HomeMy WebLinkAboutFile Documents.905 Chatfield Rd.0085.2019 (5).ARBKSILVERSTEIN RESIDENCE03-15-2019R1REVISED SHEETSREVISEDSHEET #SHEET NAMEREVISION DESCRIPTIONARCH1 - COVER COVER SHEET BUILDING PERMIT CHANGE ORDER 1 COVER2 - COVER SHEET INDEX HIGHLIGHT REVISED SHEETS UNDER CHANGE ORDER 1A-005 PROPOSED FAR REVISED DECK AREACIVILC1-00 SITE & UTILITY PLAN REVISED TERRACE LAYOUTC1-01 UTILITY PLAN UTILITIES TO REVISED TERRACE LAYOUTC1-10 DRIVEWAY PLAN AND PROFILE REVISED TERRACE LAYOUTC2-00 GRADING AND DRAINAGE PLAN GRADING AROUNDREVISED TERRACE LAYOUT - GRAVELWASH TO RECEIVE RAIN CHAINC2-10 STORM DRAINAGE PLAN AND PROFILES REVISED TERRACE LAYOUTC2-11 STORM DRAINAGE PLAN AND PROFILES REVISED TERRACE LAYOUTLANDSCAPELCVR COVER / NOTES / INDEX MATERIAL / MOCKUP NOTESL0.01 LANDSCAPE ARCHITECTURE NOTES PLANT NOTESL1.00 LANDSCAPE DEVELOPMENT PLAN REVISED TERRACE LAYOUT PLANTINGL3.00 MATERIALS PLAN (HARDSCAPE) REVISED TERRACE LAYOUTL5.00 PLANTING PLAN PLANT LISTL5.10 HYDROZONE DIAGRAM WATER EFFICIENT LANDSCAPE WORKSHEETL7.01 DETAILSADDRESS WALLL7.02 DETAILSSEAT WALL / OMMITANCE OF LAWN FIRE FEATUREL8.10 IRRIGATION PLAN REVISED TERRACE AND IRRIGATION LAYOUTTHIS CHANGE ORDER IS PRIMARILY WARRANTED BY THE ADDITION OF A SPA ALONG WITH A BASIC TERRACE LAYOUT MODIFICATION WITH ARCHITECTURAL, STRUCTURAL , MECHANICAL AND LIGHTING IMPLICATIONS.SECONDARY REVISIONS INCLUDE, BUT ARE NOT LIMITED TO:• A REVISED EXT INSULATION SYSTEM• 2 REVISED WINDOWS• REVISED DECK AND ROOF ASSEMBLY• REVISED SNOWMELTPLEASE SEE THE FOLLOWING SCHEDULE FOR A COMPREHENSIVE LIST OF REVISED SHEETS AND A BRIEF DISCRIPTION OF THE REVISIONS THEY CONTAIN.EACH REVISION IS CLOUDED ON IT'S RESPECTIVE SHEET.CHANGE ORDER 1 -NARRATIVEARCHLANDSCAPECIVIL06/10/2019
SILVERSTEIN RESIDENCE03-15-2019R2REVISED SHEETSREVISED SHEET #SHEET NAMEREVISION DESCRIPTIONARCHA-100 SITE PLAN - PRE-DEVELOPMENT &PROPOSED GRADEREVISED TERRACE LAYOUTA-100.1 SITE PLAN - EXISTING & PROPOSED GRADE REVISED TERRACE LAYOUTA-101 SNOWMELT PLAN REVISED SNOWMELT @ BACK TERRACEA-109 LOWER LEVEL CRAWL SPACE REVISED TERRACE FOUNDATIONA-110 OVERALL LOWER LEVEL FLOOR PLAN REVISED TERRACE FOUNDATIONA-112 OVERALL UPPER LEVEL FLOOR PLAN REMOVAL OF DECKSA-113 OVERALL ROOF PLAN REVISED SOLAR LAYOUTA-120 ENLARGED LOWER LEVEL FLOOR PLAN REVISED TERRACE FOUNDATIONA-122 ENLARGED MAIN LEVEL FLOOR PLAN - B REVISED WALL TYPE - W6C - @ TWO TYP B SHEARWALLSA-123 ENLARGED UPPER LEVEL FLOOR PLAN REMOVAL OF DECKSA-204 EXTERIOR ELEVATIONS MECH VENTS @ SPA VAULTA-322 WALL SECTIONS REVISED ROOF DETAILSA-500 TYP. FLOOR/ROOF ASSEMBLIES REVISED R1 ROOF ASSEMBLY - USING BALLAST IN LIEUOF PAVERSA-501 TYP. WALL ASSEMBLIES REVISED WALL ASSEMBLIES - USE ZIP PANEL SYSTEMA-520 FLOOR DETAILS