HomeMy WebLinkAboutFile Documents.546 McSkimming Rd.0190.2019 (2).ARBK0190-2019-arbk_building comments_1
Subject: PlanCheck
Page Label: 1
Page Index: 1
Author: tonyf
Date: 9/18/2019 3:04:54 PM
File Name: 546 MCSKIMMING_REMP calcs.pdf
Plunge pool must be included in
worksheet
546 MCSKIMMING_REMP calcs.pdf (1)
Subject: PlanCheck
Page Label: 1
Page Index: 1
Author: tonyf
Date: 9/18/2019 3:13:26 PM
File Name: 546 McSkimming_Roof Plan.pdf
Show locations of solar panels
546 McSkimming_Roof Plan.pdf (1)
Name:City: ASPEN
Address:State: CO
Email:Zip Code: 81611
Phone: Cell Phone:
`
A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool, spa, and solar/GSHP information:SP-01
Do you have snowmelt or a spa that has been exempted by the buiding official?
Hydro Snowmelt Electric Snowmelt Pool Spa
ExistingTo be Demoed
Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftNew (non-exempt)2164.00 sqft
New (exempt)Total New 2164.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
Total on site 2164.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
Total Snowmelt on siteBoiler Efficiency 97.0%100%75.0% 75.0%
Mitigation Payment -$ -$ Total Payment for Mitigation:75,851.55$
B.ON-SITE RENEWABLE CREDITS Supplemental System REMP Credit
Use PV WorksheetPhotovoltaic System 76,269.18$ Use Thermal WorksheetHot Water Panels -$
Use GSHP Cert Ground Source Heat Pump -$
Other Approved System -$
Total Mitigation Credits:76,269.18$
Onsite Renewable Offsets: How many KiloWatts of PV (solar electric) would I need? 11.05
or How many square feet of SHW (solar hot water) would I need? 337.64
R-REMP Payment:-$
Amount Previously Paid on This Permit:-$
Refund (includes minus $750): -$
C. PREPARED BY:Date:30-May-19
Print Name:
Signature:
Phone & EMail:
REVIEWED:Date:
432a EAST HYMAN AVE
TIM@ZONE4ARCHITECTS.COM
ZONE 4 ARCHITECTS LLC / TIM ANDRULAITIS
970.429.8470 COLLEEN@ZONE4ARCHITECTS.COM
$75,851.55
970.429.8470
TOTAL R-REMP PAYMENT:
ZONE 4 ARCHITECTS LLC / COLLEEN LOUGHLIN
2164.00 sqft
Plunge pool must be
included in worksheet
01A504
18'-1"3'-11"1 +/- 2'-7 5/8"EXIST. V.I.F.3'-11"+/- 1'-6 1/2"EXIST. V.I.F.20'-7 1/8"7"
6'-8 3/4"4'-9/16"3'-1 3'-7 23/64"3'-7 23/64"2'-5 7/8"3'-0"4'-6 1/64"
3'-0"
3'-3 23/64"
EL. 110'-9 1/2"
EL. 110'-1 1/2"3" : 12"SLOPE2 1/8" : 12"SLOPE2 1/8" : 12"SLOPE2 1/4" : 12"SLOPE2 1/2" : 12"SLOPE2 1/2" : 12"SLOPE2 1/4" : 12"SLOPE2 1/4" : 12"SLOPE2 1/2" : 12"SLOPE2 1/2" : 12"SLOPE1/4" : 12"SLOPE1/4" : 12"SLOPEDS.
DS.
DS.
DS.DS.DS.
DS.
S, TYP.
DS.
NE OFELOW
WATERPROOFRECEPTACLE ONSIDEWALL
R 2015003.9.1
T.O. PLATE
T.O. PLATE
PROPOSED RADONMITIGATION PIPE
FASCIA OF EXISTINGROOF TO ALIGN WITHNEW FASCIA
2" : 12"SLOPEV.I.F. TOMATCHEXISTINGV.I.F.V.I.F.TO MATCHTO MATCHV.I.F.V.I.F.V.I.F.V.I.F.V.I.F.OUTLINE OF KNEEWALL BELOW
DECK1/4" : 12"SLOPE1
2 3 4 5 6
7 8 9 10 11 12 13
14 15 16
17
18
19
20
21
22 23 24 25
28 29
30 31 32
26 27
33 34
35 36
37 38 39
30' FRONT YARDSETBACK DASHED FORREFERENCE
PROPOSED FLUELOCATION
3'-0"Show locations of
solar panels