Loading...
HomeMy WebLinkAboutFile Documents.905 Chatfield Rd.0085.2019 (2).ARBK0085-2019-ARBK_BuildingComment1 Subject: PlanCheck Page Label: A-200_EXTERIOR ELEVATIONS Author: justinh File Name: 0_ARCH_CHANGE ORDER 1.2.pdf Color: All the elevations and sections should be revised and included in this change order to show the change in floor elevation and removal of exterior decks. The floor elevation change would affect every elevation and section. Currently several are missing from the change order set. 0_ARCH_CHANGE ORDER 1.2.pdf (1) Subject: PlanCheck Page Label: 2 Author: justinh File Name: 17085-Building Permit Change Order 1 REMP Calc-041619.pdf Color: The PV worksheet is filled out incorrectly. The original group is at 165 degrees from true south per the plan (roof slopes to the north) and the new 6 panel group is at 180 degrees from true south. Unless a new inverter is being proposed the inverter capacity should be 10kW per the originally submitted spec. Please revise the form to accurately depict the solar system being proposed. Please also confirm that the new group of 6 panels will be using the same 360W panels that the original group had specified or provide a new spec for the new group. 17085-Building Permit Change Order 1 REMP Calc-041619.pdf (1) Subject: PlanCheck Page Label: PL1.0_PROJECT SITE PLAN & NOTES Author: justinh File Name: 7_SPA_R_17085-Building Permit Change Order 1.2.pdf Color: Please complete the attached APSP-15 compliance information sheet to demonstrate compliance with the 2015 IECC energy code requirements for residential pools and spas. 7_SPA_R_17085-Building Permit Change Order 1.2.pdf (1) All the elevations and sections should be revised and included in this change order to show the change in floor elevation and removal of exterior decks. The floor elevation change would affect every elevation and section. Currently several are missing from the change order set. Parcel ID #: CollectorAspect,Degress fromTrue South Collector Tilt,Degrees FromHorizontal SolarOrientationAdjustmentFactor DC side capacity(kW)Inverter capacity(kW)kW forcredit kW MitigationCredit Collector Group 1 0 0 87.00%9.3 9.3 9.3 8.09 kWCollector Group 2 87.00%0 0.00 kWCollector Group 3 87.00%0 0.00 kWCollector Group 4 87.00%0 0.00 kWCollector Group 5 87.00%0 0.00 kWCollector Group 6 87.00%0 0.00 kWCollector Group 7 87.00%0 0.00 kWCollector Group 8 87.00%0 0.00 kWCollector Group 9 87.00%0 0.00 kWCollector Group 10 87.00%0 0.00 kWCollector Group 11 87.00%0 0.00 kWCollector Group 12 87.00%0 0.00 kWCollector Group 13 87.00%0 0.00 kWCollector Group 14 87.00%0 0.00 kWCollector Group 15 87.00%0 0.00 kWCollector Group 16 87.00%0 0.00 kWCollector Group 17 87.00%0 0.00 kWCollector Group 18 87.00%0 0.00 kWCollector Group 19 87.00%0 0.00 kWCollector Group 20 87.00%0 0.00 kWTotal:8.09 kW$ Mitigation Credit:55,547.30$ Instructions:1) 2) 3)DC side capacity is the total labled panel output kW in a group.4)Inverter capacity is the recommended input power in kW of your inverter(s).5)6)7)8) PREPARED BY:Date:4/16/2019 Enter the aspect and tilt for each group. The solar orientation adjustment factor is automaticallycalculated. PROJECT ADDRESS: The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP andCREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP payment. Determine how many collector groups you have. Groups are used to differentiate between collectors(panels) with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily, youmight have just one group. 905 Chatfield Rd. Aspen, CO 81611 The kW mitigation credit is totalled and multiplied by $6865.32/kW to get the $ Mitigation Credit You will be given credit for the lesser of the labeled panel output or the inverter.The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit. PV WORKSHEET City of Aspen Version 11.3 Updated December 13, 2017 Permit Number:0273502402004 The PV worksheet is filled out incorrectly. The original group is at 165 degrees from true south per the plan (roof slopes to the north) and the new 6 panel group is at 180 degrees from true south. Unless a new inverter is being proposed the inverter capacity should be 10kW per the originally submitted spec. Please revise the form to accurately depict the solar system being proposed. Please also confirm that the new group of 6 panels will be using the same 360W panels that the original group had specified or provide a new spec for the new group. Please complete the attached APSP-15 compliance information sheet to demonstrate compliance with the 2015 IECC energy code requirements for residential pools and spas.