Loading...
HomeMy WebLinkAboutFile Documents.546 McSkimming Rd.0190.2019 (6).ARBK0190-2019-arbk_building comments_1 Subject: PlanCheck Page Label: 1 Page Index: 1 Author: tonyf Date: 9/18/2019 3:04:54 PM File Name: 546 MCSKIMMING_REMP calcs.pdf Plunge pool must be included in worksheet 546 MCSKIMMING_REMP calcs.pdf (1) Subject: PlanCheck Page Label: 1 Page Index: 1 Author: tonyf Date: 9/18/2019 3:13:26 PM File Name: 546 McSkimming_Roof Plan.pdf Show locations of solar panels 546 McSkimming_Roof Plan.pdf (1) Name:City: ASPEN Address:State: CO Email:Zip Code: 81611 Phone: Cell Phone: ` A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt, pool, spa, and solar/GSHP information:SP-01 Do you have snowmelt or a spa that has been exempted by the buiding official? Hydro Snowmelt Electric Snowmelt Pool Spa ExistingTo be Demoed Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftNew (non-exempt)2164.00 sqft New (exempt)Total New 2164.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Total on site 2164.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Total Snowmelt on siteBoiler Efficiency 97.0%100%75.0% 75.0% Mitigation Payment -$ -$ Total Payment for Mitigation:75,851.55$ B.ON-SITE RENEWABLE CREDITS Supplemental System REMP Credit Use PV WorksheetPhotovoltaic System 76,269.18$ Use Thermal WorksheetHot Water Panels -$ Use GSHP Cert Ground Source Heat Pump -$ Other Approved System -$ Total Mitigation Credits:76,269.18$ Onsite Renewable Offsets: How many KiloWatts of PV (solar electric) would I need? 11.05 or How many square feet of SHW (solar hot water) would I need? 337.64 R-REMP Payment:-$ Amount Previously Paid on This Permit:-$ Refund (includes minus $750): -$ C. PREPARED BY:Date:30-May-19 Print Name: Signature: Phone & EMail: REVIEWED:Date: 432a EAST HYMAN AVE TIM@ZONE4ARCHITECTS.COM ZONE 4 ARCHITECTS LLC / TIM ANDRULAITIS 970.429.8470 COLLEEN@ZONE4ARCHITECTS.COM $75,851.55 970.429.8470 TOTAL R-REMP PAYMENT: ZONE 4 ARCHITECTS LLC / COLLEEN LOUGHLIN 2164.00 sqft Plunge pool must be included in worksheet 01A504 18'-1"3'-11"1 +/- 2'-7 5/8"EXIST. V.I.F.3'-11"+/- 1'-6 1/2"EXIST. V.I.F.20'-7 1/8"7" 6'-8 3/4"4'-9/16"3'-1 3'-7 23/64"3'-7 23/64"2'-5 7/8"3'-0"4'-6 1/64" 3'-0" 3'-3 23/64" EL. 110'-9 1/2" EL. 110'-1 1/2"3" : 12"SLOPE2 1/8" : 12"SLOPE2 1/8" : 12"SLOPE2 1/4" : 12"SLOPE2 1/2" : 12"SLOPE2 1/2" : 12"SLOPE2 1/4" : 12"SLOPE2 1/4" : 12"SLOPE2 1/2" : 12"SLOPE2 1/2" : 12"SLOPE1/4" : 12"SLOPE1/4" : 12"SLOPEDS. DS. DS. DS.DS.DS. DS. S, TYP. DS. NE OFELOW WATERPROOFRECEPTACLE ONSIDEWALL R 2015003.9.1 T.O. PLATE T.O. PLATE PROPOSED RADONMITIGATION PIPE FASCIA OF EXISTINGROOF TO ALIGN WITHNEW FASCIA 2" : 12"SLOPEV.I.F. TOMATCHEXISTINGV.I.F.V.I.F.TO MATCHTO MATCHV.I.F.V.I.F.V.I.F.V.I.F.V.I.F.OUTLINE OF KNEEWALL BELOW DECK1/4" : 12"SLOPE1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 28 29 30 31 32 26 27 33 34 35 36 37 38 39 30' FRONT YARDSETBACK DASHED FORREFERENCE PROPOSED FLUELOCATION 3'-0"Show locations of solar panels See the attached updated REMP form with 96.00 s.f. of plunge pool included to update the REMP fee. The PV worksheet has also been updated to account for additional solar panels. Sheet A304 showed the solar panel layout with dashed rectangles. For clarity, sheet A304 has shaded these panels in and added a notation calling them out (46 in total). 10/01/2019