Page: [3] C.02 EXISTING AND DEMOLITION
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Are there existing main utility
lines in this easement? Show all
existing utilities serving the side.
Civil Plan Set.805 Roaring Fork Road.2018.01.pdf (31)
Page: [3] C.02 EXISTING AND DEMOLITION
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Reuse of utilities shall be verified
prior to issuance of building
permit.
Page: [4] C.03 BASINS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Clean outs are shown to
maintain the pipe system, how
will the rock beds be
maintained?
Page: [4] C.03 BASINS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Clearly show the extents of the
rock beds in the basins. Verify
the rock beds exist within the
property boundaries.
Page: [4] C.03 BASINS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
How is debris from the roof and
driveway being removed prior to
entering the rock bed system to
prevent clogging of the pipes?
Are there existing main
utility lines in this
easement? Show all
existing utilities serving
the side.
Reuse of utilities shall
be verified prior to
issuance of building
permit.
Clean outs are shown
to maintain the pipe
system, how will the
rock beds be
maintained?
Clearly show the
extents of the rock
beds in the basins.
Verify the rock beds
exist within the
property boundaries.
How is debris from the
roof and driveway
being removed prior to
entering the rock bed
system to prevent
clogging of the pipes?
The rock beds have been removed from the
design and are no longer a part of the civil set.
All existing utilities have been located and are
included on the civil set.
The transformer has been noted to be
replaced. All other utilities, except water
service, will be reused unless issues occur
during construction.
All rock beds have been removed from the design and no
perforated pipes will disperse runoff into the pervious
pavers. All runoff from impervious areas will be collected
and dispersed into the drywell or the biodetention pond.
The rock beds have been removed from the
design, and debris from the roof and driveway
will be collected in the sumps of the inlets and
in the drywell.
Page: [4] C.03 BASINS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Per the URMP the max ratio of
impervious to pervious area is
2:1 for pervious pavers. Revise
the treatment and detention in
basin 1 and 2 to comply. Could
bioretention be utilized in
addition to the pervious pavers
in these basins?
Page: [4] C.03 BASINS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
The drainage report text calls
our the total area for basin 1 to
be 10,721sf and the
imperviousness to be 57%.
Revise all tables (in the plans
and drainage report) to be
consistent.
Page: [5] C.04 SUB BASINS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Is the trench drain in the optimal
location to prevent damage
during snow removal activities.
Page: [5] C.04 SUB BASINS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Trench drain in ROW will require
a permanent encroachment
license prior to CO. This can be
applied for post construction.
Snowmelt in ROW shall be on a
separate zone.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
20.00
Per the URMP the max
ratio of impervious to
pervious area is 2:1 for
pervious pavers.
Revise the treatment
and detention in basin
1 and 2 to comply.
Could bioretention be
utilized in addition to
the pervious pavers in
these basins?
The drainage report
text calls our the total
area for basin 1 to be
10,721sf and the
imperviousness to be
57%. Revise all tables
(in the plans and
drainage report) to be
consistent.
Is the trench drain in
the optimal location to
prevent damage during
snow removal
activities.
Trench drain in ROW
will require a
permanent
encroachment license
prior to CO. This can
be applied for post
construction.
Snowmelt in ROW
shall be on a separate
zone.
20.00
Scale legend has been changed to reflect
the drawing's scale.
There are two separate basins.
Basin 1= 5793 S.F.
Offsite Basin 1 (OS1) =10721 S.F.
The pervious pavers will not be collecting
additional impervious area as downspouts
and the driveway will be dispersing into the
drywell or the biodetention pond. The ratio
limits are within the URMP guidelines.
Trench drain has been relocated away from
the road to prevent damage, and the trench
drain at the property line has been removed.
A permanent encroachment license will be
applied for by the owner.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
48 ft
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Are these trees existing? How
will the service line be installed
below them? It is not
recommended to plant large
plants or trees above service line
to prevent future impacts to
vegetation if maintenance is
required.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Call out new service line shall be
located 18" minimum away from
old tap or other taps on the line.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Clarify what landscaping is
proposed. Ensure there are no
conflicts with the stormwater
infrastructure or utilities and
landscaping.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
COA recommends minimizing
bends in service line, can the
alignment be adjusted to avoid
the 45 degree angle?
