILD RE: CONTRACTOR
A-204 1 1/4" /12"19'-0 1/2"REMP worksheet does not indicate any solarbeing used to mitigate the snowmelt REMP fee. If you wish to mitigate that fee with solar on thispermit provide the full solar submittal andamend the REMP worksheet and fill out the PVworksheet tab. You can always submit thisdocumentation later with a stand alone solarsubmittal and receive a REMP fee refund (less$750 administrative fee).
1
A-301
A-2001
1/4" /12"
1
A-3041/4" /12"RD
RD
-
---
LOWER PORCH ROOF
168.00°STONE PANEL WALL
WITH CAPSTONE
165.00°RAIN CHAIN BELOW
OVERFLOW SCUPPER
Is water able to flow
over the edge of this
lower porch roof if the
rain chain drain fails?
If not, provide
compliant secondary
drainage.
O
W V
3'-0"Dimension opening
size to show
compliance with IRC
312.1.3.
Y X
P
R
Z
T
W
PLANTER 3'-0"3'-6"Provide a cutsheet on
the glass guardsystem that showscompliance with IRC
301.5 and compliance
with the City'samendment thatrequires eitherlaminate or a top cap.
Revised. A dedicated loop is placed in the ROW.
Refer to sheet A-101 & 17085-M001-081718.pdf
Revised. Overflow scupper incorporated.
Refer to sheet A-113.
Revised, refer to sheet A-202.
Revised to typical steel guardrail assembly.
Refer to sheet A-202.
An estimated 6 kW of solar PV will offset the
snowmelt. GC and solar contractor to coordinate
prior to re-submitting REMP calc.
Refer to 17085-REMP Calc.xlsx
12/03/2018
Subject: PlanCheck
Page Label: A-205 - EXTERIOR ELEVATIONS
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Your elevations and roof plan
should be showing all venting
terminations. Fireplace
terminations are not shown, O.A.
and exhaust venting shown on
the mechanical plan are not
shown. Revise all applicable
plans to consistently show
venting.
Subject: PlanCheck
Page Label: A-305 - BUILDING SECTIONS
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
This wall type is not accounted
for in the ResCheck properly,
this should be a mass wall which
does not appear on the report.
Please revise the ResCheck
accordingly or clarify where your
thermal envelope is in this
location.
Subject: PlanCheck
Page Label: A-320 - WALL SECTIONS
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Clearly indicate how you will
accomplish the air sealing
requirements of 2015 IECC table
R402.4.1.1. Indicate the
continuity of the air barrier and
where it is located throughout
the building. Note locations that
require caulking, sealing, taping,
etc at transitions between
different materials (such as wall
to foundation, wall to roof, etc).
The better detail provided the
easier it will be for the contractor
and inspector to be successful.
These details are a new 2015
code requirement now that
visual inspection of the air
barrier is required in lieu of a
blower door test. See the
attached examples of air sealing
details. You may use any
method or combination of
methods to accomplish this
requirement but the continuous
air barrier must be clearly
identified. See the attached
example sections and details for
an example of the level of detail
we are looking for.
Your elevations and roof plan should be showing all
venting terminations. Fireplace terminations are not
shown, O.A. and exhaust venting shown on the
mechanical plan are not shown. Revise all applicable
plans to consistently show venting.
F4
W10 10'-6 5/8"12'-0"R2
This wall type is not
accounted for in the
ResCheck properly,
this should be a mass
wall which does not
appear on the report.
Please revise the
ResCheck accordingly
or clarify where your
thermal envelope is in
this location.
R2
5
Clearly indicate how you will accomplish the air sealing
requirements of 2015 IECC table R402.4.1.1. Indicate the
continuity of the air barrier and where it is located throughout
the building. Note locations that require caulking, sealing,
taping, etc at transitions between different materials (such as
wall to foundation, wall to roof, etc). The better detail
provided the easier it will be for the contractor and inspector
to be successful. These details are a new 2015 code
requirement now that visual inspection of the air barrier is
required in lieu of a blower door test. See the attached
examples of air sealing details. You may use any method or
combination of methods to accomplish this requirement but
the continuous air barrier must be clearly identified. See the
attached example sections and details for an example of the
level of detail we are looking for.
Revised, refer to sheets A-113 & A-200 through A-205
Revised, refer to sheets A-576 for
City of Aspen typical air sealing
instruction. Refer also updated
detail sheets A-520, A-540, A-550.
Revised, refer to updated REScheck Report for the
108sf above ground concrete wall, R-10
continuous insulation.
12/03/2018
There was no sheet
A-576 in the submittal,
please submit that
sheet.
Subject: PlanCheck
Page Label: A-601 - WINDOW SCHEDULE
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Per your ResCheck all windows
must be .32 U value or better,
please revise you note.
Subject: PlanCheck
Page Label: A-601 - WINDOW SCHEDULE
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Window II (egress window for
bedroom 2 is not shown on the
schedule), please revise.
Subject: PlanCheck
Page Label: A-601 - WINDOW SCHEDULE
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Reference your window tags on
the floor plans similar to what
has been done with the doors.
Subject: PlanCheck
Page Label: A-602 - WINDOW SCHEDULE
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Multiple windows shown here
are not shown on the floor plan,
please revise the floor plan to be
consistant with what is shown
here.
