HomeMy WebLinkAboutFile Documents.805 Roaring Fork Rd.0235.2018.ARBK0235-2018-ARBK_BuildingComments_2
Page: A0.0 PROPOSED SITE PLAN &RREMP
File Name: Plan Set Change Order Rev 1.805 Roaring Fork
Road.2019.02.pdf
Subject: Group
Author: nickt
Color:
Coordinate the REMP snowmelt
areas between the architecturals
and mechanicals. You have the
same total but not the same
numbers for each area.
Coordinate.
Plan Set Change Order Rev 1.805 Roaring Fork Road.2019.02.pdf (1)
Page: S6.0 SPA AND SITE DETAILS
File Name: Structural Plan Set Change Order.805 Roaring
Fork Road.2019.02.pdf
Subject: PlanCheck
Author: nickt
Color:
Indicate insulation value on
architecturals as referenced by
structurals. Min R 15 per 2015
IECC R402.1.2. Also, the roof of
the vault must be insulated to
R-49.
Structural Plan Set Change Order.805 Roaring Fork Road.2019.02.pdf (1)
7876
7875
7876
T
PROPERTY LINE
EASEMENT
BUILDING SETBACK
FENCE
EXISTUTILITY
NEW TREE
NEW TREE
NEW TREE
ABANDON ASPER COAWATER SPECS
2REV 09-18-18
3REV 02-06-19
Coordinate the REMP snowmelt areas between the
architecturals and mechanicals. You have the sametotal but not the same numbers for each area.
Coordinate.
RREMP CALCULATIONS
ENTRY WALK/WALKWAY:673 SQ FTBATH STAIRS 67 SQ FTGARAGE DRIVE:689 SQ FTMUDROOM ENTRY/WALK: 98 SQ FT
TOTAL:1527 SQ FT
4'-0" MAX'-6"LE
JOINT
Z RB
9'-4"P0"CONC FTG
CONC FDN W W/ #4@18"OC AND #4@12"O CENTERED
#4 DOWEL @
T/FTG5'-6" MAX2'-6"3'-4"
VOID FORM
INSULATION, RE: ARCH
1" = 1'-0"2 SPA VAULT SECTION
Indicate insulation
value on architecturals
as referenced by
structurals. Min R 15
per 2015 IECC
R402.1.2. Also, the
roof of the vault must
be insulated to R-49.
snowmelt areas match. mechanical has the garage
drive and mudroom entry walk on a single manifold. We
further broke our numbers out, but overall they match.
Revision reference number = 5
Unit heater in the spa vault has been removed, therefore
we do not need insulation for the vault. All notes have
been revised.
On a related note, we have represented an
unconditioned non vented crawl space. This resulted in
the removal of wall insulation at the concrete walls,
therefore requiring no drywall ignition barrier.
Revision reference number = 5
04/24/2019