HomeMy WebLinkAboutChange Order.COACH RD.0159.2019 (2).ARBKSubmission ID
Submission Date
Submission Type
Master Permit Number
Description of Work
Project Address
E-mail
Dropbox Folder Name
Permits Intake Form
4368720851361492154
2019-06-20 14:34:56
Change Order
0079.2018.PRBK
The owner has revised the lower level floor plan. Revised architectural drawings
documenting this revision along with corresponding MEP, Structural, and lighting
docs have been provided. The fixture count has not changed. The floor area has
not changed. In addition the electrical service has been changed to 3 phase
power instead of single phase as there are only 3 phase transformers in the
project vicinity.
110 Coach Rd.
bhansen@hansenconst.com
0079.2018.ARBK Permit CO Application #1.pdf
2019-06-17 Arch CO1 110_112 Coach Rd.pdf
2019-06-17 Electrical CO1 110_112 Coach Rd.pdf
2019-06-17 Lighting CO1 110_112 Coach Rd.pdf
2019-06-17 MEP CO1 110_112 Coach Rd.pdf
2019-06-17 Struct CO1 110_112 Coach Rd.pdf
110 Coach Rd.-Change Order
06/20/2019