HomeMy WebLinkAboutFile Documents.546 McSkimming Rd.0190.2019 (23).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
09/11/2019
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
SEE NOTES #1 PLANS
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
X
0190.2019.arbk 10/2/2019
2164 sf
96 sf
0
TF
13.22 KW
Snowmelt plan, roof plan
10/02/2019
tonyf
97%
FIRE
SPRINKLERS
REQUIRED
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
_______________
_______________
_______________ _______________ _______________
_______________
_______________ _______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
Engineering
Review
Zoning
Review (50%)
School Lands
Dedication
Zoning
Review (50%)
CMP (50%)TDM Impact
Energy Code
Review
REMP
Payment
Pedestrian
Amenity
CMP (50%)GIS Housing Cash in Lieu
Parks Review City Use
Tax Water Tap
Utility Review County Use
Tax Sanitation
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartmentReviewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel.
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
HARDSCAPEAREA
NeedsReview
DEFINITIONSZONEDISTRICT
Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area
Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
08.06.2019 0142.2018.ARBK 0190.2019.ARBK
546 McSkimming 273718102002
3 3 Aspen Grove Subdivision
KArin G LLC 305.793.2753 JP@PAG.LAW
Zone 4 Architects 970.429.8470 tim@zone4architects.com
site wall, on-grade patios, plunge pool, ADA path from drive to lower yard and retaining walls along
driveway.
700,000
NA
NA
19,100 sq ft
6395 sq ft
NA
NA
7605 sq ft
R-15B
X ll 8/8/2019
X BN 9/11/19
X
X
25.00 738.69 X JD 10/10/2019
650.00 (hourly)185.68
X AR 9/25/19
82.68
0 X
6851.98 X
3137.24
08/08/2019
TF 10/2/2019
TF 10/2/2019
rm 10/8/19
rm 10/8/19
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
All applicaions for a building permit within the City of Aspen are required to include a ceriicaion of compliance with applicable covenants and homeowner associaion policies. The ceriicaion must be signed by the property owner or atorney represening the property owner. The following ceriicaion shall accompany the applicaion for a permit.
___________________________________ _________ ___________________________
I, the property owner, cerify as follows: (pick one)
This property is not subject to a homeowners associaion or other form of private covenant.
This property is subject to a homeowners associaion or private covenant and the improvements proposed in this building permit do not require approval by the homeowners associaion or covenant beneiciary.
This property is subject to a homeowners associaion or private covenant and the improvements proposed in this building permit have been approved by the homeowners associaion or covenant beneiciary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or efect of private covenants or homeowner associaion rules or bylaws. I understand that this document is a public document.
Owner Signature ____________________________ Date _________________
Owner Printed Name ________________________
OR
Owner’s Atorney Signature ___________________________ Date _________________
Owner’s Atorney Printed Name _______________________
ADDRESS UNIT #PARCEL ID #
ADDRESS: ____________________________ PERMIT NUMBER: _______________________________
January 2018
546 MCSKIMMING RD. ASPEN, CO 81611 273718102002
X
546 MCSKIMMING RD. ASPEN, CO 81611
08/08/2019
0190.2019.ARBK
KARIN G LLC
546 MCSKIMMING
273718102002
106462#
City of Aspen Version 11.3 Updated December 13, 2017
PROJECT ADDRESS:546 MCSKIMMING ROAD ASPEN CO 81611
Parcel ID #: 273718102002 Permit Number:
Collector
Aspect,
Degress from
True South
Collector Tilt,
Degrees From
Horizontal
Solar
Orientation
Adjustment
Factor
DC side
capacity (kW)
Inverter capacity
(kW)
kW for
credit
kW Mitigation
Credit
Collector Group 1 48 12 91.00%13.53 13.12 13.12 11.94 kW
Collector Group 2 128 12 79.95%1.65 1.6 1.6 1.28 kW
Collector Group 3 87.00%0 0.00 kW
Collector Group 4 87.00%0 0.00 kW
Collector Group 5 87.00%0 0.00 kW
Collector Group 6 87.00%0 0.00 kW
Collector Group 7 87.00%0 0.00 kW
Collector Group 8 87.00%0 0.00 kW
Collector Group 9 87.00%0 0.00 kW
Collector Group 10 87.00%0 0.00 kW
Collector Group 11 87.00%0 0.00 kW
Collector Group 12 87.00%0 0.00 kW
Collector Group 13 87.00%0 0.00 kW
Collector Group 14 87.00%0 0.00 kW
Collector Group 15 87.00%0 0.00 kW
Collector Group 16 87.00%0 0.00 kW
Collector Group 17 87.00%0 0.00 kW
Collector Group 18 87.00%0 0.00 kW
Collector Group 19 87.00%0 0.00 kW
Collector Group 20 87.00%0 0.00 kW
Total:13.22 kW
$ Mitigation Credit:($90,748.85)
Instructions:
1)Determine how many collector groups you have. Groups are used to differentiate between collectors
(panels) with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily,
you might have just one group.
2)Enter the aspect and tilt for each group. The solar orientation adjustment factor is automatically
calculated.
3)DC side capacity is the total labled panel output kW in a group.
4)Inverter capacity is the recommended input power in kW of your inverter(s).
5)You will be given credit for the lesser of the labeled panel output or the inverter.
6)The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
7)The kW mitigation credit is totalled and multiplied by $6865.32/kW to get the $ Mitigation Credit
8)The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP
and CREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP payment.
PREPARED BY:Date:25-Sep-19
Print Name:Green Electrical Solutions / JAY BURE
Signature:
Phone & EMail:970.927.8658 JAY@GREENELECTRICAL.SOLUTIONS
REVIEWED:Date:
25-Sep-19
10/01/2019
0190.2019.ARBK
10/02/2019
tonyf
DAM 10/14/19
3