Subject: PlanCheck
Page Label: L3.00 - 0'4'8' Materials Plan (Hardcape)
Author: justinh
File Name: PlanSet.Landscape.905ChatfieldRd.2018.04.pdf
Provide cutsheets on all
proposed outdoor fire features
that show they are listed for
outdoor use.
PlanSet.Landscape.905ChatfieldRd.2018.04.pdf (2)
UPPER LEVEL110'-6 5/8"
WINDOW GENERAL NOTES:1. THIS PROJECT SHALL ADHERE TO THE IECC 2015 TABLE 402.1.2 FDLOR INSULATION
AND
FENESTRATION REQUIREMENTS FOR CLIMATE ZONE 7.
2. WINDOWS TO BE DELIVERED W/ NRFC STICKERS (U-VALUE = 0.34 OR LOWER).
3. GENERAL CONTRACTOR TO PROVIDE SAFETY GLAZING IN ALL LOCATIONS AS
REQUIRED BY SECTION R308.4 OF THE 2015 IRC.
4. RE: DOOR SCHEDULE FOR ALL GLASS LIFT AND SLIDE DOORS.
5. SCREENS TO BE INSTALLED AT ALL OPERABLE WINDOWS.
6. ALL DIMENSIONS PROVIDED ARE TO ROUGH OPENINGS UNLESS NOTED OTHERWISE.
7. "E" = EGRESS
8. "SG" = SAFETY GLAZING
Per your ResCheck all windows
must be .32 U value or better,please revise you note.
Window II (egress window for
bedroom 2 is not shown on
the schedule), please revise.
WINDOW SCHEDULE - (FRAME DIMENSIONS)
Mark Level Width Height Comment
A MAIN LEVEL 5'-7 1/4" 10'-0" SAFETY GLAZIN
B MAIN LEVEL 1'-4" 7'-0"
C MAIN LEVEL 1'-4" 9'-2 1/4" SAFETY GLAZIN
D MAIN LEVEL 1'-4" 3'-2 7/8"
E MAIN LEVEL 15'-5 9/128" 9'-2 1/4" SAFETY GLAZIN
F MAIN LEVEL 11'-10" 9'-2 1/4" SAFETY GLAZIN
Reference your window tags on the floor plans similar to what
has been done with the doors.NER WINDOWNER WINDOWNER WINDOWNER WINDOWMAIN LEVEL100'-0"CORNER WINDOWLL8'-0"2'-0"R.O.12'-0"4'-7 3/4"2'-0"SGSG
1'-8"
R.O.
6'-3 3/4"
.
"10'-0"R.O.2'-0 3/4"EQ
WINDOW AT 165° BENDHH R.O.2'-0"6'-0"EEJJ
EQEQ
R.O.
4'-0"4'-4"3'-8"8'-0"EQEQ
R.O.
7'-6"
R.O.
4'-0"R.O.2'-0"4'-4"3'-8"R.O.
4'-10 3/4"
II
SSKKWINDOW AT 165° BENDR.O.
7'-6"
GG
R.O.
2'-11 7/8"R.O.2'-0"WINDOW G
1. THIS PROJ
AND FENESTRA 2. WINDOWS 3. GENERAL
REQUIRED
4. RE: DOOR 5. SCREENS 6. ALL DIMEN 7. "E" = EGR
8. "SG" = SA
1/4" = 1'-0"
LIVING NORTH - LL 11 1/4" = 1'-0"
KITCH. / DINING NORTH - MM 12
1/4" = 1'-0"
BEDROOM 2 - II & HH 9 1/4" = 1'-0"
BEDROOM 3 - KK & JJ 10 1/4" = 1'-0"
BATH 1 - GG 8
Multiple windowsshown here are notshown on the floor
plan, please revise the
floor plan to be
consistant with what is
shown here.
LIVING T
E
R
R
A
C
E
CENTRA
L
G
A
R
D
E
N
GREAT LAWN MASTERTERRACEFIRE
FIRE
BBQDINING
CH
STEEL RETAINING LOW05
L7.01
STEEL RETAINING WALL 06
L7.01
STEEL RETAINING LOW 05
L7.01
OUTDOORKITCHEN; RE ARCH
STEP
STEP
STEP
STEP
STEP
STEP
STEPSTEPSEAT WALL; ~20" TALL;RE STRL
07
L7.01
1'-4"CUSTOM GAS FIREFEATURE; STEEL
SURROUND SET IN GRADE
GAS FIRE
FEATURE
INFORMAL CONCRETE
STEPS IN SLOPE
08
L7.01
07
L7.01
STEEL RETAINING WALL 06
L7.01
LANDSCAPE EDGE, TYP06
L7.00
GUARDRAIL;RE ARCH
Provide cutsheets onall proposed outdoorfire features that showthey are listed for
outdoor use.
Revised, refer to sheets A-601 & A-602.
Revised, refer to sheet A-601 window schedule.
Revised, refer to enlarged 1/4" floor plans
sheets A-120, A-121, A-122, A-123
Revised, refer to sheets
A-120, A-121, A-122, A-123
Revised, refer to 7/L7.01 for all weather outdoor
rated and certified fire feature ignition system.