48 ft
Are these treesexisting? How will theservice line beinstalled below them?It is notrecommended toplant large plants ortrees above serviceline to prevent futureimpacts to vegetationif maintenance isrequired.
Call out new service
line shall be located
18" minimum away
from old tap or other
taps on the line.
Clarify what
landscaping is
proposed. Ensure
there are no conflicts
with the stormwater
infrastructure or
utilities and
landscaping.
COA recommends
minimizing bends in
service line, can the
alignment be adjusted
to avoid the 45 degree
angle?
Scale has been changed to reflect an 18' driveway with the
max allowed 3' flare on either side of the driveway.
Water service is routed to reflect this comment.
The existing tree is planned to be removed, and
construction will address any issues with regards
to the proposed trees. A note will be applied to
the plan set so as to require hand-digging for any
sensitive areas of installation.
We have called out that new water service shall be
tapped, at minimum, 18" away from any existing
tap.
Proposed stormwater infrastructure and utilities have
been coordinated with the landscape architect, so no
conflicts occur.
The water line is copper, which may be routed without
any bend fittings. The alignment was updated to avoid
any vegetation conflicts.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
How is drainage of the street
handled? The ROW adjacent to
this property shall be designed
to meet the detail in the
appendix of the Engineering
Design standards for
residential/local streets without
C&G.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Is grading proposed in the
ROW? Significantly more
contour lines are shown on this
site plan than on the
improvement survey. Please
clarify what grading is proposed.
If grading is proposed, call out
the contour elevations.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
It appears that three different
line types are shown to
represent grading, please clarify
what the lines represent.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Sheet C.02 does not call out that
water service line is to replaced,
revise for consistency.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Show rough location of the curb
stop on the plans or note that it
shall be located in a logical
location where the addition of a
coupling is avoided. Call out
material of the service line.
How is drainage of the
street handled? The
ROW adjacent to this
property shall be
designed to meet the
detail in the appendix
of the Engineering
Design standards for
residential/local streets
without C&G.
Is grading proposed in
the ROW? Significantly
more contour lines are
shown on this site plan
than on the
improvement survey.
Please clarify what
grading is proposed. If
grading is proposed,
call out the contour
elevations.
It appears that three
different line types are
shown to represent
grading, please clarify
what the lines
represent.
Sheet C.02 does not
call out that water
service line is to
replaced, revise for
consistency.
Show rough location of
the curb stop on the
plans or note that it
shall be located in a
logical location where
the addition of a
coupling is avoided.
Call out material of the
service line.
Due to existing trees, the design cannot meet the
Engineering Design Standards. A screened rock bed
with pervious pavers is proposed in the parking spot
to reduce the runoff in the road to historical runoff.
These are not contours and are planting beds, we
will remove this from the civil set.
The dashed lines are not contours and represent
planting beds. These have been removed from
the civil set for clarity.
Note on sheet C.02 has been update to reflect the
new service.
The plan-set has been updated to show the
proposed condition for the curb stop. No coupling
will be required.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Show the extents of the dripline
of the trees to verify that the
grading will not occur within the
dripline.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
The scale on this sheet is called
out to be 1''=20', should this be
1''=10'? Max allowable driveway
width is 18'.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
This retaining wall appears to be
4' tall which requires a design by
a structural engineer. Please
include a detail and reference
the detail in a call out on this
sheet.
Page: [6] C.05 GRADING AND DRAINAGE
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
This walkway area does not
match layout in architectural site
plan. Ensure this does not
impact volume of the gravel bed.
Page: [8] C.07 PROFILES AND SECTIONS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Call out 18" of
sand/topsoil/organic media in the
detail.
Show the extents of
the dripline of the trees
to verify that the
grading will not occur
within the dripline.
The scale on this sheet
is called out to be
1''=20', should this be
1''=10'? Max allowable
driveway width is 18'.
This retaining wall
appears to be 4' tall
which requires a
design by a structural
engineer. Please
include a detail and
reference the detail in
a call out on this sheet.
