Loading...
HomeMy WebLinkAboutChange Order.COACH RD.0159.2019 (2).ARBKSubmission ID Submission Date Submission Type Master Permit Number Description of Work Project Address E-mail Dropbox Folder Name Permits Intake Form 4368720851361492154 2019-06-20 14:34:56 Change Order 0079.2018.PRBK The owner has revised the lower level floor plan. Revised architectural drawings documenting this revision along with corresponding MEP, Structural, and lighting docs have been provided. The fixture count has not changed. The floor area has not changed. In addition the electrical service has been changed to 3 phase power instead of single phase as there are only 3 phase transformers in the project vicinity. 110 Coach Rd. bhansen@hansenconst.com 0079.2018.ARBK Permit CO Application #1.pdf 2019-06-17 Arch CO1 110_112 Coach Rd.pdf 2019-06-17 Electrical CO1 110_112 Coach Rd.pdf 2019-06-17 Lighting CO1 110_112 Coach Rd.pdf 2019-06-17 MEP CO1 110_112 Coach Rd.pdf 2019-06-17 Struct CO1 110_112 Coach Rd.pdf 110 Coach Rd.-Change Order 06/20/2019