Fire features are cusom and not
pre-manufactured; see Detail 01,02/l7.02.
12/03/2018
Subject: PlanCheck
Page Label: A-420 - LIVING FIREPLACE ENLARGED
PLANS/ELEVATION
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Provide the full installation
instructions for both the gas log
fireplace and the direct vent
appliance, what you have
submitted is not the full
installation instructions for either
unit. Your details must show
that you either meet the specific
requirements for that unit or the
requirements of IRC
1001.9-1001.10. Your details
also need to show or note that
the damper will be permanently
open and a flue sentinel will be
installed given the absence of
tight fitting sealed doors.
Subject: PlanCheck
Page Label: A-500 - TYP. FLOOR/ROOF ASSEMBLIES
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
For all class A assemblies call
out the specific
components/materials that will
achieve a class A rating per the
ESR you submitted, the ESR
report list multiple options that
obtain class A and your details
need to match one of them.
Subject: PlanCheck
Page Label: A-500 - TYP. FLOOR/ROOF ASSEMBLIES
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Provide documentation of class
A rating for this roof assembly,
the ESR submitted does not
include any of these items.
Subject: PlanCheck
Page Label: A-501 - TYP. WALL ASSEMBLIES
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
This assembly is not accounted
for in the ResCheck. It defines
the a portion of the thermal
envelope between the
laundry/mechanical rooms and
the crawl space. Revise
ResCheck to include this.
Subject: PlanCheck
Page Label: A-600 - DOOR SCHEDULE
Author: justinh
File Name: PlanSet.Architecture.905ChatfieldRd.2018.04.pdf
Please also note the required U
value for solid exterior doors per
your ResCheck (.30 max)2'-8"STANDING SEAM ROOF
R2 - ROOF
FIR
Provide the full installation instructions for both the gas log
fireplace and the direct vent appliance, what you have
submitted is not the full installation instructions for either
unit. Your details must show that you either meet the
specific requirements for that unit or the requirements of
IRC 1001.9-1001.10. Your details also need to show or
note that the damper will be permanently open and a flue
sentinel will be installed given the absence of tight fitting
sealed doors.
RE: ROOF PLAN
SLOPE
INT
EXT
FRAMING RE: STRUCT. (TYP
7 1/2" MIN. CLOSED CELL SPRA INSULATION (R-49), FILL ALL FRA VOIDS, COMPLETELY ENCAPSU STEEL FRAMING
RE: ROOF PLAN
SLOPE
EXT
EXT
FRAMING RE: STRUCT. (TYP.)
ASSUME EXT. SOFFIT IS IN PLANE WITH INTERIOR CEILING, RE: SPEC. MIN.7 1/2"NG RE: STRUCT. (TYP.)
2" MIN. RIGID INSULATION (
5/8" PLYWOOD SHEATHING STRUCT.
CEILING FINISH VARIES, RE: RCP & ROOM FINISH SCHEDULE
1/2" PLYWOOD SHEATHING, O BACKER BOARD AT WET LOCA
1/2" PLYWOOD SHEATHING, OR BACKER BOARD AT WET LOCATIONS
CEILING FINISH VARIES, RE: RCP'S & ROOM FINISH SCHEDULE
2" MIN. RIGID INSULATION (R-10)
SINGLE PLY MEMBRANE ROOF WITH APPLIED SEAMS. CLASS 'A' ROOF ASSEMBLY –MINIMUM 1/4" NON-COMBUSTIBLE GLASS MAT SHEATHING / PROTECTION BOARD - PER ESR 1157
5/8" PLYWOOD SHEATHING, RE: STRUCT.
ASSUME EXT. SOFFIT IS IN PLAN WITH INTERIOR CEILING, RE: SP
LOPED RIGID INSULATION TEGRAL GUTTER, RE: ROOF
LYWOOD SHEATHING, RE: CT.
ME EXT. SOFFIT IS IN PLANE NTERIOR CEILING, RE: SPEC.
LYWOOD SHEATHING, OR ER BOARD AT WET LOCATIONS
NG FINISH VARIES, RE: RCP'S OM FINISH SCHEDULE
ONE BALLAST, RE: SPEC FOR R
SINGLE PLY MEMBRANE ROO APPLIED SEAMS. CLASS 'A' R ASSEMBLY –MINIMUM 1/4" N COMBUSTIBLE GLASS MAT S PROTECTION BOARD - PER
E PLY MEMBRANE ROOF WITH ED SEAMS. CLASS 'A' ROOF MBLY –MINIMUM 1/4" NON-BUSTIBLE GLASS MAT SHEATHING /
ECTION BOARD - PER ESR 1157
For all class A assemblies callout the specificcomponents/materials that willachieve a class A rating per the
ESR you submitted, the ESRreport list multiple options that
obtain class A and your detailsneed to match one of them.
.)
Y FOAM MING
LATE ALL
EXT
7 1/2" MIN. CLOSED CELL SPRAY FOAM INSULATION (R-49), FILL ALL
FRAMING VOIDS, COMPLETELY ENCAPSULATE ALL STEEL FRAMING 7 1/2"RE: ROOF PLAN
SLOPE
2" MIN. RIGID INSULATION (R-10)
T.O. SHEATHING
RE: STRUCT.
