Loading...
HomeMy WebLinkAboutFile Documents.COACH RD.0079.2018 (21).ARBKPTurf14A11"F12A30PSIL.2.03ISSUE & REVISION DATESPlot Date: ________Project #: 257Drawn By: JFChecked By: SHL A N D S C A P E A R C H I T E C T U R E · L A N D P L A N N I N G 123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621 WWW.CONNECTONEDESIGN.COM | 970.379.1030 || BAR X RESIDENCE 110 + 112 COACH ROAD ASPEN, CO 816110,0,0ACC FINAL SITE PLAN REVIEWPERMIT SETROUND 1 REVISIONS02/28/201805/31/201810/19/201810/12/2018IRRIGATIONLEGEND & NOTES10/30/2018Please include the irrigationvalves for each hydrozone,such as: (A3,A7,A8, etc.)Please add the language ofWELS Section 4.3.2 (l & m)regarding disturbance underexisting trees A-01A-01FLEX ROOMA112.50.201"A28.440.211"A3Drip0.151"A49.520.181"A58.750.211"A6Drip0.151"A118.270.251"A126.580.191"A136.730.261"A149.910.211"A15Drip0.151"A168.470.231"A18Drip0.151"A19Drip0.151"A209.980.271"A219.230.241"A173.360.441"A73.260.391"A810.30.241"A913.01.881"A1013.01.401"PAF2140PSIABBBBBBYKKKKGKRRMMMMMLMGKKKKMLLMMLLLMMMLLKGBKKKKKMMMLMKKKKKKKKKKKKKKKKRRRRKKKKKRRRRRRBBBRRRRAAMMMMMMBKGRKKKMMLMMGKBYAA40PSI40PSI40PSI40PSI40PSI40PSI40PSI40PSI40PSI40PSI30PSI30PSI30PSI30PSI30PSI30PSI30PSI40PSI30PSI30PSIPTurf14A11"FA30PSI12L.2.040'20'40'SCALE: 1"=20'NORTHISSUE & REVISION DATESPlot Date: ________Project #: 257Drawn By: JFChecked By: SHL A N D S C A P E A R C H I T E C T U R E · L A N D P L A N N I N G 123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621 WWW.CONNECTONEDESIGN.COM | 970.379.1030 || BAR X RESIDENCE 110 + 112 COACH ROAD ASPEN, CO 816110,0,0ACC FINAL SITE PLAN REVIEWPERMIT SETROUND 1 REVISIONS02/28/201805/31/201810/19/201810/12/2018IRRIGATION PLANPROPERTY LINE10/30/2018A lockablemaster valveis required asper WELSSection 5.1.3 910DRIP FLUSH CAPASSEMBLYSINGLE OUTLET DRIPEMITTER ASSEMBLY11WALL MOUNTCONTROLLER ASSEMBLY12SUBSURFACE DRIP ASSEMBLY IN TURF AREAS86-INCH POP UP SPRAY SPRINKLER ASSEMBLY123456ISOLATION GATE VALVE ASSEMBLYQUICK COUPLING VALVE ASSEMBLYREMOTE CONTROL TURFVALVE ASSEMBLYREMOTE CONTROL DRIP VALVE ASSEMBLYMANUAL DRAINVALVE ASSEMBLYMASTER VALVE ASSEMBLY76-INCH POP UP MP-ROTATOR ASSEMBLYL.2.05ISSUE & REVISION DATESPlot Date: ________Project #: 257Drawn By: JFChecked By: SHL A N D S C A P E A R C H I T E C T U R E · L A N D P L A N N I N G 123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621 WWW.CONNECTONEDESIGN.COM | 970.379.1030 || BAR X RESIDENCE 110 + 112 COACH ROAD ASPEN, CO 816110,0,0ACC FINAL SITE PLAN REVIEWPERMIT SETROUND 1 REVISIONS02/28/201805/31/201810/19/201810/12/2018IRRIGATIONDETAILS10/30/2018 1314PVC TECHLINECONNECTION152346213456IRRIGATION PUMP STATION A-ASCALE: N.T.S.15EMITTER SCHEDULEL.2.06ISSUE & REVISION DATESPlot Date: ________Project #: 257Drawn By: JFChecked By: SHL A N D S C A P E A R C H I T E C T U R E · L A N D P L A N N I N G 123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621 WWW.CONNECTONEDESIGN.COM | 970.379.1030 || BAR X RESIDENCE 110 + 112 COACH ROAD ASPEN, CO 816110,0,0ACC FINAL SITE PLAN REVIEWPERMIT SETROUND 1 REVISIONS02/28/201805/31/201810/19/201810/12/2018IRRIGATIONDETAILS10/30/2018