Loading...
HomeMy WebLinkAboutFile Documents.COACH RD.0079.2018 (40).ARBKDEW POINT CALCULATION JOB NAME: DBX 7 JOB NUMBER: 18003.00 DATE: 3/30/18 CALCS BY: JSW 5/8:12 Slope Roof DP @ DP @ DP @ DP @ DP @ 20% RH 25% RH 30% RH 35% RH 45% RH 30 33 37 41 48 0 Indoor design temperature (IDT)70 70 R-value 0.17 0.00 0.00 0.94 38.00 19.00 0.00 0.56 0.61 59.28 20.17 46 41 YES Note: To minimize the potential for condensation problems, humidity levels within the home must be properly controlled and adjusted based on outdoor temperatures. Roof Underlayment 3/4" plywood Spray Foam Insulation Outdoor design temperature (ODT) Delta T = IDT - ODT Layer Thermal Resistance of Proposed Roof Assembly Outside air layer Roofing A: point of condensation analysis Vapor barrier 5/8" gypboard TA = IDT - (R-value at A)/(R-Total) * (Delta T) TA = Temperature at point A Batt Insulation Is TA warmer than the DPA? Inside air layer R-Total R-value at A DPA = Dew point at point A (35% RH) 3/30/18 4/5/2018 DEW POINT CALCULATION JOB NAME: DBX 7 JOB NUMBER: 18003.00 DATE: 3/30/18 CALCS BY: JSW Flat Roof DP @ DP @ DP @ DP @ DP @ 20% RH 25% RH 30% RH 35% RH 45% RH 30 33 37 41 48 0 Indoor design temperature (IDT)70 70 R-value 0.17 0.00 0.00 0.94 10.00 38.00 19.00 0.00 0.56 0.61 69.28 20.17 50 41 YES Note: To minimize the potential for condensation problems, humidity levels within the home must be properly controlled and adjusted based on outdoor temperatures. DPA = Dew point at point A (35% RH) Is TA warmer than the DPA? Rigid Insulation 5/8" gypboard Inside air layer R-Total R-value at A TA = Temperature at point A TA = IDT - (R-value at A)/(R-Total) * (Delta T) Roof Underlayment 3/4" plywood Spray Foam Insulation A: point of condensation analysis Batt Insulation Vapor barrier Outdoor design temperature (ODT) Delta T = IDT - ODT Thermal Resistance of Proposed Roof Assembly Layer Outside air layer Roofing 3/30/18 4/5/2018