MINIMUM 1/4" NON-COMBUSTIBLE GLASS MAT SHEATHING / PROTECTION
BOARD
5/8" PLYWOOD SHEATHING, RE:
STRUCT.
-10)
RE:
OF WITH OOF
ON-HEATHING /
ESR 1157
HYDROTECH - MONOLITHIC
MEMBRANE 6125
HYDROTECH - HYDROFLEX
HYDROTECH - HYDROGUARD
PAVER
OR APPROVED ALTERNATE
Provide
documentation of
class A rating for this
roof assembly, the
ESR submitted does
not include any of
these items.
F.O.S.
EXT
INT
FOUNDATION WATERPROOFMEMBRANE
REIN. CONCRETE WALL,RE: STRUCTURAL
2" RIGID INSULATION (R-10)
EXT
1/2" DRAINAGE MAT
BACKFILL PER SOIL REPORT
RE: STRUCT.RE: S
W5 TYP.
1 1/2"
INT
CRAWLSPACE
CRAWLSPACE
AT W2B:FOUNDATION WALL LOCATED AT
INTERIOR SPACE
W6 TYP. EXT. 2X WALL STUCCO
1 1/2" = 1'-0"
TOTAL INSULATION R-VALUE = R-40
1/2"
G
AL
R-14), 1/2" FRAMING GAP BETWEEN
FOUNDATION WALL AND FRAMING
2X4 FURRING WALL RE: STRUCTURAL
W/ BLOWN IN BATT INSULATION (R-14),
FILL FRAMING GAP
INTERIOR WALL FINISH VARIES,
RE: ROOM FINISH SCHEDULE
RE: PLANS
INT
D
PROVIDE SELF-ADHERED
WATERPROOF MEMBRANE WITHIN 3'-0" OF FINISH GRADE
LATH
NOTE: W6B = PROVIDE 2X4 FURRING WALL W/ BLOWN IN BATT INSULATION (R-14)
This assembly is not accounted for in the
ResCheck. It defines the a portion of the
thermal envelope between the
laundry/mechanical rooms and the crawl
space. Revise ResCheck to include this.
GENERAL NOTES:
1. ALL GLASS AT DOORS TO HAVE SAFETY GLASS
2. GLASS DOORS BY WDW. MFR. TO BE DELIVERED W/ NRFC STICKERS
(U-VALUE = 0.32 OR LOWER).
Please also note the
required U value for
solid exterior doors
per your ResCheck
(.30 max)
Revised, refer to sheet A-560 & updated REScheck.
Revised, refer to A-420 & A-421
Refer to fireplace installation manuals:
Montigo Fireplace Installation:
905 Chatfield RD C620PRC OPEN prelim.pdf
Ortal Fireplace Installation:
Ortal - Installation Manual - USA.pdf
Revised, refer to updated REScheck Report for the
95sf of below grade crawlspace concrete wall,
R-14 cavity insulation only.
Refer to American Hydrotech Hydroguard UL Class A - RESPONSE.pdf
for Hydrotech-Hydroguard Paver Class A listing.
Refer to revised
2018.10.03.0111-2018-ARBK_BuildingComment_Res
ponse.pdf for TPO membrane roof ERS Class A
assembly identification.
12/03/2018
Subject: PlanCheck
Page Label: L7.01 - Details
Author: justinh
File Name: PlanSet.Landscape.905ChatfieldRd.2018.04.pdf
No structural plan is provided for
the steel retaining walls, provide
that plan. All retaining walls
require structural plans for
inspection purposes.
Subject: PlanCheck
Page Label: LIGHT0.1 - NOTES & LEGENDS
Author: justinh
File Name: PlanSet.Lighting.905ChatfieldRd.2018.04.pdf
Provide interior lighting plans,
only exterior lighting is currently
shown. Note the requirements
that a minimum of 75% of
permanent lighting shall be high
efficacy and that all recessed
lighting installed in the building
thermal envelope shall be IC
rated and air sealed.
PlanSet.Lighting.905ChatfieldRd.2018.04.pdf (1)
Subject: PlanCheck
Page Label: E.0.001 - SINGLE LINE, CALCS
Author: justinh
File Name: PlanSet.Mechanical.905ChatfieldRd.2018.04.pdf
Show electrical panel location on
the floor plans so that we can
verify the panel's required clear
space per 2014 NEC 110.26.
PlanSet.Mechanical.905ChatfieldRd.2018.04.pdf (7)
Subject: PlanCheck
Page Label: M100 - MECHANICALSCHEDULES
Author: justinh
File Name: PlanSet.Mechanical.905ChatfieldRd.2018.04.pdf
Please explain how this
ventilation system meets our
balanced ventilation
requirement. Per COA
amendments supply and
exhaust shall be balanced within
20% of each other. Please
clarify how you are meeting this.
Subject: PlanCheck
Page Label: M201 - LOWER LEVEL MECHANICAL
PLANNORTH
Author: justinh
File Name: PlanSet.Mechanical.905ChatfieldRd.2018.04.pdf
Provide a cutsheet on the dryer
booster fan than demonstrates
this is a compliant installation.