This walkway areadoes not matchlayout in architecturalsite plan. Ensure this
does not impact
volume of the gravel
bed.
Call out 18" of
sand/topsoil/organic
media in the detail.
The wall is purposed for privacy and to not retain
any soils. The wall is designed to not exceed the
maximum height (4' per the URMP) so as to not
require a structural engineer.
The scale legend has been modified
accordingly.
The tree driplines on the property have
been added to the permit set. Landscape
architect and parks have coordinated tree
removal mitigation.
The walkway has been designed to meet the
Landscape Architect design. The rock bed has been
removed and layout of this patio does not affect the
storage of stormwater runoff.
The detail has been updated to show this
information.
Page: [8] C.07 PROFILES AND SECTIONS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Call out side slopes
Page: [8] C.07 PROFILES AND SECTIONS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Clearly call out on the plan set
were the screen rock bed with
pervious paver details on this
sheet are used in the site plan
vs. the details on C.08 for the
pervious paver and snowmelt
pervious paver with storage.
Note that filter fabric is not
required in the URMP.
Page: [8] C.07 PROFILES AND SECTIONS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
This detail shall be to scale to
verify detention volume is
provided, what is the distance
the bioretention area would be
from the roadway?
Page: [8] C.07 PROFILES AND SECTIONS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Verify there are no utilities below
the ROW bioretention area. This
shall follow the detail and sizing
guild lines outlined in the URMP,
include the 18" of treatment
material.
Page: [9] C.08 DETAILS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Call out void space in this detail.
Call out side slopes
Clearly call out on the plan set were the screen rock
bed with pervious paver details on this sheet are
used in the site plan vs. the details on C.08 for the
pervious paver and snowmelt pervious paver with
storage. Note that filter fabric is not required in the
URMP.
This detail shall be to
scale to verify
detention volume is
provided, what is the
distance the
bioretention area
would be from the
roadway?
Verify there are no
utilities below the
ROW bioretention
area. This shall follow
the detail and sizing
guild lines outlined in
the URMP, include the
18" of treatment
material.
Call out void space in
this detail.
The offsite bioretention basin currently exists and will
not be disturbed. An analysis was done to determine
that no additional engineering would be required to
capture the adjacent offsite runoff from the existing
road. Drainage calcs are provided on C.03 in offsite full
detention storage table under OS1. All items in the civil
set will establish this basin as existing.
The rock bed has been removed from the design.
Refer to the notes page 'legend' for limits of pervious
pavers and snowmelt.
The offsite bioretention basin currently exists and will
not be disturbed. An analysis was done to determine
that no additional engineering would be required to
capture the adjacent offsite runoff from the existing
road. All items pertaining to this basin in the civil set will
be updated to reflect this biodetention basin as existing..
No utilities are located in the ROW bioretention area.
This is an existing system and will not be altered for
construction.
This detail was updated to show void space of 8% per
the URMP requirements.
Page: [9] C.08 DETAILS
Author: pjm
File Name: Civil Plan Set.805 Roaring Fork Road.2018.01.pdf
Pervious paver with snowmelt
shall follow the spreadsheet
design attached to the comment
letter email. Please include with
resubmittal to ensure insulation
meets Building code.
Page: 5
Author: pjm
File Name: Drainage Report.805 Roaring Fork
Road.2018.01.pdf
The drainage report states that
all BMPs are designed for full
detention not just the drywell.
Drainage Report.805 Roaring Fork Road.2018.01.pdf (5)
Page: 5
Author: pjm
File Name: Drainage Report.805 Roaring Fork
Road.2018.01.pdf
The soils report called out a
small addition to the house, is
that still proposed? If so, how is
drainage from the new
impervious area routed for
treatment and detention?
Page: 8
Author: pjm
File Name: Drainage Report.805 Roaring Fork
Road.2018.01.pdf
Address the emergency overflow
routes for all basins.
Page: 15
Author: pjm
File Name: Drainage Report.805 Roaring Fork
Road.2018.01.pdf
is historic release in the historic
location not achievable on this
site?
