Page: C.03 BASINS
Author: pjm
File Name: CIVIL PLAN SET.pdf
Screen rock beds were removed
from the design as they are not
an approved BMP per the
URMP. Refer to this as the
storage in the pervious paver
subbase.
CIVIL PLAN SET.pdf (7)
Page: C.05 GRADING AND DRAINAGE
Author: pjm
File Name: CIVIL PLAN SET.pdf
Will 7' of cover be maintained
above the water service line? It
is not recommended to have an
infiltration system above the
service line.
Page: C.05 GRADING AND DRAINAGE
Author: pjm
File Name: CIVIL PLAN SET.pdf
Snowmelt systems in the ROW
shall be on a separate zone than
the remainder of the snowmelt to
protect the system if ROW work
is ever required in this area.
Page: C.05 GRADING AND DRAINAGE
Author: pjm
File Name: CIVIL PLAN SET.pdf
This storm pipe could become
damaged over time
Page: C.06 SITE LAYOUT
Author: pjm
File Name: CIVIL PLAN SET.pdf
Response to comments calls out
that the transformer will need to
be replaced. If this is accurate
show new location of the
transformer within the property
limits. Provide documentation
that proves the easement is
finalized prior to building permit
issuance.
Screen rock beds
were removed from
the design as they
are not an approved
BMP per the URMP.
Refer to this as the
storage in the
pervious paver
subbase.
Will 7' of cover be
maintained above the
water service line? It
is not recommended
to have an infiltration
system above the
service line.
Snowmelt systems in
the ROW shall be on
a separate zone thanthe remainder of the
snowmelt to protect
the system if ROW
work is ever required
in this area.
This storm pipe could
become damaged
over time
Response to comments calls
out that the transformer will
need to be replaced. If this is
accurate show new location of
the transformer within the
property limits. Provide
documentation that proves the
easement is finalized prior to
building permit issuance.
The table on sheet C.03 has been updated to describe a pervious paver subbase instead of a
screened rock bed. It was also updated on page 6 of the drainage report.
The cover on the water service will meet the 7' requirement as represented on the water
trench detail on sheet C.08. Given the restraints of trees and other infiltration systems, the
water service line has to be below either the pervious paver subbase or the biodetention
basin.
A note was added on sheet C.05 stating that the snowmelt within the right of way must
be on a separate zone.
Pipe depth exceeds recommended cover from manufacturer and there should not be
any issues.
The transformer does not need to be replaced with a larger unit, the service into
the existing transformer will have to be upgraded. This doesn't require a larger
transformer and the location will not have to be adjusted. Text on sheet C.05 has
been adjusted for better clarification.
07/25/2018
Page: C.07 PROFILES AND SECTIONS
Author: pjm
File Name: CIVIL PLAN SET.pdf
Call out percentages of sand,
organic material and topsoil to
meet URMP
Page: C.08 DETAILS
Author: pjm
File Name: CIVIL PLAN SET.pdf
Is this detail intended to be
pervious? If so, the joints need
to provide 8% void space
required for pervioius pavers.
Call out percentages of
sand, organic material
and topsoil to meet
URMP
JOB #:
CHECKED BY:#DESCRIPTIONDATEDRAWN BYDRAWN BY:805 ROARING FORK ROADASPEN, CO 816112017-61
RBG
1PERMIT SET01/19/18JKE2COMMENT RESPONSES04/20/18JWJ3UPDATED PERMIT SET06/06/18JKE------------------------------------------------JKE
Is this detail intendedto be pervious? If so,
the joints need toprovide 8% voidspace required for
pervioius pavers.
Details on sheet C.07 have been updated to include this information.
Detail has been updated to represent the snowmelted pervious pavers. see sheet C.08.
07/25/2018