KEY1CA 2 PA 3 M
4 G BE 5 W 6 G 7 CL 8 SC EN 9 RI AR 10 SN
NOTEA.CONTRACTOR SHALL PROVIDE A MOCKUP FORLANDSCAPE ARCHITECT AND OWNER APPROVALPRIOR TO CONSTRUCTION.B.RE ARCH WHERE CONCRETE FLATWORK MEETS ARCH.C.INSTALL PAVER PER MFR SPECIFICATION WITHSPECIAL CARE TO THE HIGH ALPINE ENVIRONMENT.D.ALIGN INTERIOR AND EXTERIOR PAVER JOINTPATTERN.D.CONTRACTOR SHALL REFER TO GEOTECH REPORTFOR STRUCTURAL FILL AND OTHER RQMTS. SUBASEAND BASE COURSE PREPARATION AND INSTALLATIONSHALL BE OBSERVED AND TESTED BY GEOTECH.D.RE CIVIL FOR GRADES, ELEVATIONS, SLOPES,
NOTEA.THIS DETAIL IS DIAGRAMMATIC; RE MFRINSTALLATION SPECIFICATIONS FOR PAVER ANDEDGE RESTRAINT INSTALLATION.B.ADJACENT MATERIALS VARY; SEE PLANC.RE CIVIL FOR GRADES, ELEVATIONS, SLOPES,DRAINAGE AND BASE COURSES.
K 123
45 678
PAVER OVER SAND WITH PLANTED JOINT
1"=1'-0"
03
L7.011" MAX4"1 2 3 4 5 6 7 8
3.5"
PR PA FIN TB
ED
AL OR
NOTEA.THIS DTL IS DIAGRAMMATIC; RE STRL FORFINAL WALL AND FOOTER DESIGN.B.CONTRACTOR SHALL PROVIDE A MOCKUPFOR LANDSCAPE ARCHITECT AND OWNERAPPROVAL PRIOR TO PROCUREMENT ANDCONSTRUCTION.C.RE PLAN FOR LAYOUT AND CIVIL FOR SPOTELEVATIONS.D.ADJACENT MATERIALS MAY VARY; RE PLAN.E.CONTRACTOR SHALL REFER TO GEOTECHREPORT FOR STRUCTURAL FILL AND OTHERRQMTS. SUBASE AND BASE COURSEPREPARATION AND INSTALLATION SHALL BEOBSERVED AND TESTED BY GEOTECH.F.ATTACH WALLS TO ARCH FOUNDATIONS; RESTRL.G.STRL DWGS AND STEEL SHOPS SHALL BEPROVIDED BY THE CONTRACTOR.
KEY1STEEL RETAINING WALL PANEL; 3/4" THK.2 2X2 POST EMBEDDED IN CONCRETE FOOTER;REAR WELD WALL TO POST; RE STRL3CONCRETE PIER FOOTER; RE STRL.4 DRAINAGE; RE CIVIL.5 WATERPROOFING.6 FREE DRAINING AGGREGATE.7 GEOTEXTILE FILTER FABRIC.8 PLANT MIX.9 COMPACTED FILL; RE GEOTECH.10 SCARIFY AND COMPACT UNDISTURBEDSUBGRADE PER GEOTECH.
STEEL RETAINING WALL (DIAGRAMMATIC; RE STRL)
3/4"=1'-0"
06
L7.01 RE CIVIL6"1
2
34
567
8
9
10
9
8
DEPTH PER STRLNOTEA.CONTRACTOR SHALL PROVIDE A MOCKUP FORLANDSCAPE ARCHITECT AND OWNER APPROVALPRIOR TO PROCUREMENT AND CONSTRUCTION.B.RE PLAN FOR LAYOUT AND CIVIL FOR ELEVATIONS.C.ADJACENT MATERIALS MAY VARY; RE PLAN.D.CONTRACTOR SHALL REFER TO GEOTECHREPORT FOR STRUCTURAL FILL AND OTHER
RQMTS. SUBASE AND BASE COURSEPREPARATION AND INSTALLATION SHALL BE
PLAN
74
No structural plan isprovided for the steel
retaining walls,provide that plan. Allretaining walls require
structural plans forinspection purposes.
Provide interior lighting plans, only exterior lighting is currently shown. Note
the requirements that a minimum of 75% of permanent lighting shall be high
efficacy and that all recessed lighting installed in the building thermal envelope
shall be IC rated and air sealed.
Show electrical panel location on the floor plans so that we can verify the
panel's required clear space per 2014 NEC 110.26.
Please explain how this ventilation system meets our balanced ventilation
requirement. Per COA amendments supply and exhaust shall be balanced
within 20% of each other. Please clarify how you are meeting this.
Provide a cutsheet on
the dryer booster fan
than demonstrates this
is a compliant
installation.
Revised, refer to
Plan.Set.Lighting.905ChatfieldRd.2018.04.pdf for interior
lighting plans, sheet L0.1 for IECC Lighting Efficacy Table
& 2018.09.25_Silverstein_Permit_LSG Specs.pdf
Revised, refer to sheet 7/S-200 at
181004 Silverstein Permit Response.pdf
Revised, refer to sheet 17085-M202.pdf
Revised, refer to sheet 17085-M100.pdf.
180 CFM ERV is provided. An ERV exhausts
and supplies the same amount of airflow.