Pervious paver with
snowmelt shall follow
the spreadsheet
design attached to the
comment letter email.
Please include with
resubmittal to ensure
insulation meets
Building code.
ively flat with existing grade typically draining away from
nage infrastructure to be installed for the site will include a eened rock beds. This drainage report will focus on the ted and conveyed by the proposed storm drainage systems. that are no longer following historical runoff flow paths or k runoff is a drywell designed for full detention of a 100-
ies
Roaring Fork Road is located in basin 8, a 53.8-acre portion ainage plan. The site is not located close enough to City of ibly utilize. Full detention is being implemented, and ormwater system capacity.
into the vegetation along the road within the right of way.
ure that the existing swale in the right-of-way has capacity
01/22/2018
The drainage report
states that all BMPs
are designed for full
detention not just the
drywell.
he site. The intent of this report
. The Low Impact Design
guide throughout the design
y, single family residence with
way around the house , three
Fork Road. There are a number
well.
typically draining away from
lled for the site will include a
ge report will focus on the
posed storm drainage systems.
The soils report called out a
small addition to the house, is
that still proposed? If so, how is
drainage from the new
impervious area routed for
treatment and detention?
into the proposed pipe
ea all slopes to the grated
r storm events using the
culate runoff for this basin
Time of Concentration
than 5 minutes, but
Address the emergency
overflow routes for all
basins.
o the COA’s storm water infrastructure , and all BMP’s are sized section 2.2 of this report. Below is the analyses for the capacity and infiltration.
s
proposed capacities meet the required volume of the screened
he area in the table is the surface area of the pavers that are placed
0.01 0.087 0.304 0.45 0.52 2.06 Yes
0.01 0.087 0.304 0.26 0.38 1.52 Yes0.01 0.087 0.304 0.47 0.53 2.12 Yes
0.01 0.087 0.304 0.47 0.53 2.12 Yes
0.01 0.087 0.304 0.38 0.49 1.94 Yes
0.01 0.196 0.895 0.30 0.41 2.43 Yes0.01 0.087 0.304 0.26 0.38 1.52 Yes0.01 0.087 0.304 0.26 0.38 1.52 Yes
0.01 0.196 0.895 0.39 0.49 2.91 Yes
0.01 0.196 0.895 0.40 0.50 3.00 Yes
01/22/20
is historic release in
the historic location not
achievable on this
site?
A small addition is proposed on the east side of
the existing home. All drainage is accounted for
in the design and is directed to the biodetention
area for treatment.
The topography is too flat to release at a historical rate by
means of daylighting an outflow pipe . Soils report includes
that the percolation test and soil type (B) is best suited for
design using full detention and infiltration.
All of the BMPs are designed for full detention. The drainage
report has been updated with all changes since the previous
submittal being highlighted.
The spreadsheet has been completed and has been
submitted with this response. The spreadsheet is
included on the details page as well.
The civil set has been updated to show the
emergency flow routes.
Page: 16
Author: pjm
File Name: Drainage Report.805 Roaring Fork
Road.2018.01.pdf
The above storage requirement
table states that basin 3 requires
58cf of detention which is
provided in the bioretention area.
Where did the 187cf below come
from? Is this oversized?
Page: 5
Author: pjm
File Name: Plan Set.805 Roaring Fork Road.2018.01.pdf
Include monuments or witness to
the corner of lot corners.
Plan Set.805 Roaring Fork Road.2018.01.pdf (1)
equired capacity for the
al Capacity Required Capacity
(ft3)(ft3)
The above storage
requirement table
states that basin 3
requires 58cf of
detention which is
provided in the
bioretention area.
Where did the 187cf
below come from? Is
this oversized?
Include monuments or
witness to the corner
of lot corners.
Yes, the basin bioretention area was
previously oversized. Basins 2 and 3
have been redesigned to drain to this
bioretention basin to make use of the
excess capacity and to eliminate screen
rock beds.
The property boundary is shown and described on the left side of sheet C02
with a point of beginning (POB) at "City of Aspen GPS #20 and #9, and
Yellow Plastic Cap (YPC) LS# 9184. For further information, refer to survey
provided by PLS that was submitted with original permit.