Loading...
HomeMy WebLinkAboutFile Documents.805 Roaring Fork Rd.0019.2018 (18).ARBK0019.2018.ARBK_Engineerin2_805 Roaring Fork Rd Page: C.03 BASINS Author: pjm File Name: CIVIL PLAN SET.pdf Screen rock beds were removed from the design as they are not an approved BMP per the URMP. Refer to this as the storage in the pervious paver subbase. CIVIL PLAN SET.pdf (7) Page: C.05 GRADING AND DRAINAGE Author: pjm File Name: CIVIL PLAN SET.pdf Will 7' of cover be maintained above the water service line? It is not recommended to have an infiltration system above the service line. Page: C.05 GRADING AND DRAINAGE Author: pjm File Name: CIVIL PLAN SET.pdf Snowmelt systems in the ROW shall be on a separate zone than the remainder of the snowmelt to protect the system if ROW work is ever required in this area. Page: C.05 GRADING AND DRAINAGE Author: pjm File Name: CIVIL PLAN SET.pdf This storm pipe could become damaged over time Page: C.06 SITE LAYOUT Author: pjm File Name: CIVIL PLAN SET.pdf Response to comments calls out that the transformer will need to be replaced. If this is accurate show new location of the transformer within the property limits. Provide documentation that proves the easement is finalized prior to building permit issuance. Screen rock beds were removed from the design as they are not an approved BMP per the URMP. Refer to this as the storage in the pervious paver subbase. Will 7' of cover be maintained above the water service line? It is not recommended to have an infiltration system above the service line. Snowmelt systems in the ROW shall be on a separate zone thanthe remainder of the snowmelt to protect the system if ROW work is ever required in this area. This storm pipe could become damaged over time Response to comments calls out that the transformer will need to be replaced. If this is accurate show new location of the transformer within the property limits. Provide documentation that proves the easement is finalized prior to building permit issuance. The table on sheet C.03 has been updated to describe a pervious paver subbase instead of a screened rock bed. It was also updated on page 6 of the drainage report. The cover on the water service will meet the 7' requirement as represented on the water trench detail on sheet C.08. Given the restraints of trees and other infiltration systems, the water service line has to be below either the pervious paver subbase or the biodetention basin. A note was added on sheet C.05 stating that the snowmelt within the right of way must be on a separate zone. Pipe depth exceeds recommended cover from manufacturer and there should not be any issues. The transformer does not need to be replaced with a larger unit, the service into the existing transformer will have to be upgraded. This doesn't require a larger transformer and the location will not have to be adjusted. Text on sheet C.05 has been adjusted for better clarification. 07/25/2018 Page: C.07 PROFILES AND SECTIONS Author: pjm File Name: CIVIL PLAN SET.pdf Call out percentages of sand, organic material and topsoil to meet URMP Page: C.08 DETAILS Author: pjm File Name: CIVIL PLAN SET.pdf Is this detail intended to be pervious? If so, the joints need to provide 8% void space required for pervioius pavers. Call out percentages of sand, organic material and topsoil to meet URMP JOB #: CHECKED BY:#DESCRIPTIONDATEDRAWN BYDRAWN BY:805 ROARING FORK ROADASPEN, CO 816112017-61 RBG 1PERMIT SET01/19/18JKE2COMMENT RESPONSES04/20/18JWJ3UPDATED PERMIT SET06/06/18JKE------------------------------------------------JKE Is this detail intendedto be pervious? If so, the joints need toprovide 8% voidspace required for pervioius pavers. Details on sheet C.07 have been updated to include this information. Detail has been updated to represent the snowmelted pervious pavers. see sheet C.08. 07/25/2018