Refer to Dryer Booster Fan.pdf, cutsheet.
The UL Listing appears in the model name.
12/03/2018
Subject: PlanCheck
Page Label: M201 - LOWER LEVEL MECHANICAL
PLANNORTH
Author: justinh
File Name: PlanSet.Mechanical.905ChatfieldRd.2018.04.pdf
Not showing any bathroom
ventilation on this level, please
revise.
Subject: PlanCheck
Page Label: M202 - MAIN LEVEL MECHANICAL
PLANNORTH
Author: justinh
File Name: PlanSet.Mechanical.905ChatfieldRd.2018.04.pdf
Identify the cfm of the kitchen
exhaust and provide compliant
make-up air if applicable per
IMC 505.2.
Subject: PlanCheck
Page Label: M300 - MECHANICALSCHEMATICS
Author: justinh
File Name: PlanSet.Mechanical.905ChatfieldRd.2018.04.pdf
Please identify this as R10 min
insulation.
Subject: PlanCheck
Page Label: M401 - SEQUENCEOF OPERATION
Author: justinh
File Name: PlanSet.Mechanical.905ChatfieldRd.2018.04.pdf
Please specify the minimum
percentage that this will run at
continuously in order to maintain
the required 77cfm of continuous
balanced ventilation.
Subject: PlanCheck
Page Label: S-001 - GENERAL NOTES
Author: justinh
File Name: PlanSet.Structural.905ChatfieldRd.2018.04.pdf
A soils report verifying these
assumptions is a required
deferred submittal and must be
submitted once the testing has
taken place.
PlanSet.Structural.905ChatfieldRd.2018.04.pdf (1)
Not showing any bathroom ventilation on this level, please
revise.
Identify the cfm of the
kitchen exhaust and
provide compliant
make-up air if
applicable per IMC
505.2.
Please identify this as
R10 min insulation.
pump, kitchen make-up air,
FWLRQV7KHUPRVWDWVVKDOOostats will control radiant
chanical contractor and
to maintain heating water
)WR)#)RUDV
J
ZDWHUKHDWHUSXPSVKDOO
ZDWHUKHDWHUSXPSVKDOO
ed entirely during"Away"
r at MV-1 motorized mixing
upply setpoint at)#)WR)#
g water return pipe locatedng (see "Pumps" sequence
e applicable.
nabled. Condensing unithall be furnished with soft
return pipe in thewill already be operatingond stage of heat.
dulating bypass damper,mand. Bypass damper shalln supply air duct and shall
ntractor during TAB. Initialpen position, bypass
nabled. Condensing unit
shall start, and boiler shall be enabled. Tekmar control shall cycle P-7 to maintain snowmelt water supply setpoint
at TS-6WHPSHUDWXUHVHQVRU6HWSRLQWVKDOOEH)DGMd.Provide a 12-hour timer switch in the mechanical room for manual override, one per zone.e.7HNPDUV\VWHPVKDOOEHVHWXSIRU::6'ZDUPZHDWKHUVKXWGRZQDWDSSUR[LPDWHO\)DGM6\VWHPVKDOO
not operate if outdoor temperature is above this setting.
f.7HNPDUV\VWHPVKDOOEHVHWXSIRU&:&2FROGZHDWKHUFXWRXWDWDSSUR[LPDWHO\)DGM6\VWHPVKDOOQRWoperate if outdoor temperature is below this setting.
12.Fansa.DBF-1 dryer booster fan shall be controlled by an integral pressure sensing switch which recognizes dryer
operation and activates booster fan from an independent electrical circuit. The integral delay-on-make timer in theswitch will cycle the fan on for intervals of 10 minutes. This will continue until the dryer has stopped and the timerdelay period has lapsed.
b.EF-1 bath exhaust fans shall each be controlled by an on/off wall switch.c.EF-2 garage exhaust fan shall be energized via a motion sensor in the garage ceiling. Once energized, fan shall runfor 30 minutes (adj) as set by adjustable timer. Any trigger of the motion sensor during the timed run period shall
reset the timer.d.EF-3 crawlspace exhaust fan shall be controlled by a dehumidistat.e.EF-4 crawlspace exhaust fan shall be controlled by a dehumidistat.
f.SF-1 supply fan shall be controlled by a line voltage cooling thermostat.g.RF-1 radon fan (if installed), shall run continuously 24/7. Provide a dedicated on/off wall switch.
13.ERV-1 Energy Recovery Ventilator & EDH-1 Electric Duct Heatera.ERV-1 shall be controlled by a percent timer control (Renewaire PT Percent Timer Control, or via homeautomation system) which shall control percent of unit operation per hour (adjustable from 0 to 100%). Control
shall be located in the mech room. Set to run continuously during occupied periods.b.ERV-1 shall also be controlled by (3) push button controls (Renewaire PB-L Push Button Point-of-use ControlLighted, or via home automation system). Press button once for 20 minutes of timed ventilation operation, twice
for 40 minutes, and three times for 60 minutes. Press and hold button for about five seconds to cancel ventilationcycle. Refer to sheet M001 for locations.c.Wire percent timer and push button controls in parallel.
d.ERV-1 is tied into FC-1 fan coil, however no interlocks are required. Fan coil does not need to run for ERV to befully effective.e.EDH-1 shall be located at ERV-1 fresh air supply duct.
f.('+VKDOOEHFRQWUROOHGE\DVLQJOHSKDVH6&5FRQWURO6&5FRQWUROVKDOOPRGXODWHFRLOWRPDLQWDLQ)DGMdischarge air temperature.