REVISED "FLOOR" DETAILS (NOW A ROOF INSTEAD OFBALCONY FLOOR)A-601 WINDOW SCHEDULE REVISED WINDOWSSTRUCTS-120 FOUNDATION PLAN - A REVISED TERRACE FOUNDATIONS-122 LOWER LEVEL FRAMING - A REVISED TERRACE FOUNDATIONS-124 MAIN LEVEL FRAMING PLAN - A REVISED TERRACE FOUNDATIONS-125 MAIN LEVEL FRAMING PLAN - B PLANTER WALLS-126 LOW ROOF FRAMING FRAMINGS-127 UPPER LEVEL FRAMING PLAN ZIP PANEL OVER SHEAR WALLS-200 SECTIONS & DETAILS STEEL PLATE RETAINING WALL DETAILS-301 SCHEDULES ZIP PANEL SCHEDULEMECHM001 MECHANICAL ZONING PLAN SNOWMELT ZONINGM101 MECHANICAL SCHEDULES SNOWMELT SCHEDULEM201 LOWER LEVEL MECHANICAL PLAN VAULT EQUIPMENTM300 MECHANICAL SCHEMATICS REVISED CONTROLSM401 SEQUENCE OF OPERATION REVISED NOTESLIGHTINGLIGHT 0.2a ARCHITECTURAL FIXTURE SCHEDULE REVISED FIXTURESLIGHT 1.0 SITE LIGHTING PLAN REVISED FIXTURESLIGHT 1.1 LOWER LEVEL LIGHTING PLAN REVISED LAYOUTLIGHT 1.2.2 MAIN LEVEL SOUTH PARTIAL LIGHTINGPLANREVISED LAYOUTPOOLPL1.0 PROJECT SITEPLAN & NOTES NEW SHEETPL1.1 SPA PLANNEW SHEETPL1.2 SPA DATANEW SHEETPL2.1 spa planNEW SHEETPL2.2 SPA DETAILS NEW SHEETPL3.1 PIPING SCHEMATICS & EQUIPMENT PLAN NEW SHEETPL4.1 3D VIEWSNEW SHEETLIGHTINGPOOLSTRUCTUREARCH06/10/2019
SILVERSTEIN RESIDENCE05-13-2019R3CHANGE ORDER 1.2THIS ADDENDUM CHANGE ORDER IS MANDATED UPON THE DISCOVERY THAT THE FRONT YARD WATERLINE LOCATION IS HIGHER THAN PREVIOUSLY CALCULATED. IN ORDER TO MAINTAIN THE THE PRESCRIBED 6' OF GROUND COVERAGE ABOVE THE WATERLINE AND MAINTAIN A COMPLIANT AND DESIRABLE DRIVEWAY SLOPE, THE CLIENT IS FORCED TO RAISE THE GARAGE PORTION OF THE HOUSE.PLEASE SEE THE FOLLOWING SCHEDULE FOR A LIST OF REVISED SHEETS AND A BRIEF DISCRIPTION OF THE REVISIONS THEY CONTAIN.EACH REVISION IS CLOUDED ON IT'S RESPECTIVE SHEET.CHANGE ORDER 1.2 -NARRATIVEREVISEDSHEET #SHEET NAMEREVISION DESCRIPTIONARCHA-007 HEIGHT LIMITS REVISED ROOF HEIGHTS AND ROOF SLOPECIVILC1-10 DRIVEWAY PLAN AND PROFILE REVISED GRADE & DRIVEWAY PROFILELANDSCAPELCVR COVER / NOTES / INDEX REVISION DESCRIPTIONL1.00 LANDSCAPE DEVELOPMENT PLAN REVISED STEPSL3.00 MATERIALS PLAN (HARDSCAPE) REVISED TERRACE LAYOUTARCHA-111 OVERALL MAIN LEVEL FLOOR PLAN RAISED FLOOR @ GARAGE, STEPS ADDEDA-113 OVERALL ROOF PLAN REVISED SOLAR LAYOUTA-123 ENLARGED UPPER LEVEL FLOORPLANREMOVAL OF DECKSA-201 EXTERIOR ELEVATION RAISED FLOOR AND ROOF HEIGHTSA-300 BUILDING SECTIONS RAISED FLOOR AND ROOF HEIGHTS, FLOOR OVERFRAMINGA-302 BUILDING SECTIONS RAISED FLOOR AND ROOF HEIGHTS, FLOOR OVERFRAMINGA-303 BUILDING SECTIONS RAISED FLOOR AND ROOF HEIGHTSA-304 BUILDING SECTIONS RAISED FLOOR AND ROOF HEIGHTSA-400 STAIRS ENLARGED PLANS &AXONOMETRICADDED STAIRSA-401 STAIR SECTIONS & ELEVATIONS ADDED STAIRSA-601 WINDOW SCHEDULE REVISED WINDOWS06/10/2019