14.Steam Humidifiersa.Provide (1) Nortec outdoor temperature sensor and (1) Nortec digital humidistat controller with remote transducerfor each humidifier.
b.Upon a call for humidification from room mounted humidity transducer, associated fan shall start and once airflowis proven by air proving switch, humidifier shall start. Humidifier shall cycle to maintain humidity setpoint.c.Include a high limit duct humidistat located in the supply air duct, downstream of the steam absorption zone to
disable humidifier if levels are too high.d.Digital humidistat controller shall automatically reset the humidity setpoint based on outdoor temperature.Outdoor reset curve shall be adjustable.
e.Humidification shall be disabled during calls for cooling and make-up air.f.Integral controls shall automatically temper hot drain water by mixing cold domestic water to comply with code.
15.Steam Generatora.Steam generator shall be controlled by Mr. Steam controls.
16.Pumpsa.P-1 B-1 boiler pump: on whenever boiler is called to fire.
b.P-2 B-2 boiler pump: on whenever boiler is called to fire.c.P-3 WH-1 water heater pump: on upon a call for DHW heating from TS-2 temperature sensor.d.P-4 WH-2 water heater pump: on upon a call for DHW heating from TS-3 temperature sensor.
e.P-5 FC-2 fan coil pump: on during a call for make-up air and when not shutdown by WWSD (warm weather shut
4/19/18
Please specify theminimum percentage
that this will run atcontinuously in orderto maintain the
required 77cfm ofcontinuous balancedventilation.
16.1 K UltimateEast/West
16.1 K UltimateNorth/South
Snow Loading
100 PSFGround Snow Load, Pg
70 PSFMinimum Flat Roof Snow Load, Pf
1.0Importance Factor, Is
BTerrain Category
1.0Exposure Factor, Ce
1.0Thermal Factor, Ct
1.0Slope Factor, Cs
Live Loads and Superimposed Dead Loads
Foundations
40 PSF/FTActive Equivalent Fluid Pressure
50 PSF/FTAt-Rest Equivalent Fluid Pressure
450 PSF/FTPassive Equivalent Fluid Pressure
0.50Sliding Friction Coefficient
3000 PSFAllowable Bearing Capacity
42 INMinimum Frost Depth
(Notes 2,3,4)
(Notes 4,5)
Geotechnical Engineer Information: Steven Pawlak #15222
H-P KUMAR
5020 County Road 154
Glenwood Springs, CO 81601
(970) 945-7988
Date of Report: 12/26/2017
S-300Foundation Schedule Located on:
NOTES:
1. The governing building code defines the applicable edition of referenced
codes and standards. Where governing building code does not define
referenced codes and standards, the latest edition shall be used. 2. Minimum flat roof snow load according to City of Aspen Building Department.
3. All snow loads on the structure for both flat and sloped roofs are
calculated in accordance with the 2015 IBC and based on the ground
snow load stated above. Roof snow loads consider the following load conditions: partial loading and snow drifting4. Minimum uniform and concentrated live loads as well as partition loads
and applicable live load reductions are determined according to Section
1607 of the IBC
5. See Load Keys for numerical definition and area designation of snow, live,
and other gravity loads used in design
uding
s and suppliers.
Contractor of his
he Contract
ear the cost of
d requirements.
itect. The cost of
ve work shall be
pecial inspections
d the local
329 and upon
ertificate of
eing special
be registered and
nspection of soils
ing the discipline
nical Engineer in
he Geotechnical
ls, earthwork and
and the
ral notes.
required testing
uired by the local
uments. See
the start of work
nspector
testing agency.
place inspection
hown in the
have both sides filled simultaneously to maintain a comm
5. Brace all foundation walls against movement while back
slabs at the top and bottom of the wall are in place. Brac
walls as necessary to prevent movement and overstress
loading regardless of sequencing of top and bottom floo
6. Contractor shall provide continuous site drainage by a m
to control surface and underground water as required to
working site.
7. Foundation drainage and waterproofing is not shown or
the structural portion of the construction documents. Re
portions of the construction documents for drainage, wa
items associated with other disciplines.
A soils report verifying
these assumptions isa required deferred
submittal and must besubmitted once the
testing has takenplace.
Exhaust for the lower level bathrooms are served
by ERV-1. There is a sidewall exhaust grille in
each bathroom. Each grille is balanced to 60 cfm.
The exact kitchen hood appliance has not yet been determined. We are
providing kitchen & fireplace make-up air via FC-2. We anticipate 800
cfm of make-up air for each appliance. Refer to sheet M100 for fan coil
schedules and sheet 7/M401 for fan coil sequence.
See attached Kitchen Hood.pdf cutsheet illustrating maximum 625 cfm.
Revised, refer to D/M300 &
typical assembly F2 on sheet A-500.
Refer to sheet 13/M401. 77 cfm continuous is
equivalent to 180 cfm running 10.3 hrs per day.
The sequence of operation for ERV-1 has the
ERV running continuously during occupied period.
This exceeds the ordinance 40 amount.
Refer to SoilsReport.905 Chatfield Rd.2018.10.pdf
for soil report verification.
12/03/2018
Subject: PlanCheck
Page Label: 1
Author: justinh
File Name: REMP.905 Chatfield road.2018.04.pdf
Provide a spec on the proposed
boiler which shows its efficiency
rating.
REMP.905 Chatfield road.2018.04.pdf (1)
Subject: PlanCheck
Page Label: 3
Author: justinh
File Name: Special Inspection and Testing Agreement.905
Chatfield Drive.2018.04.pdf
The approved fabricator is
illegible, please provide a copy
of this form where all names and
signatures are legible. A
inspected fabricator is required
for any/all field welds, please
provide that signature as well or
verify that only shop welds are
proposed as that is what this
form is indicating. This form
does not need to be submitted at
the same time as the other
responses if you are still waiting
on signatures or selecting
contractors, but building cannot
fully approve this permit until the
form is fully executed.
Special Inspection and Testing Agreement.905 Chatfield Drive.2018.04.pdf (1)
New (non-exempt)
New (exempt)0.00 sqft 0.00 sqft
Total New 1633.00 sqft 0.00 sqft
Total on site 905.00 sqft 0.00 sqft
Total Snowmelt on site
Boiler Efficiency 95.0%100%
Mitigation Payment
B.ON-SITE RENEWABLE CREDITS
Use PV Wo
Use Thermal Wo
Use GS
Onsite Renewable Offsets:How many
or How many squar
Am
905.00 sqft
$32,389.47
Provide a spec on the
proposed boiler which
shows its efficiency
rating.
?.. t\pprnvul uf fahrirnlor. :\pprnvnl ;;lt111l be lm,H:i.J upnu f(:,•ic:\V oi' Ilic falu w;um \ wnl!rn
jHOt.:u'111rl1l :111d q1wlil.Y c;onlrol mnmml~ :mt! pNiurlic :mdili11.1~ 11f' fohdcnlion pr:rctit'·::> h\· ;111 npprowd r,pet:ial i11w~c1inn Hgt·oq.
J. Cor11pJ1.?tion or f::thrknrlo11. l Jpntl l'.OH!pktinn nr fol1ri~:n{i11n, the :1111110\'(.'jl l~1!1ticah11 r.hall :.uhmit Genincnt•\ ofc1;111plinni;1; to th~ hniltlint: 1J1ficinl ~luting 1hm 1hr wmli wns pcrforrncd iu ntcordn11ci: wii11ihc11p11rnvccl cnw,lrnction dnn1111cnl.,.
!. Apprnvc spccinl·in~pcctlon prugrnm. Th~ lmihli11g department sh;ill n111ir1J'.'t nll special in~pec1om mul sp1:dnl·lw;pcclio11 rc1p1irc111c111'" ·
2. t•;nrorrc SJH~daJ li1s11ccll1111. Work 1t·1111irinv. !:pl'cial iu~pct1io11 :ind lhr; luriltih1R lnspe1'.ior r.hall munllnr tho pcrforniancc 11fspcci11I im;pcctr1r,. 11;,11 kr npprnvul, in
nd<litiun lo llmt or"lhc specinl iri~)li!t:lr11. umo.I he 11hlninctl )lrinr 10 plnc<:menl Ill' wnri<"le. covering ufslruc111rnt slcd, •ir other 5imil;rr nllllcri11ts. ·
J. !lrvlcw lnsprctlon rcporl,,, Tlw h11ilrli11g nlHcinl ,,1io11lrl rnvii:w •nccial·insprc1it111 prngrcss nnd G11;1I reports.
4. Prrform 11nnl lnspcclion. The hulldini; nllicinl slir.uld pcrlh1m the lin:il inspect inn and approval for a JllQjed [II IC Sec. IO?J. I] nflrr Ilic linal ,;pcd:ll-i11•;p:c:1io11 '"Port hw; lm<r1 r~vicwcd and :IJl(lfOVt•1I.
Project Adclr~ss: ···--· ---------.-------·-· l'rrn11i i'l'umhe1 '··-------..
Appf\lvcd l'abricntor:
tn\pcr.rcrl l'nhricutor:
(circle one) CITY 01-' ASPRN
i'llKIM COIJNTY:
-·-··-··--·--~------
Signnhm:: 1
':CL'D.~
Si[!nan1rc:
Sin1101uru:
D111c:
Dan Doherty 4/19/18
Dmc;
~I/ /<J
--'-' _' ~l .:
· 1
Prinr,·d Name: Dare:
l'rilllcd N11111t·: Dnlc:
-.. L
The approved fabricator is illegible, please provide
a copy of this form where all names and
signatures are legible. A inspected fabricator is
required for any/all field welds, please provide that
signature as well or verify that only shop welds are
proposed as that is what this form is indicating.
This form does not need to be submitted at the
same time as the other responses if you are still
waiting on signatures or selecting contractors, but
building cannot fully approve this permit until the
form is fully executed.
Refer to Boilers.pdf, cutsheet. Boiler efficiencies
also shown on the boiler schedule on sheet M101.
Refer to signed
905 Chatfield Special Inspection Form.pdf